| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 2 | Construction of embankment with approved materials obtained from borrow pits by mechanical means graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 3 | Earthwork in excavation for foundation of structures in all types of soil as per drawing and technical specification Clause 305 and 1104 of MoRD includding setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all lead & lift, dressing of sides and bottom and back filling with excavated suitable material upto 3mt. as per direction of Engineer-in-Charge. |
| 4 | Construction of embankment with approved materials deposited at site from road-way cutting and other structures with all lifts and leads graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 5 | Fine dressing and providing, laying turfing with live sods of perennial turf forming grass on embankment slope, verges or other locations including preparation of ground, fetching of sods with all lifts and leads upto 5 Km. and watering complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 307 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 6 | Providing and constructing well compacted drainage layer above the subgrade of roadwork with approved quality of dust free washed coarse to medium sand as per Clauses 5.8 and 6.6 of SP:20-2002. |
| 7 | Providing and laying Granular Sub-base with Grading-III stone screening materials as per Table 400-1 as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 401 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 8 | Providing Wet Mix Macadam using crushed stone aggregates as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 406 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 9 | Providing and applying primer coat with slow setting bitumen emulsion on prepared surface of granular base, including clearing road surface and spraying primer using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 502 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 10 | Providing and applying tack coat with rapid setting bitumen emulsion on the prepared bituminous/ granular surface including cleaning with mechanical broom and spraying bitumen emulsion using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 503 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 11 | Providin & laying Semi Dense Bituminous Concret with batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to site, laying with a hydrostatic paver finisher with sensore control to the required grade, level & alingment, roling with smooth wheeled,vibratory & tandem rollers to achieve the desire compaction as per clause 508 of MoSRT&H Specifications for road and bridge works (4th Revision) Page -175 item - 47 |
| 12 | Plain cement concrete M-15 grade in Foundation complete as per drawing and technical specification. |
| 13 | Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M-30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction, expansion and construction joints, applying sealant, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification as per direction of the Engineer-in-Charge. |
| 14 | CULVERTS & PROTECTION Earth work in excavation in all kinds of soil for road works with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and technical specification, including setting out, dressing of section to correct line, level, grade & camber for road work or dressing of sides and bottom for foundation of structures and loading into tippers, transporting to embankment site within all lifts and lead upto 1000mtr. and utilising the surplus earth locally for road work wherever required, backfilling the excavation earth to the extent required etc complete in all respect as per clause 301 & 304 of Specification for road & bridge work of MORT&H (5th Revision) & Direction of Engineer in charge. |
| 15 | Providing, filling clean sand of approved quality in road work for construction of drainage layer and foundation trenches of structures in uniform layers, watered and rammed/ compacted as per approved drawing and technical specifications complete in all respect as per Section 900, 2100 and Clause 401 & 304 of MoRT&H specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 16 | Providing and laying Plain cement concrete of grade M-15 in foundation of CD works etc without formwork using 40mm to 10mm size crushed stone aggregates etc complete as per drawing and technical specification using High Strength approved quality Cement and coarse granite aggregate conforming to Table 1000-1 with formwork as per Section 900,1000,1500,1700, 2100, 2200 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. Foundation |
| 17 | Substructure |
| 18 | Providing and laying R.C.C M-25 grade in CD works as per approved drawing and technical specifications complete in all respect as per section 900, 1000, 1500, 1700, 2100, 2200 & 2300 of MoRT&H specifications for Road & Bride works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. Foundation |
| 19 | Substructure |
| 20 | Superstructure |
| 21 | Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications direction of Engineer in charge. |
| 22 | Providing and laying R.C.C M-30 grade in wearing coat excluding cost of steel reinforcement for finished item of work as per approved drawing and technical specifications complete in all respect as per Section 900, 1000, 1500,1600, 1700 & 2702 of MoRT&H specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 23 | Supplying, cutting, bending, binding, straightening, placing HYSD bars confirming to grade IS:1786-(Fe-500) for steel reinforcement works for finished item of work as per approved drawing and technical specifications complete in all respect as per section 900,1000 & 1600 of MoRT&H specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 24 | Providing, laying and fixing in position reinforced cement concrete NP3 hume pipes for culverts on first class bedding of granular materials including pointing ends fixing collars with cement mortar 1:3 for finished item of work as per approved drawing and technical specifications complete in all respect as per Section 900, 1000 & 2900 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. 600 mm dia Single row |
| 25 | 1000 mm dia Single row |
| 26 | Rough stone dry packing in aprons and revetments with hard granite stone of size 30 cm and above as per approved drawing and technical specifications complete in all respect as per Section 900, 1000 and 2500 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 27 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 and as per the direction of the Engineer-in-charge. |
| 28 | Providing weep holes in abutment, wing wall, retaining wall, toe wall and RCC drain etc with 100mm dia A.C. pipe as per approved drawing and technical specifications complete in all respect as per Section 2200 & Clause 2706 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 29 | Providing and fixing of typical citizen information board as per MORD specifications and drawing. Three MS Plates of 50x5mm mm thick, back plate duly welded with 75mm dia steel tubes back on edges as per drawings. The upper & lower plate will be welded with MS flat iron frame of 50mmx5mm. The steel tubes duly embedded in cement concrete M-15 grade blocks of 600mm x 600mm x 750mm below ground level.All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexture 1700.1. |
| 30 | Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of Class-B Type-IV recto reflective sheeting fixed over 2mm thick alumunium sheeting , 3mm/4mm thick alumunium composite material sheet depending on the size of sign vide Clause No. 801.3 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) fixed over back support frame of min 25x25x3 mm angle mounted on a mild steel cicular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properly designed foundation with M-25 grade cement concrete 45cmx45cm x 60 cm, 60cm below ground level as per approved drawing including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. The sign shall be maintained as per Section 12 of IRC-67. 600mm equilateral triangle |
| 31 | 600mm Circular |
| 32 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. |
| 33 | Providing and fixing of typical MMSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing . |
| 34 | Providing & fixing RCC M-15 grade 5th Km. stone, Ordinary Km. stone and Hectometre stone along with reinforcement for finished item of work as per drawing as per IRC -25 / 1967 & IRC-8-1980 fixed in position including finishing and lettering, painting as per approved drawing and technical specification complete in all respect as per Clause No. 805 & Section 800, 900, 1000, 1500, 1600, 1700 of MoRT&H specification for road & bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. Fixing of 5th. Km. Stone |
| 35 | Fixing of Km. Stone |
| 36 | Fixing or 200m Stone |
| 37 | Providing and fixing R.C.C. M-15 grade guard posts of 1.00metre height and 15 cm diameter including cost of steel reinforcement for finished item of work as per approved drawing and technical specifications complete in all respect as per Section 800, 900, 1000, 1500, 1600 & 1700 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 38 | Maintenance Restoration of rain cuts with soil, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MORD technical specifications Clause 1902 by manual means as per direction of the Engineer in charge1st Year |
| 39 | 2nd Year |
| 40 | 3rd Year |
| 41 | 4thYear |
| 42 | 5th Year |
| 43 | Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MORD technical specification Clause 1903 as per direction of the Engineer in charge. 1st Year |
| 44 | 2nd Year |
| 45 | 3rd Year |
| 46 | 4thYear |
| 47 | 5th Year |
| 48 | Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903. 1st Year |
| 49 | 2nd Year |
| 50 | 3rd Year |
| 51 | 4thYear |
| 52 | 5th Year |
| 53 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type C as per MORD technical specification Clause 503,508,510,1904 as per direction of the Engineer in charge. 1st Year |
| 54 | 2nd Year |
| 55 | 3rd Year |
| 56 | 4thYear |
| 57 | 5th Year |
| 58 | Cutting of branches of trees from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge. 1st Year |
| 59 | 2nd Year |
| 60 | 3rd Year |
| 61 | 4thYear |
| 62 | 5th Year |
| 63 | Cutting of shurb from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.1st Year |
| 64 | 2nd Year |
| 65 | 3rd Year |
| 66 | 4thYear |
| 67 | 5th Year |
| 68 | Triming of grass and weeds from the shoulder/berms and disposal the same to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge1st Year |
| 69 | 2nd Year |
| 70 | 3rd Year |
| 71 | 4thYear |
| 72 | 5th Year Please Enable Macros to View BoQ information |