| 1 | Technical specifications of all the equipments and materials should be approved from SE (Electrical) R&B Circle prior to procurement. 33 KV UG Line using HDDSupply & Laying of 33 KV 1C x 630sqmm Aluminum XLPE Armoured cable using HDD method as per specification mentioned in the DTCN. |
| 2 | Supply & fixing of 33KV Outdoor end termination kit for 1C x 630sqmm XLPE cable as per specification mentioned in the DTCN. |
| 3 | Supply & fixing of 33KV straight through jointing kit for 1C x 630sqmm XLPE cable as per specification mentioned in the DTCN. |
| 4 | Supply & fixing of 33KV Indoor end termination/jointing kit for 1 C x 630sqmm XLPE cable as per specification mentioned in the DTCN. |
| 5 | Supply & fixing of GI Flat 50X6mm for XLPE cable earthing as per specification mentioned in the DTCN. |
| 6 | 33 KV Cable termination after RMUSupply & erection of 11 mtr RS Joist Pole 150mm x 150mm, 34.6 Kg/mtr for cable termination DP from incomming overhead feeder. The detail specification & G.T.P to be followed as per specification mentioned in the DTCN mentioned in the D.T.C.N. |
| 7 | Supply & erection of 232 sqmm AAAC for 33 KV line for tapping on incomming feeder |
| 8 | Supply & fixing of MS Channel 100x50x6mm |
| 9 | Supply & fixing of MS Channel 75x40x6mm |
| 10 | Supply & fixing of MS Angle 50x50x6mm |
| 11 | Supply & fixing of Fish Plate 50x6mm |
| 12 | Supply & fixing of GI Flat 50x6mm |
| 13 | Supply & fixing of GI Flat 50x6mm for earthing |
| 14 | Supply & fixing of 33 KV Lightning Arrestor |
| 15 | Supply & fixing of 33KV Disc Insulator (B & S), Polymer |
| 16 | Supply & fixing of 33KV H/W Fitting (B & S type) for Disc Insulator |
| 17 | Supply & fixing of 33KV Pin Insulator |
| 18 | Supply & fixing of PG Clamp for 232Sqmm AAAC |
| 19 | Supply & fixing of HT Stay set complete |
| 20 | Supply & fixing of HT Stay Insulator |
| 21 | Supply & fixing of HT Stay Clamp |
| 22 | Supply & fixing of 7/10 SWG GI wire for stay |
| 23 | Supply & fixing of 40mm nominal bore GI Pipe earthing device |
| 24 | Supply & fixing of Pipe HDPE(25 mm) |
| 25 | Supply & fixing of GI Nuts Bolt & Washer |
| 26 | Supply & fixing of GI Barbed wire for anticlimbing |
| 27 | Supply & fixing of Danger Plate |
| 28 | Supply of MS materials for fabrication & galvanisation |
| 29 | 33KV 4 Pole with 2 Nos Isolators- 1 NosSupply & erection of 11 mtr RS Joist Pole 150mm x 150mm, 34.6 Kg/mtr for cable termination DP from incomming overhead feeder. The detail specification & G.T.P to be followed as per specification mentioned in the DTCN mentioned in the D.T.C.N. |
| 30 | Supply & erection of 33 KV 800 AMP Double break (Turn & twist center rotating) isolator without earth switch with PI(Polymer) to be fixed on 4 pole structure at one of the incoming feeder. The detail specification & G.T.P to be followed as per specification mentioned in the DTCN mentioned in the D.T.C.N. |
| 31 | Supply & erection of 232 sqmm AAAC for 33 KV line for tapping on incoming feeder |
| 32 | Top Channel 100x50x6mm |
| 33 | Belting Channel 75x40x6mm |
| 34 | Bracing Angle 50x50x6mm |
| 35 | Fish Plate 50x6mm |
| 36 | GI Flat 50x6mm |
| 37 | GI Flat 50x6mm for EARTHING |
| 38 | 33 KV Disc Insulator (B & S), Polymer |
| 39 | 33 KV H/W Fitting (B & S type) for Disc Insulator |
| 40 | PG Clamp for 232 Sqmm AAAC |
| 41 | 33 KV Pin Insulator, Polymer |
| 42 | HT Stay set complete |
| 43 | HT Stay Insulator |
| 44 | HT Stay Clamp |
| 45 | 7/10 SWG GI wire for stay |
| 46 | 40mm nominal bore GI Pipe earthing device |
| 47 | Aluminium Socket 120 mm |
| 48 | G.I. Nuts, bolt & Washer |
| 49 | GI Barbered wire for anticlimbing |
| 50 | Danger Plate |
| 51 | Fabrication & Galvanisation |
| 52 | 33KV RMU with XLPE CABLEDesign, Manufacturing, Supply, Installation,Testing and commisioning of Outdoor type (IP55) 33KV HT 4 way Ring main unit (RMU) with Full DAS as per the CEA/CEIG/EB DEPARTMENT requirements comprising of the following: 2 Nos. 33KV, 630A,21kA for 3 sec Motorized Vacuum Circuit Breaker, Horizontal Fixed, Horizontally Isolated with all standard accessories with self-powered overcurrent, earthfault and numerical feeder protection relay and fault passage indicator, power supply of 24 V DC from battery charger and 230 V AC from Auxillary PT will be in the scope of supplier.2 Nos. 33KV, 630A,21kA for 3 sec Motorized Load Break Isolator, Horizontal Fixed, Horizontally Isolated with all standard accessories.Complete with protection CT and PT, Indication Lamps, Aluminium Busbars, Earthing, etc., The panel shall be erected using necessary accessories all complete as required by local electrical department and properly grouted to the plinth with all accesories required for grouting.Make-Siemens,Schneider,ABB |
| 53 | Supply of Standard FRTU with networking Equipment and other accessories for 4 way RMU. |
| 54 | 40mm nominal bore GI Pipe earthing device |
| 55 | 33/0.4 KV DTRS.I.T.C of 1250 KVA, 33/0.4 KV distribution transformer confirming to IS 1180 Level-2, ONAN, DYN11, Copper wound with On-load tap changer, LT extension box, provision of RTCC panel, OTI, WTI as per direction of Engineer in-charge. Transformer shall be provided with 4 uni-directional roller with locking arrangement suitable for movement of transformer in either direction. The detail specification & G.T.P to be followed as per specification mentioned in the DTCN mentioned in the D.T.C.N.Make- Kirloskar/OTPL/Alpha/OEU/CG |
| 56 | Supply and laying of 12 corex1.5 sqmm copper armoured control cable as per the direction of Engineer-incharge.Make-Polycab/KEI/Finolex/RR Kabel/Gloster/Havells |
| 57 | Supply & erection of mtr 6 RS Joist Pole (13 Kg/mtr) as per for mounting of outdoor VCB and accesories as per direction of engineer in-charge. |
| 58 | Supply & stringing of 100sqmm AAA Conductor as per direction of engineer in-charge. |
| 59 | Supply & fixing of MS Channel 100x50x6mm |
| 60 | Supply & fixing of MS Channel 75x40x6mm |
| 61 | Supply & fixing of 33 KV Lightning Arrestor |
| 62 | Supply & fixing of Fish Plate 50x6mm |
| 63 | Supply & laying of GI Flat 50x6mm |
| 64 | Supply & laying of GI Flat 50x6mm for EARTHING |
| 65 | Supply & fixing of PG Clamp for 100 Sqmm AAAC |
| 66 | Supply & fixing of 33 KV Pin Insulator, Polymer |
| 67 | Supply & laying of GI pipe riser (110 mm) (4nos x 6Mtr) |
| 68 | Supply & fixing of 40mm nominal bore GI Pipe earthing device for earth connection |
| 69 | Supply & fixing of Aluminium Socket 120 mm |
| 70 | Supply & fixing of G.I. Nuts, bolt & Washer |
| 71 | Supply & fixing of GI Barbered wire for anticlimbing |
| 72 | Supply & fixing of Danger Plate |
| 73 | Supply of MS materials for fabrication & galvanisation |
| 74 | LT ACB & LT XLPE CableS.I.T.C of OUTDOOR LT A.C.B (2000 Amp) panel with 4P 2000A EDO TYPE ACB Micro Processer Based with Breaking capacity - Icu= Ics= Icw= 50kA for 1 sec having LSING Protection with Display-Current Metering with Last Trip Record Data. (Communication with On & Off Status indication for Remote Closing and Opening operation of breakers through Modbus RS485 protocol and uploading breaker status to Users Computer/SCADA.), Busbar provision for 2000 A for connection of 630 sqmm 4 run cable in the incomer, 7 nos. 300 sqmm 3.5 core cable in the outgoing busbar (Make- Schneider(NW)/ ABB (E max 2 )/ Siemens (3WT)/ Legrand(DMX3), confirming to IS/IEC 60947-part1 & part2. The detail specification & G.T.P to be followed as per specification mentioned in the DTCN mentioned in the D.T.C.N. |
| 75 | LT ACB & LT XLPE CableS.I.T.C of OUTDOOR LT A.C.B (2000 Amp) panel with 4P 2000A EDO TYPE ACB Micro Processer Based with Breaking capacity - Icu= Ics= Icw= 50kA for 1 sec having LSING Protection with Display-Current Metering with Last Trip Record Data. (Communication with On & Off Status indication for Remote Closing and Opening operation of breakers through Modbus RS485 protocol and uploading breaker status to Users Computer/SCADA.), Busbar provision for 2000 A for connection of 630 sqmm 4 run cable in the incomer, 7 nos. 300 sqmm 3.5 core cable in the outgoing busbar and 1 no. 400A, 4P, 36kA with adjustable Micro processor Release with Ics=100% Icu. ( Make of MCCB- Legrand-DPX3 / Siemens-3VA Model/ Schneider- CVS/ ABB Formula) (Make of ACB- Schneider(NW)/ ABB (E max 2 )/ Siemens (3WT)/ Legrand(DMX3), confirming to IS/IEC 60947-part1 & part2. The detail specification & G.T.P to be followed as per specification mentioned in the DTCN mentioned in the D.T.C.N. |
| 76 | Supply & laying of LT 1.1KV aluminum armoured XLPE Cable, 1Cx630sqmm from transformer to LT A.C.B |
| 77 | Supply & fixing of Gland for arm 1C x 630sqmm XLPE Cable |
| 78 | Supply & termination of Al Cable Socket for 630sqmm XLPE cable |
| 79 | Supply & laying of GI Flat 50x6mm for earthing |
| 80 | Supply & fixing of 40mm nominal bore GI Pipe earthing device for earth connection |
| 81 | Supply & fixing of G.I. Nuts, bolt & Washer |
| 82 | Route marker:Supply and installation of cable route marker includingtransportation from site/tent, excavation, refilling,disposing of malba, flooding with water,ramming/compacting of foundation as per TPNODLspecification (Civil works for 33 Kv UG Cabling works) |
| 83 | Cupping of pole (Including supply of materials) (Civil works for 33 Kv DP for cable termination) |
| 84 | Concrete materials for stay anchor plate. (Including supply of materials) (Civil works for 33 Kv DP for cable termination) |
| 85 | Earthing Pit for GI Pipe Earthing (Including supply of materials) (Civil works for 33 Kv DP for cable termination) |
| 86 | Concrete materials for stay anchor plate. (Including supply of materials) (Civil works for 33 Kv DP with two nos. isolator) |
| 87 | Cupping of pole (Including supply of materials) (Civil works for 33 Kv DP with two nos. isolator) |
| 88 | Earthing Pit for Pipe earthing (Civil works for 33 Kv DP with two nos. isolator) |
| 89 | Cubical Control Room including Blower, Exahust fan,Cubicle foundation etc (Civil works for 33 Kv Cubicle indoor) |
| 90 | Earthing Pit for Pipe earthing (Civil works for 33 Kv Cubicle indoor) |
| 91 | Earthing pit for Pipe Earthing(Civil works for 33 Kv RMU) |
| 92 | Earthing Pit for Pipe earthing (Civil works for LT ACB) |
| 93 | Cupping of pole (Including supply of materials) (Civil works for 33 Kv Line shifting) |
| 94 | Concrete materials for stay anchor plate. (Civil works for 33 Kv Line shifting) |
| 95 | Earthing Pit for Pipe earthing (Civil works for Distribution Transformer) |
| 96 | Inspection fee for 33KV line for 1st KM UG |
| 97 | Inspection fee for drawing approval(G) |
| 98 | Inspection fee for Transformer (H) |
| 99 | SITC of out door 800A VCB, 21.6 Ka, 33kV with indoor CR Panel for Transformer protection .The cost is inclusive of civil foundation.Make-Siemens/Schneider/ABB Please Enable Macros to View BoQ information |