| 1 | Prestressed / reinforced cement concrete grade M-20 & above. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres. by mechanical means as per MoRT&H specification clause No. 2.04 B I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 2 | Dismantling Brick / Tile work/rubble masonary/ pitching/ etc. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres. by mechanical means as per MoRT&H specification clause No. 2.04 A I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 3 | Deduction for old bricks received I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 4 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per MoRT&H specification clause No. 12.01,304, Mechanical Means (Depth upto 3 m) I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 5 | Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Technical Specifications no. 12.25, 1100 & 1700 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 6 | Cement Concrete for Reinforced Concrete M 35 Grade (RCC Grade M35 using batching plant transit mixer & Concrete pump) in Pile Cap complete as per Drawing and Technical Specification No. 12.40D case I, 1100, 1500 & 1700 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 7 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. as per MoRT&H specification clause No 1600, 12.42 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 8 | Providing Steel Liner 10 mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing. as per MoRT&H specification clause No 1200 & 1900, 12.22 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 9 | Plain/Reinforced cement concrete M 35 Grade in sub-structure complete as per drawing and Technical Specifications as per MoRT&H specification clause No 1500, 1700 & 2200, 13.05 H (p) I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 10 | Plain/Reinforced cement concrete M 35 Grade in sub-structure complete as per drawing and Technical Specifications as per MoRT&H specification clause No 1500, 1700 & 2200, 13.05 H (q) I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 11 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in substructure complete as per Drawing and Technical Specifications. as per MoRT&H specification clause No1600 & 2200, 13.06 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 12 | Furnishing and Placing Reinforced/ Prestressed cement concrete M-40 (Using Batching Plant, Transit Mixer and Concrete Pump) including formwork in superstructure as per drawing and Technical Specification as per MoRT&H specification clause No 1500, 1600 & 1700, 14.01E (i)(p) I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 13 | Furnishing and Placing Reinforced/ Prestressed cement concrete M-35 (Using Batching Plant, Transit Mixer and Concrete Pump) including formwork in superstructure as per drawing and Technical Specification as per MoRT&H specification clause No 1500, 1600 & 1700, 14.01D (i)(p) I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 14 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in super structure complete as per Drawing and Technical Specifications. as per MoRT&H specification clause No 1600, 14.02 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 15 | Strip Seal Expansion Joint Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation. as per MoRT&H specification clause No 2607, 14.21 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 16 | PCC M15 Grade (PCC Grade M15 using batching plant & manual placing) leveling course below approach slab complete as per drawing and Technical specification as per MoRT&H specification clause No 2700, 14.10 case II I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 17 | Reinforced cement concrete approach slab including M30 grade and formwork complete as per drawing and Technical specification. as per MoRT&H specification clause No 1500, 1600, 1700 & 2704, 14.11 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 18 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. as per MoRT&H specification clause No 2702, 14.04 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 19 | Supplying, fitting and fixing in position true to line and level POT-PTFE Free bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete as per drawing and approved Technical Specifications. as per MoRT&H specification clause No 2000 & 2200, 13.18 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 20 | Supplying, fitting and fixing in position true to line and level POT-PTFE Longitudinal Guided bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete as per drawing and approved Technical Specifications. as per MoRT&H specification clause No 2000 & 2200, 13.18 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 21 | Supplying, fitting and fixing in position true to line and level POT-PTFE Fixed bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete as per drawing and approved Technical Specifications. as per MoRT&H specification clause No 2000 & 2200, 13.18 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 22 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. as per MoRT&H specification clause No 2504, 16.05 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 23 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications as per MoRT&H specification clause No 2504, 16.04 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 24 | Plain cement concrete 1:2:4 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in below pile cap foundation and compacted by vibration including curing for 14 days. as per MoRT&H specification clause No 2100, 12.04 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 25 | Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. as per MoRT&H specification clause No 2503, 16.02 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 26 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRT&H specification clause No. 406B, 4.14 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 27 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per technical specificaton clause 502 I/c all cess, Labour cess, levy, toll fee, royalty, cost of bitumen emulsion (S.S. Type) Contractor Profit but excluding GST. I/c all taxes, Labour cess, levy, toll fee, royalty, cost of Bitumen Emulsion, Contractor Profit but excluding GST. |
| 28 | Providing and applying tack coat with bitumen VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface with hydralic broom as per technical specificaton clause 503. I/c all taxes, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST. I/c all taxes, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST. |
| 29 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 505, 5.04 complete in all respects. I/c all taxes, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST. |
| 30 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.40 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with mechanical control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507, 5.5 I/c all taxes, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST. Please Enable Macros to View BoQ information |