|
| 1 | Total Amount of BoQ 2 |
| 2 | Amount after unconditional Rebate |
| 3 | Electrical work |
| 4 | Schedule -A (Supply and Erection of RRCS of Silo No -5 & 6 (Double Track in each SILO) having single chute on each track ) |
| 5 | Schedule-B ( Comprehensive AMC of Silo No -5 & 6 (Double Track in each SILO) having single chute on each track ) |
| 6 | Schedule -C( Supply and Erection of RRCS of Silo No -3 & 4 (Single Track in each SILO) having single chute on each track ) |
| 7 | Schedule-D (Comprehensive AMC of Silo No -3 & 4 (Single Track in each SILO) having single chute on each track ) |
| 8 | Schedule -A( Supply and Erection of RRCS of Silo No -5 & 6 (Double Track in each SILO) having single chute on each track) |
| 9 | Preparation & Submission of Design and Drawings including layout plan and bill of material. |
| 10 | Supply of material for Rigid retractable Catenary System (RRCS) and Rigid Overhead Catenary System (ROCS) and other required items as per approved BoM. |
| 11 | Supply of materials covering conventional OHE including motorised isolator, Power supply arrangement, bypass arrangement with 150sq.mm cooper feeder wire as per RDSO Specs or 33kV 1cx150sq.mm UG Cu Copper cable and other required items as per approved BoM. |
| 12 | Supply of common Centralised PLC and cables with provision of interlocking and sync of existing chute in SILO system including existing S&T . |
| 13 | Installation of RRCS & ROCS with PLC Panel in all respect. |
| 14 | Installation of conventional OHE including motorized isolator in all respect. |
| 15 | Modification/dismantling/cleaning work in existing conventional type OHE at both end of silo if already executed |
| 16 | Commissioning of above system including EIG |
| 17 | Recommended spares with special tools for 3 years with special tools. |
| 18 | Schedule-B (Comprehensive AMC of Silo No -5 & 6 (Double Track in each SILO) having single chute on each track) |
| 19 | Annual Maintenance charge for 1st Year |
| 20 | Annual Maintenance charge for 2nd Year |
| 21 | Annual Maintenance charge for 3rd Year |
| 22 | Schedule -C( Supply and Erection of RRCS of Silo No -3 & 4 (Single Track in each SILO) having single chute on each track ) |
| 23 | Preparation & Submission of Design and Drawings including layout plan and bill of material. |
| 24 | Supply of material for Rigid retractable Catenary System (RRCS) and Rigid Overhead Catenary System (ROCS) and other required items as per approved BoM. |
| 25 | Supply of materials covering conventional OHE including motorised isolator, Power supply arrangement, bypass arrangement with 150sq.mm cooper feeder wire as per RDSO Specs or 33kV 1cx150sq.mm UG Cu Copper cable and other required items as per approved BoM. |
| 26 | Supply of common Centralised PLC and cables with provision of interlocking and sync of existing chute in SILO system including existing S&T . |
| 27 | Installation of RRCS & ROCS with PLC Panel in all respect. |
| 28 | Installation of conventional OHE including motorized isolator in all respect. |
| 29 | Modification/dismantling/cleaning work in existing conventional type OHE at both end of silo if already executed |
| 30 | Commissioning of above system including EIG |
| 31 | Recommended spares with special tools for 3 years with special tools. |
| 32 | Schedule-D (Comprehensive AMC of Silo No -3 & 4 (Single Track in each SILO) having single chute on each track ) |
| 33 | Annual Maintenance charge for 1st Year |
| 34 | Annual Maintenance charge for 2nd Year |
| 35 | Annual Maintenance charge for 3rd Year Please Enable Macros to View BoQ information |