| 1 | Items Description |
| 2 | 1. Reparing of 200HP, 550V, Reverse and Forward A/Yule make (Remote/Local) operated push button type FLP starter S.No.MITH/PnM/45 of Mithani Colliery under Sodepur Area. |
| 3 | Supply of Isolator complete set. 1-No. |
| 4 | Supply of copper Busbar |
| 5 | Supply of Bush insulator terminals |
| 6 | Supply of Incoming,outgoing and through going PVC copper flexible 70 sq. mm lead with both side copper ring socketing. |
| 7 | Supply of Thermal overload with base fitting. |
| 8 | Supply of Earth lekage relay. (having range 500mA to 2A) - One No. |
| 9 | Supply of matching CBCT. - One No. |
| 10 | Supply of C.T. 200/5A |
| 11 | Supply of ML-12 (L&T) Contactor unit, 525V. |
| 12 | Supply of Ampere meter with CT 100/5A - One set. |
| 13 | Aux. P.T. to be rewinding for circuit operation 550V/110V/12V. |
| 14 | Supply of push switch(For, Rev, Stop, ELR Test, ELR Reset) |
| 15 | Supply of Bakelite connector 12-way |
| 16 | Supply of Indicator complete set with holder. 1-No. |
| 17 | Supply of 4-mm PVC flexible cu. wire for internal circuit wiring. |
| 18 | Painting and missing bolt & nuts. |
| 19 | Labour charges. |
| 20 | Overhead & profit @10% |
| 21 | Transportation charges |
| 22 | Add. CMPF/EPF @ 12% on Labour charges |
| 23 | Add. Bonus @ 8.33% on Labour charges 8.33% |
| 24 | Add. Pension @ 7% on Labour charges |
| 25 | 2. Complete repairing of 400-Amps, 550V, Killburn make FLP ACB switch of 315kVA, 3.3kV/550V Tran Switch installed at 2L/3D East of Mithani Colliery under Sodepur Area. |
| 26 | Cost of Fixed contacts complete set. |
| 27 | Cost of Moving Contacts complete sets. |
| 28 | Providing of new Isolator. |
| 29 | Materials require for repairing & insulating of isolator jumper. |
| 30 | Cost of E/L relay with mechanism. |
| 31 | Cost of Ampere meter. |
| 32 | Cost of C.B.C.T. |
| 33 | Cost of materials require for reconditioning of O/L system |
| 34 | Cost of materials require for rewinding of C.T. |
| 35 | Cost of P.T. (Big size). |
| 36 | Cost of incoming & outgoing copper terminal studs with Insulator including nut bolt lock washer etc. |
| 37 | Cost of Arc chute. |
| 38 | Cost of 120Sq mm PVC flexible copper lead.- 2.5 Mtrs. |
| 39 | Cost of NS type fuse base with cartridge complete set. |
| 40 | Cost of Insulating materials as Adhesive, non adhesive, Ampere tape etc. |
| 41 | Materials require for cleaning, de-carburizing, painting of out-side, inside chamber and hardware materials. |
| 42 | Cost of wiring materials including type for internal wiring. |
| 43 | Cost of Tripping bar. |
| 44 | Providing of No volt coils with plunger. |
| 45 | Providing of copper socket. |
| 46 | Cost of Testing & Painting Etc. |
| 47 | Providing of overload assembly. |
| 48 | Leakage test/reset push switch with spring. |
| 49 | Providing of connection cable. |
| 50 | Charges for repairing & assembling. (Labour Charges) |
| 51 | Overhead cost and others |
| 52 | Transporting Charges (To & Fro) including loading & unloading. |
| 53 | Add. CMPF/EPF @ 12% on Labour charges |
| 54 | Add. Bonus @ 8.33% on Labour charges 8.33% |
| 55 | Add. Pension @ 7% on Labour charges |
| 56 | 3. Repairing of 100HP, 550V, Prabhu make Push button type DOL starter of Domestic water supply pump S.No.MITH/PnM/23 of Mithani Colliery under Sodepur Area |
| 57 | Isolator to be Provided repaired new 200A |
| 58 | Supply of Bush insulators. |
| 59 | Supply of copper terminal, brass nut & brass washer |
| 60 | Supply of Overload complete aet with dashpot & plunger. |
| 61 | Supply of Electronic Earth lekage relay 750mA to 2 Amps complete set. |
| 62 | Supply of CT 300/5A 4-Nos. |
| 63 | Supply of ML-12, 550V, L&T make magnetic contactor unit. |
| 64 | Supply of Push switch (START/STOP/TEST & RESET) |
| 65 | Supply of main cable line to make connection by 70 mm sq. Copper flexible cable with socketing. |
| 66 | Supply of Bakelite connector 12-way |
| 67 | Supply of Indication. |
| 68 | Supply of 4mm Pvc copper flexible wire for internal circuit wiring . |
| 69 | Supply of Body bolt, connection bolt & nuts, and painting of Starter. |
| 70 | Labour charges for assembling and testing of starter. |
| 71 | Overhead & Profit @10% |
| 72 | Transportation |
| 73 | Add. CMPF/EPF @ 12% on Labour charges |
| 74 | Add. Bonus @ 8.33% on Labour charges 8.33% |
| 75 | Add. Pension @ 7% on Labour charges |
| 76 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |