| 1 | Earth work in excavation in foundations, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. |
| 2 | Dismantling: Lime concrete,cement concrete of 1:6:12 or leaner mix. |
| 3 | Dismantling: Reinforced cement concrete. |
| 4 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) |
| 5 | Centring and shuttering for columns (Square or rectangular or poly gonal in plain) |
| 6 | Cement Concrete 1:6:12 with stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type |
| 7 | Cement Concrete 1:5:10 with stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type |
| 8 | Cement Concrete 1:2:4 with stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type |
| 9 | Reinforced cement concrete M20 mechanically batch mixed using batch type concrete mixer as per IS 1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth |
| 10 | Reinforced cement concrete M20 mechanically batch mixed using batch type concrete mixer as per IS 1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure |
| 11 | First class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth. |
| 12 | First Class Burnt Brick Work laid in cement sand mortar 1:5 in first storey upto 4 metres above plinth level. |
| 13 | 115mm thick brick wall in cement sand mortar 1:4 without reinforcement in foundations and plinth |
| 14 | Conglomerate floor 25mm thick cement concrete topping 1:2:4 using mechanical mixer for mixing of material |
| 15 | Conglomerate floor 50mm thick cement concrete topping 1:2:4 using mechanical mixer for mixing of material |
| 16 | 12.5 mm thick cement plaster 1:3 |
| 17 | 12.5 mm thick cement plaster 1:4 |
| 18 | 12.5 mm thick cement plaster 1:5 |
| 19 | 20mm thick Cement Plaster 1:4 in two coats work |
| 20 | Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars Fe 500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete (Labour Rate) |
| 21 | Brick on end edging Providing and laying of Brick on end edging 6.83cm wide, 11.11cm long and 22.86cm high half brick deep including excavation, refilling and disposal of surplus earth up to 50mtr complete as per Punjab PWD specifications. |
| 22 | Cable Racks of varios sizes |
| 23 | Providing and Fixing Angle iron Nozzing 50x50x3 for cable trenches |
| 24 | Suppling and Hoisting of Ferro Cement Trench Covers of size 1'9\\" x 2'6\\" T-4 Type |
| 25 | Suppling and Hoisting of Ferro Cement Trench Covers of size 2'2\\" x2'2\\" T-3 type |
| 26 | Cement Slurry of cement to sand ratio 1:6 with cement content not less than 150kg/100 sqm |
| 27 | Suppling & laying of gravel as per AOR |
| 28 | Concrete 1:5:10 with crushed stone & 25 mm Stone Aggregate Laying PCC Flooring as per AOR |
| 29 | P&F Template along with foundation bolts as per drawing |
| 30 | Recovery of steel scrap |
| 31 | Carriage of material rates |
| 32 | Cement |
| 33 | Steel |
| 34 | Fine sand |
| 35 | Carriage and Difference of material rates |
| 36 | 12/13.2 mm Crushed Bajri |
| 37 | Bricks |
| 38 | 10mm/ 11.20 mm Crushed Bajri |
| 39 | Coarse Sand |
| 40 | Stone Metal 40mm Please Enable Macros to View BoQ information |