| 1 | CIVIL WORKEarth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lift. complete as directed by the E.I.C.(As Per AR Page No.-1, Item No.-1) |
| 2 | Supplying & filling of foundation with course sand well watered and rammed including cost, cost of all labour, carriage, royalty complete in all respect. (As Per A/R Page No-1, Item No-2) |
| 3 | Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C. |
| 4 | Brick work with fly ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in Foundation and Plinth including watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. |
| 5 | Brick work with Flyash Bricks 23cm x 11cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in Super Structure including watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, etc complete as per the direction of E.I.C. G floor |
| 6 | First Floor |
| 7 | Second Floor |
| 8 | R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, centering shuttering etc complete but excluding cost of reinforcement. i) Column base Footing |
| 9 | PLINTH BAND |
| 10 | COLUMN SUPER STRUCTURE |
| 11 | First Floor |
| 12 | Second Floor |
| 13 | LINTEL BAND |
| 14 | First Floor |
| 15 | CHAJJA |
| 16 | First Floor |
| 17 | Second Floor |
| 18 | ROOF BEAM |
| 19 | First Floor |
| 20 | Second Floor |
| 21 | STAIRCASE |
| 22 | First Floor |
| 23 | ROOF SLAB |
| 24 | First Floor |
| 25 | Second Floor |
| 26 | Straightening, cutting, bending bent up or coiled rods, including cranking, hooking, welding or jointing the M.S. rods or tor confirming to I.S. 432 (Plain) and 1785 (Tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for R.C.C. works including cost, conveyance and taxes of M.S. rods or tor steel and binding wires of 18 to 20 gauge and cost of all labour etc.complete in all respect. |
| 27 | First Floor |
| 28 | Second Floor |
| 29 | 12mm thick C.P.(1:6) on brick masonary to the smooth surface including watering, curing, cost, carriage, royalty of all materials, cost of all labour, etc complete as per the direction of E.I.C. |
| 30 | First Floor |
| 31 | Second Floor |
| 32 | 16mm thick C.P. (1:6) over brick masonary to the smooth surface including watering, curing cost, carriage, royalty, and taxes of all materials, cost of all labour, etc complete as per the direction of E.I.C. |
| 33 | First Floor |
| 34 | Second Floor |
| 35 | 6 mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chiping and slury treatment. in Ground Floor |
| 36 | First Floor |
| 37 | Second Floor |
| 38 | Supplying, fitting and fixing vitrified tile (Plain) in floors of size 600mm x 600mm of approved make conformaing to IS : 13755 laid on 20 mm thick cement mortar (1:4) (1 cement :4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of E.I.C. (For New work only) |
| 39 | First Floor |
| 40 | Fixing Vitrified tiles (size 600mmx600mm) (Plain) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including cost, carriage, cost of all labour complete. |
| 41 | Fixing Vitrified Industrial tiles in floors treads or steps and on 20mm thick bed of cement mortar 1:4 (1cement : 4 sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including cost, carriage, royalty & taxes of all materials, cost of all labours T&P complete. |
| 42 | First Floor |
| 43 | Fixing Vitrified industrial tiles ) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including cost, carriage, cost of all labour complete. |
| 44 | First Floor |
| 45 | Supplying of M.S. Door, Window with grills, Grills, collapsible gates made out of M.S. Angle frame, M.S. Flat, Sheet etc of approved section & design, electrically welded properly with all necessary locking arrengement, and 1 coat red oxide primer including cost of all materials, labour T&P, carriage of materials to site complete. |
| 46 | Supplying, fitting, fixing up window (sliding type) made up aluminum Section 9778 as windows frame, section No. 4095, 4096 and 9777, 3994 as shutter frame with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour, T&P etc. complete as per direction of Engineer-in-charge. excluding cost of glass. |
| 47 | Providing and fitting of glass pane (5 mm thick black Glass) for windows, door and ventilators including cost of all materials, labour T&P etc. complete. (Measurement to be taken as per actual) |
| 48 | Painting two coats with approved Enamel Paint on IRON work over a coat of RED OXSIDE Primer including all cost etc all complete. |
| 49 | First Floor |
| 50 | Second Floor |
| 51 | Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials labour T & P etc. as per direction of Engineer -In -charge. in Ground Floor |
| 52 | First Floor |
| 53 | Second Floor |
| 54 | Priming 1 coat with wall primer water bond cement primer including all labour, materials, T&P etc. complete. |
| 55 | First Floor |
| 56 | Second Floor |
| 57 | Distempering 2 coats to walls with distemper of approved shade on new work to give an even shade including cost of distemper and labour, T & P. etc complete. |
| 58 | First Floor |
| 59 | Second Floor |
| 60 | Finishing to the exposed surfaces of wall with weather coat of any approved shade on new work 2 coats to give an even shade including cost of weather coat all cost of all labours and T&P etc. complete . |
| 61 | First Floor |
| 62 | Second Floor |
| 63 | C.C. (1:2:4) with 12mm and down grade C.B. chips approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C. |
| 64 | Supplying, fitting and fixing of stainless steel of 304 grade in hand railing using 50 mm dia of 2 mm thick circular pipe with Balustrade of size 32 mm x 32mm x 2mm @ 0.90 mtr C/C and stainless aquare pipe bracing of size case as per approved design and specification, buffing, polishing etc. with the cost, conveyance taxses of all material, cost of all labour etc. complete in all respect. (in all floor) |
| 65 | E.I. WorkRecessed wiring to light/Fan/Exhaust fan/ Call bell point with 1.5 sq.mm FRLSH insulated single core multistrand copper conductor of ISI marked with 20 mm dia non-metalic PVC flexible conduit with 5 Amp, 250 V piano type switch ISI marked and ceiling rose ISI marked mounted on MS box having front bakelite cover of suitable size , MS box with 1.5 sq.mm FRLSH insulated single core multistrand copper conductor as earth wire including all accesories and connection as per direction of Engineer in Charge. ( Make of wire Finolex / L&T / Havels / V Guard )(a) Group-C |
| 66 | Receass wiring for circuit/submain wiring with the following mentioned size PVC FRLS insulated, copper conductor, single core cable Make- Finolex/Anchor/Polycab/HAVELLS/RR KABLE/KEI in recessed HMS FRLS PVC conduit of mentioned size Make-AKG/BEC/Precision/Norpak/Anchor/Kinjal as required as per direction of Engg.-in-Charge. 2 nos single core 1.5 sq. mm copper wire for phase and neutral and 01 no of single core 1.5 sq. mm copper wire for earth continuty conductor. In 20 mm dia non metallic heavy duty conduit (LDB to LSB/LIGHT CKT)(2X1.5+1X1.5) |
| 67 | 2 nos single core 2.5 sq. mm copper wire for phase and neutral and 01 no of single core 1.5 sq. mm copper wire for earth continuty conductor in 20 mm dia non metallic heavy duty conduit.(BDB to LSB/LIGHT CKT/5A PLUG/UPS POINT ) (2X2.5+1X1.5) |
| 68 | SITC of energy efficient LED tube light fittings with decorative alluminium batten and LED tube light having power rating not more than 20 watt and lumen output not less than 2000 lumen complete with electronic driver and all other accessories with diffuser having 2 years warranty i/c connection etc as required as per direction of Engg.-in-Charge. (Make: Panasonic/LT/Havells /Philips/Wipro /Crompton/Bajaj). The luminaire should be Replacement Warranty will be 2 years . Please Enable Macros to View BoQ information |