| 1 | Transporting, Installation and commissioning of DSM 150/52 pump in 21L/1ED |
| 2 | Transporting of trolleys to pump site for loading of pump, motor, base plate, pipes and HT starter |
| 3 | Loading, Dismantling of Cage, lowering from pit no.3 of DSM 150/52 Horizontal Split Casing pump, 3.3kV, 295kW FLP induction motor, base plate and 3.3kV, 300kW, FLP HT starter from surface workshop to Pit bottom in RVII seam and than refitting of cage. |
| 4 | Transporting of DSM 150/52 Horizontal Split Casing pump, 3.3kV, 295kW FLP induction motor, base plate and 3.3kV, 300kW, FLP HT starter from pit bottom in RVII seam than RVII to RVIIA drift to 18L/2ED over track line |
| 5 | Transporting of DSM 150/52 Horizontal Split Casing pump, 3.3kV, 295kW FLP induction motor, base plate and 3.3kV, 300kW, FLP HT starter 18L/2ED to 21L/1ED manually on floor by crossing installed conveyor belt along 19L. |
| 6 | Installation/levelling and alignment of complete pump set including bed plate and motor on foundation with laying of power cable and joining of suction and delivery range with related supports and pipe range valves and accessories. |
| 7 | TranspoCommissioning of pump by priming, removing leakages in suction and delivery during operationrting pump to drift |
| 8 | 5 times lowering of pump set with rejoining of suction range with related accessories and extension of delivery pipe. |
| 9 | Installation of 3 Horizontal Split casing pump set with electricals in RVIIA seam at 19WD/18L |
| 10 | Loading at workshop, Unloading, Transportation of 95mm2, PVCDWA, 300m power cable manually from Incline No.1 mouth to 750m in Incline to 200m drift from RVII to RVIIA seam to GCPL substation at 17L/78WD. |
| 11 | Lifting of 2reels 95mm2, 250 PVCDWA, 1reel 70mm2, 250m PVCDWA cable to pit top, Dismantling of Cage and lowering of same to pit bottom and than refitting of cage |
| 12 | Transporting of Cable reels from pit bottom via drift from RVII to RVIIA seam upto 5D haulage |
| 13 | Unreeling and Laying of all power cables manually, i.e.95mm2 and 70mm2, 1050m long from 17L/7WD to 17L/10WD to 10L/10WD to 10L/19WD to 18L/19WD and hanging the same along the length |
| 14 | Loading and Transporting of 1 Nos. of 550V, 400A FLP breaker, 3 Nos. of 100kW FLP star delta starter from surface workshop to pit bottom and from pit bottom in RVII seam than RVII to RVIIA drift bottom over track line and than manually to 18L/19WD. |
| 15 | Loading and Transporting of 3 Nos. of Horizontal Split casing pump set (including motor, bed plate) from surface workshop to pit bottom and from pit bottom in RVII seam than RVII to RVIIA drift bottom over track line and than manually to 18L/19WD |
| 16 | Transporting, laying and jointing of 3nos. of 4\\" HDPE pipe delivery range from 18L/19WD to 10L/10WD (appx. 3x595m) |
| 17 | Cost of M.S. Nut bolt 5/8\\"x 4\\" and 5/8\\"x 2-1/2\\"for pipe range |
| 18 | CMPF amount limited to the amount as per labour payment certificate |
| 19 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |