|
| 1 | Items Description |
| 2 | Reparing of 3.3kV, 100-Amps, GEC make FLP ACB Switch, S.No. BEJ/PnM/43 and 3.3kV, 100-Amps, A/Yule make FLP ACB switch , S.No.BEJ/PnM/27 of Bejdih Colliery under Sodepur Area. |
| 3 | Cost of 3.3KV, epoxy moulded insulator. |
| 4 | Cost of Busbar copper connecting Patti. |
| 5 | Cost of socket insulator epoxy moulded. |
| 6 | Cost of Isolator's Fixed & knife contacts & glass fibre arm. |
| 7 | Cast of Fixed contacts assly complete set |
| 8 | Cost of Moving contacts assly complete set |
| 9 | Cost of PT epoxy moulded sealed type 3.3KV/110V |
| 10 | Cost of PT protection HRC fuse 3.3KV/1A |
| 11 | Cost of Earth lekage relay complete with CBT. |
| 12 | Overload to be repaired by proving plunger. |
| 13 | HT copper flexible cable with socket. |
| 14 | Cost of Glass moulded phase barrier. |
| 15 | Cost of Glass insulated arm & bottom tray. |
| 16 | Cost of incoming & Out going bus section epoxy moulded insulators terminals. |
| 17 | Painting of circuit breaker, body bolt & nuts |
| 18 | Labour charges for Pillar & Breaker |
| 19 | Overhead cost and others |
| 20 | Transportation charges both sides |
| 21 | Add. CMPF/EPF @ 12% on Labour charges |
| 22 | Add. Bonus @ 8.33% on Labour charges 8.33% |
| 23 | Add. Pension @ 7% on Labour charges |
| 24 | Cost of 3.3KV, epoxy moulded Insulator. |
| 25 | Cost of Busbar copper connecting Patti. |
| 26 | Cost of socket insulator epoxy moulded. |
| 27 | Cost of Isolator's Fixed & knife contacts & glass fibre arm. |
| 28 | Cost of Fixed contacts assly complete set |
| 29 | Cost of Moving contacts assly complete set |
| 30 | Cost of PT epoxy moulded sealed type 3.3KV/110V |
| 31 | Cost of PT protection HRC fuse 3.3KV/1A |
| 32 | Cost of Earth lekage relay complete with CBT. |
| 33 | Cost of Arc chutt complete set |
| 34 | Overload to be repaired by proving plunger. |
| 35 | HT copper flexible cable with socket |
| 36 | Cost of Glass moulded phase barrier. |
| 37 | Cost of Glass insulated arm & bottom tray. |
| 38 | Cost of incoming & Out going bus section epoxy moulded insulators terminals. |
| 39 | Painting of circuit breaker, body bolt & nuts |
| 40 | Labour charges for Pillar & Breaker |
| 41 | Overhead cost & others. |
| 42 | Transportation charges both sides. |
| 43 | Add. CMPF/EPF @ 12% on Labour charges |
| 44 | Add. Bonus @ 8.33% on Labour charges 8.33% |
| 45 | Add. Pension @ 7% on Labour charges |
| 46 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |