| 1 | Excavation in soil in hill area in all heights and depths in all kinds of soil including saturated soil comprising of pick, jumper blasting work both in soft and hard rock with chiseling / wedging out side of rock (where blasting is prohibited) and their intermediate classification of soil including dewatering where required setting out to the required line grades, side slopes trimming bottom and level as shown on drawings as directed by the Engineer-in charge at site according to technical clause 1603.1 and 1603.2 sorting useful / un-useful materials and stacking the same in all leads and lifts and transportation of the un-useful materials for filling in roads ways, embankments for grades improvements and leveling to the require grade and then disposing of surplus excavated earth in acquired width of road or on approved dumping sites through all modes of transportation including head load animal load or mechanical means along with its leveling fine dressing and all labour, machineries, materials, tools equipment's and sefety measures and incidentals necessary to complete the work by all means ( if any required) recovery for 101.72 (One Hundred One point Seventy Two only) cubic metre @ Rs. 300.00 (three Hundred) per cubic metre amount Rs 30516.00/- (Thirty Thousand Five Hundred Sixteen only) shall be done on prorata basis for the quantity of cutting in earth work effected. Any loss to the public and private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all respect. The rate are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge. |
| 2 | Earth work in excavation for structures in all depths as per drawing and technical specifications for Rural Roads January, 2014 clause 305 including setting out, construction of shoring, and bracing, removal of stumps and other deleterious materials and disposal in all leads and lifts including dressing of sides and bottom and back filling in trenches with suitable materials. All work of rock cutting by blasting shell be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. water pollution etc. and to protect stability of hill side, rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting excavation, including rock excavation shall be carried out true to lines, grades, side slopes, width, camber, super-elevation and levels as showing on the drawings or as directed by the Engineer-in-Charge including hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner, trimming filling of unevenness, blindage and finishing of the road to specified dimensions or as directed by Engineer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to stream floods seepage, rain and other causes it shall be removed by suitable diversion bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. Any loss to the public and private property during the excavation shall be the absolute responsibility of the contractor which shall have to be duly compensated by him in all cases. The rate are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge. |
| 3 | Providing concrete for plain/reinforced concrete PCC grade M-20 (M-twenty) 1:2:4 (one cement : two couse sand: four graded stone aggregate) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 The rate are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge. |
| 4 | Providing and laying reinforced cement concrete in super structure as per drawing and technical specifications clause 800,1205.4 and 1205.5 in RCC M-25 1:1.5:3 (One cement: one point five sand: three graded stone aggregate 20mm (Twenty millimetre) nominal size up to any level including cost of formwork and curing complete. The rate are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in -Charge. |
| 5 | Supplying, fitting, and placing HYSD bars Fe 415 reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 refer MORD Specificatio100. The rate are inclusive of Octroi, royality malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge. |
| 6 | Providing drainage spout as per drawing and technical specification clause 2109 The rate are inclusive of Octroi, royality malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge. |
| 7 | Providing and laying concrete for plain /reinforced concrete in open foundation complete as per drawing and technical specification clause 802,803 1202 and 1203 PCC grade M-10 nominal mix 1:3:6 (one cement: three course sand: six crushed stone aggregate). The rate are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire camage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge. |
| 8 | Providing and laying concrete for plain /reinforced concrete PCC 1:4:8 (one cement :four course sand : eight crushed stone aggregate) 40 mm (forty millimeter Nominal size) in open foundation complete as per drawing and technical specification clause 802,803 1202 and 1203.The rate are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire camage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge. |
| 9 | Providing and Laying Reinforced Cement Concrete Pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortor 1:2 (one cement : two coursed sand ) but excluding excavation, protection works, back filling, concrete and masonry work in head walls and Parapets Clause 1106. The rate are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire camage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge. |
| 10 | Providing weepholes in bricks masonry/stone masonry plain /reinforced concrete abutment wing wall,return wall with 100 mm (one hundred millimeter) dia PVC pipe extending through the full with the structure with slope of 1(V): 20(H) towards drewing face complete as per drawing and technical specification clause 614,709,1204.3.7 and as per direction of engineer in charge including carriage of materials with in all lead and lifts and other incidentals. |
| 11 | Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm (six hundred millimeter) with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8. The rate are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire camage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge. |
| 12 | Removal of land slide slips in hilly area in ordinary rock/ slips in all kind of soil including excavation of saturated soil, boulder & rocky portion requiring wherever blasting and loading in ti tipper and disposal of unserviceable materials upto a distance of 1000 mtrs. and stacking of all useful /serviceable materials and neatly dressing the surface etc. as per technical specification 302.3 and 1611 The rate are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire camage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge. |
| 13 | Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903. The rate are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire camage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge. |
| 14 | Preparation of sub grade by dressing to camber (earth work for cutting involved for sub grade to be paid for separately) depanding upon the classification of soil completed as per HPPWD specifications. The rate are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire camage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge. |
| 15 | Consolidation of sub grade with road roller including making good the undulations etc. with earth or quarry soil etc. and refilling the sub grade comlected as per HPPWD specifications. The rate are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire camage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge. |
| 16 | Stone soling properly hand-packed filling interstices with spalls and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. The rate are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire camage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge. Please Enable Macros to View BoQ information |