| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres (i/c Labour Cess and Excluding GST) |
| 2 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. (i/c Labour Cess and Excluding GST) |
| 3 | Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.as per drawing and technical speficiations Clauses 802,803,1202 & 1203. (i/c Labour Cess and Excluding GST) |
| 4 | Granular Sub-base with Well Graded Material (Table 400.1) (A)By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(i)For Grading I Material. (i/c Labour Cess and Excluding GST) |
| 5 | Furnishing and placing reinforced cement concrement in super structure as per drawing and Technical Specifications Clause 800,1205.4 and 1205.5 RCC Grade M 30 (i/c Labour Cess and Excluding GST) |
| 6 | Supplying fitting and placing mild bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses 1002, 1010 and 1202 . (i/c Labour Cess and Excluding GST) |
| 7 | Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 (i/c Labour Cess and Excluding GST) |
| 8 | Drainage spouts complete as per drawing and technical specifications Clause 1209 (i/c Labour Cess and Excluding GST) |
| 9 | Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. (i/c Labour Cess and Excluding GST) |
| 10 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302.(i/c Labour Cess and Excluding GST) |
| 11 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications (i/c Labour Cess and Excluding GST) |
| 12 | Approch Road Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5. (i/c Labour Cess and Excluding GST) |
| 13 | Granular Sub-base with Well Graded Material (Table 400.1) (A)By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(i)For Grading I Material.(i/c Labour Cess and Excluding GST) |
| 14 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (i/c Labour Cess and Excluding GST) |
| 15 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means. (i/c Labour Cess and Excluding GST) |
| 16 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.(i/c Labour Cess and Excluding GST) |
| 17 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (i/c Labour Cess and Excluding GST) |
| 18 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects(i/c Labour Cess and Excluding GST) |
| 19 | Diversion Construction of Subgrade with Material Obtained from Borrow Pits (For Local Earth Work) Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5.(i/c Labour Cess and Excluding GST) |
| 20 | Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls .(i/c Labour Cess and Excluding GST) |
| 21 | First Class brick on edge flooring laid dry joints sand filled including preparation of base to proper slope and its ramming and including supply of all materials, labour & T&P etc, required for proper completion of the work.AS Per SoR Item No-615 (i/c Labour Cess and Excluding GST) Please Enable Macros to View BoQ information |