| 1 | Restoration & strengthening of bank and daowla in all type of soil mixed with chharry, karail, black cotton soil including all lead & lift with manual compaction dressing and T&P etc. required for proper completion of the work. |
| 2 | Dismantling of old brick work ,stone work in lime or concrete mortar including stacking of materials as per direction of Enginner -in- charge |
| 3 | Dismantling of R.c.c slab or othr rich Concrete including proper disposal as per direction of engg -in- charge |
| 4 | Earth work in excavaion of foundation in ordinary soil/sandy loam, clay or sand including lift up to 1.50m and lead up to 30M |
| 5 | Preparation of Sub-grade for Lining excluding cost of earth work. |
| 6 | Laying .C.C.(1:3:6) with coarse sand ,cement, stone, ballast 20mm to 40mm in size in foundation including cost of all material, labour, T&P etc. |
| 7 | C.R.Stone masonry in 1:3 cement sand mortar including cost of all material for proper completion of work. |
| 8 | Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labour T&P etc. required for praper for completion of work. |
| 9 | 1st class brick masonry in 1:3 cement sand mortar including cost of all material for proper completion of work. |
| 10 | Cement pointing in 1:2 cement, sand mortar on brick masonry including cost of all materials labour T&P etc. required for praper for completion of work. |
| 11 | Providing and fixing of 150 mm dia HDPE 6 kg/m² pressure Pipe Avg. = (12.00+8.00)/2= 10.00 |
| 12 | Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 13 | Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 14 | Cement concrete M-15 1:2:4 in foundation including cost of all material and labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. |
| 15 | Supplying & fixing 20mm thick joint filler board including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 16 | S/L 3mm thick multi-plast Poly Plus Tar paper including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 17 | Providing and laying C.C.(1:1.5:3)with coarse sand cement and 10mm to 20mm crushed stone grite including cost of material, labour, T&Petc. |
| 18 | Laying R.C.C 1:1:2 (M-20 ) with cement , C. sand of F.M. more than 2.0 and crushed hard stone grit i/c cost of all material ,labour ,T&P etc. required for proper completion of work but excluding cost reinforcement . |
| 19 | Colour washing of two coat of parapet including cost of all materials,labour and T&P etc. |
| 20 | Fixing wheel guard stone inclding cost of all of all materials, labours and T&P etc. |
| 21 | E/W in embankment for restoration of canal section on Nearby Pucca works in all type of soil mixed including all lead ,lift dressing , etc. |
| 22 | Providing superviser for watching and warding of work as per direction of Engineer in charge. |
| 23 | Fixing of RCC Precast Boundry piller including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. |
| 24 | Painting of RCC Precast boundry piller size 250x250x900 (mm) including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer-in-charge. |
| 25 | E/W in filling for making approach path & diversion including all lead & lift, cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 26 | E/W in Dismatling approach / diversion including lead lift labour T&P etc . As per direction of Engineer -in -charge . |
| 27 | Dry stone boulder Pitching 200mm thick , filling joint with sand including cost of all type of labour, material, T&P etc. for proper completion of work as per direction of in- charge. |
| 28 | Stone Aggregate 20 to 40 mm laid in abutment including cost of all type of labour, material, T&P etc. for proper completion of work as per direction of in- charge. |
| 29 | Uprooting of behaya / sarpat / gondi / elephant grass and other weeds and its disposal including all cost of material, labour and T&P etc. required for proper completion of the work. |
| 30 | Earth work for preparing Sub-base and Road embankment and patari including all cost of material, labour and T&P etc. required for proper completion of the work. |
| 31 | Dry brick on edge soling , including all cost of material, labour and T&P etc. required for proper completion of the work. Please Enable Macros to View BoQ information |