| 1 | Rates for SITC of Energy Efficient Centrifugal Pumpsets for Retrofitting of Pumps/Motors along with complete E&M works at Bhikiyasain Pumping Scheme |
| 2 | SITC of centrifugal pump multistage with bronze impeller discharge 400 LPM head 200 M. |
| 3 | SITC of suitable motor for above pump, 30 KW/ 40hp/ 2 Pole/ 2900 RPM, TEFC/415V/IE3. |
| 4 | Supply of Ms channel fabricated heavy duty base plate with foundation bolt suitable for mounting above pump and motor. |
| 5 | Supply of coupling set, coupling guard and rubber bush, suitable for above pump and motor. |
| 6 | SITC of control panel with one incoming and two outgoing of 30kw/40hp suitable for above pumpset |
| 7 | SITC of fully automatic pump motor starter 30kw/ 40hp. |
| 8 | SITC of Rolling contact servo voltage stabilizer 100 kva (3 phase) ISO certified, suitable for indoor use, with stand ambient temperature upto 55 deg-Celsius unit is a combination of three no. single phase air-cooled units immersed in one oil cooled tank with separate control circuit for individual correction in each phase, combination suitable for balance- unbalanced supply and load, input voltage: 280- 460 volt, output voltage; 415(+/-)1%type: rolling contact (linear type with 5 year guarantee) |
| 9 | POWER WIRING |
| 10 | Supply of copper conductor cable Three core 25 Sq.mm. including LT jointing material such as copper lugs, tape gland etc., as per requirement.(total 60 mtr.) |
| 11 | Jointing material such as lugs, tapes, as per required. |
| 12 | Complete double earthing with material such as earth plate, earth strips, coal and salt etc. required as per site. |
| 13 | MAIN PIPING AND VALVES:(A) SUCTION SIDECID/F sluice valve 100 mm with hand wheel PN 1.6MSDF Bend 100 mm dia 90 degree, 4.8 mm wall thickness.MSDF Taper 110 mm dia size of pump inlet 7.1 mm wall thickness.Supply of MS ERW pipe 110 mm dia. 10 mtr. Long 4.8 mm wall thicknessBlind Flange 150 mm Size. |
| 14 | (B) DELIVERY SIDE AND BYPASS ARRANGMENT:-80 mm delivery line with common header with 80 mm size ASA 300 sluice valve and MSDF 90 degree bend in each pumpset.CS D/F valve 80 mm with hand wheel class 300 ASA 02 Nos.CS D/F non return valve 80 mm class 300 ASA 02 Nos.MSDF Taper 80 x 65 mm dia size of pump outlet: 02 No.MS flange: Tee\\" 80x80x80 mm: 02 No.MS A/F radial: Tee\\" 80x80x80 mm: 02 No.MS Blind Flanged 80 mm 16 mm wall thickness 01 No.MSDF Distance piece 80 mm dia 1.5 mtr. Long: 01 No.MSDF Distance piece 80 mm dia 3 mtr. 01 No.Necessary MS Bolts, Nut, Washers, packing required for fixing of above (Lump Sump) |
| 15 | GAUGES: Supply of 80 mm dia pressure gauge with control cock & fittings 0-70 kg/cm2Supply of 80 mm dia with compound gauge with control cock & fittings 0-70 kg/cm2 02 No. |
| 16 | Supply of Fire Extinguisher (6Kg.) CO2 Type, Class-C |
| 17 | Supply of Rubber resistance sheet 1x2x0.015m. |
| 18 | Supply of following tools required for maintenance of pumping plants:De Spanner Set 12 pieces 1 SetRing Spanner Set 12 pieces 1 SetScrew Driver 200/250/300MM Size 3 Nos.Insulated Plier 200/250MM Size 2 No.Hammer 2 Kg. 1 No.Water Pump Plier 250 mm 1 No.Line Tester 1 No.Pipe Wrench 300/350 MM Size 2 Nos.Screw Wrench 300 mm Size 1 No.Bearing Puller 1 No.Crimpling Tool (Hydraulic Type) 1 No.Digital Tong Tester 1 No. |
| 19 | Electrification work of complete pump house (including conceal wiring, piping, switches, socket, plugs, exhaust fans, street light outside pump house LED Lights inside Pump House) |
| 20 | Cartage at site (lum sum) |
| 21 | Installation and commissioning of pumping plants and accessories inside the pump house with all civil works such as making of rcc foundations, eye bolt required nut bolt washer, champion packing complete as per requirement cable trenches cover etc. including installation & testing works complete. |
| 22 | Dismantling of all existing system one by one in such a way that when site of one set is completed then other set is dismantled by ensuring no or minimum disturbance in current water supply. |
| 23 | Supply of 3 tonne capacity chain pulley block 'p' type complete with traveling trolley with chain lift 5 meter |
| 24 | Testing of all equipments & materials at manufacturers end during manufacturing by tpi agency including all expenses. |
| 25 | Painting of entire installation Please Enable Macros to View BoQ information |