| 1 | M&L for cleaning of STP of capacity 200 KLD equalizing tank /grit chamber/ oil grease chamber/ silting chamber of Sewage Water in the tank and removing of settle down Sewage sludge cum mud/ De-Silting etc and making good the patches on walls internally or externally in cement mortor (1:3) where required complete all as required at site and directed by the Engineer-in-Charge.Note: The cleaning should be done in every three months through machinary equipments. |
| 2 | M&L for cleaning of STP of capacity 200 KLD sludge holding tank of Sewage treatment plant and removing of settle down Sewage sludge cum mud/ De-Silting etc and making good the patches on walls internally or externally in cement mortor (1:3) where required complete all as required at site and directed by the Engineer-in-Charge. Note for item No 1 & 2:- The rate quoted by the tenderer is deemed to be included in the unit rate of the following:- (a) Pump Set of appropriate capacity with operators including necessary connections required at site including PVC heavy duty flexible hose pipe for suction and delivery purposes. (b) Lorry/Tractor mounted septic storage tank of appropriate capacity not less than 3 KL should be used for disposing off the same to the location where approved by the FMDA/MCF(c ) Necessary Oxygen Mask, Gloves, Gum Boot and all other safety aspects to be observed including necessary Phawda, Steel Bucket, Manila rope etc. required at site and all as directed by the Engineer-in-Charge. Note: The cleaning should be done in every three months through machinary equipments. |
| 3 | M&L for cleaning of STP of capacity 200 KLD of Fab-1 and Fab-2 of Sewage treatment plant and removing of settle down Sewage sludge cum mud/De-Silting etc and making good the patches on walls internally or externally in cement mortor (1:3) where required complete all as required at site and directed by the Engineer-in-Charge.Note: The cleaning should be done in every three months through machinary equipments. |
| 4 | M&L for cleaning of STP of capacity 200 KLD Tube settler of Sewage treatment plant and removing of settle down Sewage sludge cum mud/De-Silting etc and making good the patches on walls internally or externally in cement mortor (1:3) where required complete all as required at site and directed by the Engineer-in-Charge.Note: The cleaning should be done in every three months through machinary equipments. |
| 5 | M&L for cleaning of STP of capacity 200 KLD treated water tank with chemical contact tank of STP by removing of all deposited sludge, scale or other unwanted materials from the tank by any means and removing the same to out site MOD land and after cleaning, washing and scraping the wall complete all as specified and directed by Engr-in-Charge. Note for item No 3 to 5 : The rate quoted by the tenderer is deemed to be included in the unit rate of the following:- (a) Pump Set of appropriate capacity with operators including necessary connections required at site including PVC heavy duty flexible hose pipe for suction and delivery purposes. (b) Lorry/Tractor mounted septic storage tank of appropriate capacity not less than 3 KL should be used for disposing off the same to the location where approved by the FMDA/MCF(c ) Necessary Mask, Gloves, Gum Boot and all other safety aspects to be observed including necessary Phawda, Steel Bucket, Manila rope etc. required at site and all as directed by the Engineer-in-Charge.(d) Injection grouting with waterproofing chemicals in leakages surfaces as directed by Engineer-in-Charge.(e ) Exposed external surfaces shall be finished with two coats of cement base paints. (f) Internal surfaces shall be finished with two coats of epoxy paint. Note: The cleaning should be done in every three months through machinary equipments. |
| 6 | Supply & loading MBBR Bio media made of UPVC, and corrugated shape having surface area in MBBR complete all as specified and as directed by Engr-in-charge. |
| 7 | Supply & fixing Cast Iron butterfly valve 25 mm bore, stainless steel disc, gear mountable as per IS 13095 class PN 1.6 complete with nuts, bolts, washer and rubber gasket including taking out old unserviceable butterfly valve complete all as specified and as directed by Engr-in-charge make- Zoloto/ L&T/ ADVANCE/ NVR. |
| 8 | Complete all as per ser item No 7.00 here-in-before but 40 mm bore complete all as specified and as directed. |
| 9 | Complete all as per ser item No 7.00 here-in-before but 50 mm bore complete all as specified and as directed. |
| 10 | Complete all as per ser item No 7.00 here-in-before but 65 mm bore complete all as specified and as directed. |
| 11 | Complete all as per ser item No 7.00 here-in-before but 80 mm bore complete all as specified and as directed. |
| 12 | Complete all as per ser item No 7.00 here-in-before but 100 mm bore complete all as specified and as directed. |
| 13 | Supply, laying, jointing, welding & testing of mild steel pipe 100 mm bore (Heavy duty Class 'C') including necessary fittings as required laid in trenches or laying on floor for connecting to various STP accessories and to connect outgoing water main including taking down the unserviceable pipe with fittings complete all as specified and as directed by Engr-in-charge. Make-Jindal/Tata/Bharat Steel Note:- MS flange and flange joint complete with jointing material shall be deemed to be included in the unit rate of this item. |
| 14 | Complete all as per ser item No 13.00 here-in-before but 80 mm bore complete all as specified and as directed. |
| 15 | Complete all as per ser item No 13.00 here-in-before but 65 mm bore complete all as specified and as directed. |
| 16 | Supply only DWPE chemical for sewage treatment plant complete all as specified and as directed. Note:- Receipt Voucher shall be prepared and shall be submitted during payment of RAR/ Final Bill. |
| 17 | Material & Labour for replacement of Quartz silica sand 32-64 grade complete all as specified and as directed by Engr-in-charge. |
| 18 | Material & Labour for replacement of quartz silica sand 16-32 grade complete all as specified and as directed by Engr-in-charge. |
| 19 | Material & Labour l for replacement of quartz silica sand 8-16 grade complete all as specified and as directed by Engr-in-charge. |
| 20 | Material & Labour for replacement of quartz silica sand 4-8 grade complete all as specified and as directed by Engr-in-charge. |
| 21 | Material & Labour for replacement of activated carbon IV 1000 complete all as specified and as directed by Engr-in-charge. |
| 22 | Taking out complete pebbles from the filter and refilling the same pebbles after washing /cleaning thoroughly complete all as specified and directed by Engr-in-charge. |
| 23 | S&F in replacement of cast iron sluice valve, class PN-1.6, ISI mark, flanged ends drilled having stainless steel /brass spindle with cast iron wheel at top complete with nuts, bolts, washers and gaskets including taking out old unserviceable sluice valve for the 100mm bore size complete all as specified and as directed by Engr-in-charge. |
| 24 | Carrying sample for testing of treated water of STP and submission of detailed test report to the office of the Engineer-in-charge. Details are as under:- (a) carrying out minimum essential testing of water as per IS 3025 & IS 1622 mandatory for chemical, colour, odour, PH value, TSS, BOD, COD, Total residual chlorine, total Nitrogen, sulphate, oil and grease, Ammonical nitrogen (NH3-N) and Bacteriological total coliform organism per 100ml (MPN) and Ecoli in 100ml (b) Treated sewage water shall conform to the following characterstics:- (i) TSS : < 10 mg/litre (ii) BOD : < 10 mg/ litre (iii) COD: < 150 mg/litre (iv) Ph: 6.5 -8.5 (v) Total coliform: < 100 MPN/100 ml (desired nil) (vi) Resudual CI> 1 mg/litre Rest of the characterstic of the treated water shall be as per IS 3025 & IS 1622. Note:- Rate quoted shall also deemed to be included for:- (i) Cost of testing & sterilized bottle as required. (ii) To and fro Transportation charges for collection of samples. |
| 25 | Supply only Sodium Hypochlorite having 10% chlorine content complete all as specified and as directed. |
| 26 | Supply only poly Electrolyte 100% Purity complete all as specified and as directed. |
| 27 | M&L for overhauling of air compressor coupled with blower motor 10 HP capacity installed at sewage treatment plant including necessary arrangement to transporting to workshop for re-grinding of shaft, oiling, greasing etc and necessary replacement of wornout bolts, nuts, washers, silencer, belt drivers, pressure guage, air-filter, bearings, shaft, rings etc. including re-assembling the compresser with blower motor, commissioning and testing to the entire satisfaction of Engineer - in - charge . |
| 28 | Supply only compressor oil complete all as specified and as directed by Engineer - in- charge . |
| 29 | Disconnectiong existing defective electric motor of any make of capacity 3 to 5 HP from electric mains by isolating the naked connections, removing from foundation by unscrewing the nuts, bolts etc, dis-couple from pump, opening of motor for inspection in presence of Engr-in-Charge & carry out minor repairs at site re-assembling the motor after repair, refixing in position re-connecting the same as prior to removing from foundation including replacement of nuts, bolts, washers if necessiates of suitable size, testing and commissioning complete all as specified and as directed. |
| 30 | Taking out old unserviceable/burnt copper winding of motors capacity 3 to 5 HP and material and labour for rewinding of electric motor with super enameled copper winding wire of suitable gauge as per existing including cleaning of rotor slots, all winding/insulation material, varnishing etc. complete and testing at site on full load after reinstallation to the full satisfaction of Engr-in-Charge complete all as specified and as directed by Engr-In-Charge. Note:- (a) Defective motor taken out from ser item No. 30 above. (b) Replacement of minor parts shall be deemed to be included in this unit rate. (c) In case of major repairs not possible at site, the motor shall be shifted to authorised workshop and cost of shifting to workshop and back to site shall be deemed to be included in the unit rate. |
| 31 | M&L for replacement of ball bearing of the electric motor upto 5 HP 3 phase / single phase complete all as specified and as directed. Make: SKF/TATA/NBC. |
| 32 | M&L for replacement of MS Shaft of the electric motor upto 5 HP motor 440 Volts complete all as specified and as directed. |
| 33 | Disconnectiong existing defective electric motor of any make 10 to 15 HP from electric mains by isolating the naked connections, removing from foundation by unscrewing the nuts, bolts etc, dis-couple from pump, blower, centrifugal machine (manure making machine) etc opening of motor for inspection in presence of Engr-in-Charge & carry out minor repairs at site, re-assembling the motor after repair, refixing in position, re-connecting same as prior to removing from foundation including replacement of nuts, bolts washers if necessiates of suitable size, testing and commissioning complete all as specified and as directed. |
| 34 | Taking out old unserviceable/burnt copper winding of motors capacity 10 to 15HP and material and labour for rewinding of electric motor of capacity 10 to 15HP, 3 Phase with super enameled copper winding wire of suitable gauge as per existing including cleaning of rotor slots, all winding/insulation material, varnishing etc. complete and testing at site on full load after reinstallation to the full satisfaction of Engr-in-Charge complete all as specified and as directed. Note:- (a) Defective motor shall be taken out from item No. 34.00 above (b) Replacement of minor parts shall be deemed to be included in this unit rate. (c) In case of major repairs not possible at site, the motor shall be shifted to authorised workshop and cost of shifting to workshop and back to site shall be deemed to be included in the unit rate. |
| 35 | M&L for replacement of ball bearing of the electric motor 10 to 15 HP 3 phase / single phase complete all specified and as directed. Make:- SKF/TATA/NBC. |
| 36 | M&L for replacement of MS Shaft of the electric motor 10 to 15 HP 440 Volts complete all specified and as directed. |
| 37 | Taking out /lifting defective pump set of any type, (Raw sewage pumpets) of capacity upto 12.5 HP by unscrewing the foundation bolts, disconnecting from water connection, and disconnecting from electric motor, opening for inspection in presence of Eng-in-Charge and carry out minor repair at site, in case major repair/replacement of parts not possible at site, the pump shall be shifted to authorised workshop on his own cost, and re-fixing, reconnecting in position, testing and commissioning complete including replacement of nuts, bolts and washers complete all specified and as directed. Note:- Replcement of defective part shall be deemed to be included in unit rate except for rewinding. |
| 38 | Taking out old unserviceable/burnt copper winding of motors capacity upto 12.5HP and material and labour for rewinding of electric motor of capacity upto 12.5HP, 3 Phase with super enameled copper winding wire of suitable gauge as per existing including cleaning of rotor slots, all winding/insulation material, varnishing etc. complete and testing at site on full load after reinstallation to the full satisfaction of Engr-in-Charge. Note:- Defective motor shall be taken out from item No. 38.00 above. |
| 39 | Material & Labour for painting to exposed Filter media tank (ACF and DMF) at old STP installation with two coats of synthetic enamel paint by spray painting as per specified colour code after cleaning and scraping out old paint including writing/marking complete all as specified and as directed by Engineer-in-charge. |
| 40 | Disconnecting, electrically, isolating the existing unserviceable MCCB FP of any make and capacity and Supply, fixing, connecting, testing and commissioning MCCB FP 250 Amp, 440 volts fixed in existinig panel including necessary modification for new MCCB FP, 250 amp capacity breaking capacity upto 36 kA conforming to relevant IS or as per the existing specification complete all as specified and as directed by Engineer-in-charge. |
| 41 | Complete all as per ser item No 40.00 here-in-before but 125 Amps with breaking capacity 16 kA complete all as specified and as directed by Engineer-in-charge. |
| 42 | Complete all as per ser item No 40.00 here-in-before but 63 Amps with breaking capacity 16 kA complete all as specified and as directed by Engineer-in-charge. |
| 43 | S&F in replacement of MCB, DP, 6 to 32 Amps, 240V AC of, 10 kA complete all as specified and as directed by Engineer-in-charge. |
| 44 | S&F in replacement of MCB, SP, 6 to 32 Amps, 240V AC of, 10 kA complete all as specified and as directed by Engineer-in-charge. |
| 45 | Supply & fixing in replacement for power contactors 32 Amps, 415 volts AC operated 3 phase ML-2 or as per existing complete all as specified and directed. |
| 46 | Supply & fixing in replacement for power contactors 40 Amps, 415 volts AC operated 3 phase ML-3 or as per existing complete all as specified and directed. |
| 47 | Supply and fixing in replacement of BI metallic over load relay, range 28-42 amp rating for automatic starters complete all as specified and directed by Engineer-in-charge. |
| 48 | S&F in replacement of service cable PVC insulated copper conductor of size 6 sqmm 3 core 1100 Volt grade, served with inner sheathing of PVC tape and overall PVC sheathed in service connection suspended by insulating hangers not more than 1 metre apart including 4 mm suspension wire one twin core cable flat or circular complete all as specified and directed by Engineer-in-charge. |
| 49 | Material and labour for lifting, cleaning and refixing of square or rectangular air grids for aeration in sludge holding tank, Equilization tank, MBBR Tank I and II to ensure fine bubbles dispersion with PVC/SS pipes of size 50mm dia, inter connected with necessary flange complete all as required at site and directed by the Engineer-in-Charge. |
| 50 | Material & Labour for painting by spray machine to existing LT panels installed at STP installations with one coat of synthetic enamel paint of approved color on exposed surfaces including preparation of surfaces complete all as specified and directed by the Engineer-in-Charge. |
| 51 | Material & Labour for painting by spray machine to existing centrifugal motor & pumping set complete including base frame with two coats of synthetic enamel paint of approved color/existing color for 3 to 5 HP capacity complete all as specified and directed by the Engineer-in-Charge. |
| 52 | Material & Labour for painting by spary machine to existing blower and coupled induction motor of upto 15 HP capacity complete including base frame with two coats of synthetic enamel paint of approved color/existing color complete all as specified and directed by the Engineer-in-Charge. |
| 53 | M& L for painting by spray machine to exposed CI/GI/MS pipe lines with two coats of synthetic enamal paint including sluice valves, fittings and NRVs at STP/ Water STP installations as per existing/approved color code after cleaning and scrapping out old paint complete all as required at site and directed by the Engineer-in-Charge. |
| 54 | Comprehensive, preventive and periodical maintenance of 01 No. electrically operated ThyssenKrupp Elevator (INDIA) make passenger lifts of capacity 884 Kgs carrying 13 passengers in S+4, (total 5 landings) with electric power operated doors, auto electric leveling device complete with ARD facility installed at Ahuja block at 56 ASP AF Stn Faridabad to be maintained as described here-in after in reliable, safe and efficient operating condition by regularly examine lubricating and adjust the mechanical and electrical driving equipment governor, sleeve shaft assembly bearing / contacts & governor jaws, car & hall mechanical buttons, car & hall position indicators, car direction indicators and all other car and landing signal fixtures, deflectors, car and counter weight guide rails and buffers, equipment and carry out planned maintenance in a systematic and controlled manner using techniques and expertise consultancy including replacement of minor spares parts such as wire, lug, lubricant, landing wheel, nut and bolts, welding, rubber bushes, etc complete all as specified and directed by Engineer-in-Charge and as detailed below:- |
| 55 | Note :-(i) The contractor shall have to replace the unserviceable materials with OEM materials only. (ii) Contractor is responsible for renewal of Insurance of operator/Mechanic/Helper for which rate is included In the unit rate. In any accident occur of any indl like Operator/ Mechanisc/ Helper/ Users during operation time of lift, contractor is liable to pay compensation to the indl as decided by the competent authority. (iii) Load Testing for Lifts to be carried once in a year through chartered Engineer and necessary test report shall be submitted. The entire work mentioned in this Sch 'A' Item including comprehensive, preventive and periodical maintenance of lift/elevators shall be executed through OEM i.e. M/S ThyssenKrupp Elevator (INDIA) only or through the authorized service representative of the company (subject to production of valid authorization document) The contractor shall submit MOU with OEM in this regard. Please Enable Macros to View BoQ information |
| 56 | Note :-(i) The contractor shall have to replace the unserviceable materials with OEM materials only. (ii) Contractor is responsible for renewal of Insurance of operator/Mechanic/Helper for which rate is included In the unit rate. In any accident occur of any indl like Operator/ Mechanisc/ Helper/ Users during operation time of lift, contractor is liable to pay compensation to the indl as decided by the competent authority. (iii) Load Testing for Lifts to be carried once in a year through chartered Engineer and necessary test report shall be submitted. The entire work mentioned in this Sch 'A' Item including comprehensive, preventive and periodical maintenance of lift/elevators shall be executed through OEM i.e. M/S ThyssenKrupp Elevator (INDIA) only or through the authorized service representative of the company (subject to production of valid authorization document) The contractor shall submit MOU with OEM in this regard. Please Enable Macros to View BoQ information |