| 1 | Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for Bridge work. |
| 2 | Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.(In Bridge Work)( Including Labour Cess And Excluding G.S.T.) |
| 3 | Plane/Reinforced Cement concrete in open foundation complete as per drawing and Technical Specifications. M15 (In Bridge Work).( Including Labour Cess And Excluding G.S.T.) |
| 4 | Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations (In Bridge Work).( Encluding Labour Cess And Excluding G.S.T.) |
| 5 | Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification.(In Bridge Work).( Encluding Labour Cess And Excluding G.S.T.) |
| 6 | Providing weep holes in brick massonry abutment wing walls/ return wall with 100mm dia AC pipe, extented to the full widthof the structure with slope 1V:20H.( Encluding Labour Cess And Excluding G.S.T.) |
| 7 | Furnishing and placing reintforced cement concrete in super structure as per drawing and Technical Specifications. M25 (Including Labour Cess And Excluding G.S.T.) |
| 8 | Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses..( Including Labour Cess And Excluding G.S.T.) |
| 9 | Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for Protection work.( Encluding Labour Cess And Excluding G.S.T.) |
| 10 | Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.(In Protection Work)( Including Labour Cess And Excluding G.S.T.) |
| 11 | Plane/Reinforced Cement concrete in open foundation complete as per drawing and Technical Specifications. M15 (In Protection Work).( Including Labour Cess And Excluding G.S.T.) |
| 12 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification.( Encluding Labour Cess And Excluding G.S.T.) |
| 13 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications..( Encluding Labour Cess And Excluding G.S.T.) |
| 14 | Construction of embankment with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2..(Local Earth in App.) (Including Labour Cess And Excluding G.S.T.) |
| 15 | Providing, laying and spreading material on a prepared sub grade, adding cement @ 2% by weight to the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to from a layer of sub-base.(Including Labour Cess And Excluding G.S.T.) |
| 16 | Providing, laying and spreading material on prepared sub-base, cement @ 4% by weight to the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to from a layer of base..( Including Labour Cess And Excluding G.S.T.) |
| 17 | Construction of earthen shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2..(Local Earth in App.) (Including Labour Cess And Excluding G.S.T.) |
| 18 | Providing and applying tack coat with Bitumen V.G._10 using Bitumin pressure distributor at the rate of 0.35 kg per sqm on the prepared surface cleaned with hydraulic broom .( Encluding Labour Cess And Excluding G.S.T.) |
| 19 | Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat .( Encluding Labour Cess And Excluding G.S.T.) |
| 20 | Providing and laying seal coat 'C' Type sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall .( Encluding Labour Cess And Excluding G.S.T.) Please Enable Macros to View BoQ information |