| 1 | Unit - SqmClearing and grubbing road land including uprooting trees rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P etc complete and as per direction of Engineer-in-Charge. |
| 2 | Unit - CumDismantling of Cement Concrete Grade M-15 & M-20 including T&P and scaffolding wherever necessary, sorting the dismantling materials, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead upto 1000 mtr. as per Clause No.202 of MoRT&H specifications for Road and Bridge works (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. |
| 3 | Unit - CumEarth work in excavation in all kinds of soil for road works with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and technical specification, including setting out, dressing of section to correct line, level, grade & camber for road work or dressing of sides and bottom for foundation of structures and loading into tippers, transporting to embankment site within all lifts and lead upto 1000mtr. and utilising the surplus earth locally for road work wherever required, backfilling the excavation earth to the extent required etc complete in all respect as per clause 301 & 304 of Specification for road & bridge work of MORT&H (5th Revision) & Direction of Engineer in charge. |
| 4 | Unit - CumLoosening to a depth of 150mm, leveling and compacting original ground supporting embankment /sub-grade as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305, 305.3.4 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost of all labour, T&P etc complete and as per direction of Engineer-in-Charge. |
| 5 | Unit - CumProviding and laying Granular Sub-base with Grading-VI stone screening materials as per Table 400-1 as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 401 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 6 | Unit - CumProviding Wet Mix Macadam using crushed stone aggregates as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 406 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 7 | Unit - SqmProviding and applying primer coat with slow setting bitumen emulsion on prepared surface of granular base, including clearing road surface and spraying primer using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 502 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P etc complete and as per direction of Engineer-in-Charge. |
| 8 | Unit - SqmProviding and applying tack coat with rapid setting bitumen emulsion on the prepared bituminous/ granular surface including cleaning with mechanical broom and spraying bitumen emulsion using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 503 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P etc complete and as per direction of Engineer-in-Charge. |
| 9 | Unit - CumProviding and laying dense graded bituminous macadam using crushed stone of Grade-II aggregate with batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 Grade by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete in all respects as per clause No. 505 & Section 900 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) &including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. . |
| 10 | Unit - CumProviding and laying bituminous concrete using crushed stone of Grade-II aggregate with batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder of VG-30 grade of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete in all respects as per Clause No.507 & Section 900 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) &including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. |
| 11 | Unit - CumConstruction of embankment with approved materials deposited at site from road-way cutting and other structures with all lifts and leads graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 12 | Unit - CumConstruction of embankment with approved materials obtained from borrow pits by mechanical means graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 13 | Supplying and fixing of 80mm thick cement concrete interlocking hydraulic pressed paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC SP - 63:2018. and as per direction of Engineer-in-Charge. |
| 14 | Unit - CumProviding and laying Plain cement concrete of grade M-15 in foundation of CD works etc using 40mm to 10mm size crushed stone aggregates etc complete as per drawing and technical specification using High Strength approved quality Cement and coarse granite aggregate conforming to Table 1000-1 including formwork as per Section 900,1000,1500,1700, 2100, 2200 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. |
| 15 | Unit - CumProviding and laying Plain cement concrete of grade M-15 in sub-structure of CD works etc using 40mm to 10mm size crushed stone aggregates etc complete as per drawing and technical specification using High Strength approved quality Cement and coarse granite aggregate conforming to Table 1000-1 including formwork as per Section 900,1000,1500,1700, 2100, 2200 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. |
| 16 | Unit - SqmProviding road marking with hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads@250gms per sqm area , thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35.The finished surface to be level, uniform and free from streaks and holes etc. for finished item of work as per approved drawing and technical specification complete in all respect as per Section 900 and Clause 803.4 of MoRT&H specification for road and bridge work (5th Revision) & including cost & conveyance of all materials, labour, T&P etc complete and as per direction of Engineer-in-Charge. |
| 17 | Unit - Each.Providing and fixing of retro-reflectorised informatory sign of 80cmx60cm rectangular size as per IRC:67 made of Class-B Type-IV recto reflective sheeting fixed over 2mm thick alumunium sheeting , 3mm/4mm thick alumunium composite material sheet depending on the size of sign vide Clause No. 801.3 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) fixed over back support frame of min 25x25x3 mm angle mounted on a mild steel cicular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properly designed foundation with M-25 grade cement concrete 45cmx45cm x 60 cm, 60cm below ground level as per approved drawing including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. The sign shall be maintained as per Section 12 of IRC-67. |
| 18 | Unit - Each.Providing and fixing of retro-reflectorised cautionary sign of 90cm equilateral triangle size as per IRC:67 made of Class-B Type-IV recto reflective sheeting fixed over 2mm thick alumunium sheeting , 3mm/4mm thick alumunium composite material sheet depending on the size of sign vide Clause No. 801.3 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) fixed over back support frame of min 25x25x3 mm angle mounted on a mild steel cicular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properly designed foundation with M-25 grade cement concrete 45cmx45cm x 60 cm, 60cm below ground level as per approved drawing including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. The sign shall be maintained as per Section 12 of IRC-67. |
| 19 | Unit - Each.Providing and fixing of retro-reflectorised mandatory sign of 60cm circular (speed limit) size as per IRC:67 made of Class-B Type-IV recto reflective sheeting fixed over 2mm thick alumunium sheeting , 3mm/4mm thick alumunium composite material sheet depending on the size of sign vide Clause No. 801.3 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) fixed over back support frame of min 25x25x3 mm angle mounted on a mild steel cicular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properly designed foundation with M-25 grade cement concrete 45cmx45cm x 60 cm, 60cm below ground level as per approved drawing including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. The sign shall be maintained as per Section 12 of IRC-67. |
| 20 | Unit - EachProviding and fixing of (Delineator) Roadway Indicator, form of guide posts made of mild steel with pure polyester poweder coating with the minimum thickness of powder coating of not less than 40 micron, the height of the pole shall be 800 to 900mm above the ground with about 200 to 300mm base, conforming to IRC:79 specification for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost of all materials, labour, T&P etc complete in all respect and as per direction of the Engineer-in-charge. |
| 21 | Unit - Each.Providing & fixing (Delineator) Hazard Marker conforming to IRC:79 etc complete in all respect and as per direction of the Engineer-in-charge. |
| 22 | Unit - Each.Providing & fixing (Delineator) Object Marker conforming to IRC:79 etc complete in all respect and as per direction of the Engineer-in-charge. |
| 23 | Unit - Each.Providing and fixing of retro-reflectorised mandatory sign of 90cm octagon size as per IRC:67 made of Class-B Type-IV recto reflective sheeting fixed over 2mm thick alumunium sheeting , 3mm/4mm thick alumunium composite material sheet depending on the size of sign vide Clause No. 801.3 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) fixed over back support frame of min 25x25x3 mm angle mounted on a mild steel cicular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properly designed foundation with M-25 grade cement concrete 45cmx45cm x 60 cm, 60cm below ground level as per approved drawing including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. The sign shall be maintained as per Section 12 of IRC-67. |
| 24 | Unit - SqmProviding and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting fixed over alumunium sheeting 2mm thick or alumunium composite material sheet with overall thickness of 4mm vide Clause No. 801.3 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) with area not exceeding 0.9 Sqm fixed over back support frame of minimum 40x40x5 mm angle mounted on two nos of mild steel circular pipe 65NB, 3.2 mm thickness & 4.50mtr total height firmly fixed on ground by means of properly designed foundation with M-25 grade cement concrete 45x45x60cm, 60cm below ground level as per approved drawing including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. (1200x700mm size board) |
| 25 | Unit - SqmProviding and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting fixed over alumunium sheeting 2mm thick or alumunium composite material sheet with overall thickness of 4mm vide Clause No. 801.3 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) with area exceeding 0.9 Sqm fixed over back support frame of minimum 40x40x5 mm angle mounted on two nos of mild steel circular pipe 65NB, 3.2 mm thickness & 4.50mtr total height firmly fixed on ground by means of properly designed foundation with M-25 grade cement concrete 45x45x60cm, 60cm below ground level as per approved drawing including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. (1800x1200mm size board) |
| 26 | Unit - Each.Providing and fixing of retro-reflectorised mandatory sign of 45x60cm size Route marker sign as per IRC:67 made of Class-B Type-IV recto reflective sheeting fixed over 2mm thick alumunium sheeting , 3mm/4mm thick alumunium composite material sheet depending on the size of sign vide Clause No. 801.3 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) fixed over back support frame of min 25x25x3 mm angle mounted on a mild steel cicular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properly designed foundation with M-25 grade cement concrete 45cmx45cm x 60 cm, 60cm below ground level as per approved drawing including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. The sign shall be maintained as per Section 12 of IRC-67. |
| 27 | Unit - EachProviding and fixing of bi-directional retro reflective raised pavement markers of approved colour, quality & make conforming to ASTM D-4280 made from injection moulded high impact polymer including cleaning, preparation of surface and fixing at position with approved quality adhesives as per Section 900 & Clause 804 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost of all materials, labour, T&P etc complete in all respect and as per direction of the Engineer-in-charge. |
| 28 | Unit - CumProviding, filling clean sand of approved quality in road work for construction of drainage layer and foundation trenches of structures in uniform layers, watered and rammed/ compacted as per approved drawing and technical specifications complete in all respect as per Section 900, 2100 and Clause 401 & 304 of MoRT&H specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 29 | Unit - CumProviding and laying Plain cement concrete of grade M-15 in foundation bed as levelling course of CD works etc using 40mm to 10mm size crushed stone aggregates etc complete as per drawing and technical specification using High Strength approved quality Cement and coarse granite aggregate conforming to Table 1000-1 including formwork as per Section 900,1000,1500,1700, 2100 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. |
| 30 | Unit - CumProviding and laying R.C.C M-20 grade in base of drain works as per approved drawing and technical specifications complete in all respect including formwork as per section 900, 1000, 1500, 1700, 2100 of MoRT&H specifications for Road & Bride works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 31 | Unit - CumProviding and laying R.C.C M-20 grade in walls of drain works as per approved drawing and technical specifications complete in all respect including formwork as per section 900, 1000, 1500, 1700, 2200 of MoRT&H specifications for Road & Bride works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 32 | Unit - CumProviding and laying R.C.C M-20 grade in covers of drain works as per approved drawing and technical specifications complete in all respect including formwork as per section 900, 1000, 1500, 1700, 2100, 2200 & 2300 of MoRT&H specifications for Road & Bride works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 33 | Unit - CumProviding and laying R.C.C M-20 grade in retaining wall as per approved drawing and technical specifications complete in all respect including formwork as per section 900, 1000, 1500, 1700, 2200 of MoRT&H specifications for Road & Bride works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 34 | Unit - MTSupplying, cutting, bending, binding, straightening, placing HYSD bars confirming to grade IS:1786-(Fe-500) for steel reinforcement works for finished item of work as per approved drawing and technical specifications complete in all respect as per section 900,1000, 1600, 2100, 2200 & 2300 of MoRT&H specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P etc complete and as per direction of Engineer-in-Charge. |
| 35 | Unit - Rmt.Providing weep holes in abutment, wing wall, retaining wall, toe wall and RCC drain etc with 100mm dia A.C. pipe as per approved drawing and technical specifications complete in all respect as per Section 900, 2200 & Clause 2706 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 36 | Unit - CumProviding and laying of filter media/metal spall backing using 45 mm size crushed hard granite stone aggregates to the required thickness with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall and return wall of CD works to the full height compacted to a firm condition as per drawing and technical specifications complete in all respect satisfying the requirements laid down in Clause 2504.2.2 and Section 900 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 37 | Unit - CumFilling Foundation & Plinth with excavated materials etc including OH & T&P etc 2/3 rate of earthwork in excavation of Foundation etc.(5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |