|
| 1 | Supply, Installation, Testing and commissioning of Online Effluent Quality Monitoring System with complete Engineering Panel, Cloud connector (Devices) for online server connectivity with all electronics for monitoring parameters includingCOD, BOD, TSS and pH including online data transfer to HSPCB, CPCB and PHED website on daily basis complete at existing 3 Nos STP in Rewari Town for online (continuous) measurement of PH, Total suspended solids (TSS), Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors (Spectral measurement in the UV-VIS range 200-720 mm and other letest parameter (required time to time) as per CPCB/HSPCB) performing reagent and chemical free analysis with automatic cleaning of censor, single cables and power cables, local data acquisition and display of data on continuous basis for up linking the date to CPCB, HSPCB and PHED, TUV approved complete in all respects as per Central Pollution Control Board (CPCB) guidelines for online continuous monitoring system for effluents and as contained in scope of work in the notice inviting tender. A) Multi-Parameter measuring converter, for connecting upto 18 intelligent sensors, scope includes 6 analog outputs (0/4-20mA), widerangepower supply Optical COD/BOD and TSS probe with spectral processing of the UV-VIS range, for measurement in the inlet/ effluent/ BNR part of municipal waste water treatment plants at various Locations in Haryana State with integrated with automatic cleaning. B) Robust digital pH/ORP sensor for pH/ORP electrodes, with built-in pre-amplifier and temperature sensor with Automatic Temperature Compensation (ATC), Cable length 100 meter (minimum) C) Sensor adapter cable for all intelligent sensors, with lP68 water proof connection to the intelligent Sensor Net system, Cable length 100 meter (minimum). D) Data transfer to CPCB, HSPCBand PHED servers complete as per satisfaction of Engineer-in-Charge E) Providing GSM 4G/5G/ latest modem with mobile.1 no. for 6.5 MLD STP at kaluwas, Rewari Town1 No for 8 MLD STP at Nasia JI Road Rewari Town.1 No for 16 MLD STP at Nasia JI Road Rewari Town. |
| 2 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defect liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device(one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD, 16 MLD and 6.5 MLD STP for 2nd year |
| 3 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defect liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device(one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liabilityperiod. 8 MLD, 16 MLD and 6.5 MLD STP for 3rd year |
| 4 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one yeardefect liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liabilityperiod. 8 MLD, 16 MLD and 6.5 MLD STP for 4th year |
| 5 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defectliability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD,16 MLD and 6.5 MLD STP for 5th year |
| 6 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defectliability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD,16 MLD and 6.5 MLD STP for 6th year |
| 7 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defectliability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD,16 MLD and 6.5 MLD STP for 7th year |
| 8 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defectliability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD,16 MLD and 6.5 MLD STP for 8th year |
| 9 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defectliability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD,16 MLD and 6.5 MLD STP for 9th year |
| 10 | Maintenance {Including comprehensive annual maintenance contract (CAMC)} including data transfer to CPCB, HSPCB and PHED serves, installation of GSM 4G, 5G modem with active SIM Cards, network charges for 3 months trial run period, one year defect liability period and 9 years thereafter after the date of commissioning. Maintenance of online e uent monitoring Device (one year defect Liability period after 3 months trial run period) (The maintenance will be Chargable after one year defect Liability period. 8 MLD,16 MLD and 6.5 MLD STP for 10th year Please Enable Macros to View BoQ information |