|
| 1 | Providing and fixing in position collapsible steel shutters with vertical channels and braced with flat iron diagonals size, with top and bottom rail with steel pulleys, complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer |
| 2 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size |
| 3 | 20mm cement plaster finished with a floating coat of neat cement of mix1 : 4 ( 1 cement : 4 fine sand) |
| 4 | 15mm cement plaster on the rough side of single or half brick wall finished with a floating coat of neat cement of mix :1 : 4 ( 1 cement : 4 fine sand) |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for |
| 6 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 7 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade on New work (two or more coats) over and including priming coat with water thinnable cement primer |
| 8 | Steel work in built up round, square or rectangular/angular sections including cutting, punching, hoisting, fixing in position and welding/bolting with special shaped GI nut and bolts with steel and bitumen washers etc.complete job.Manufacturers: TATA, Jindal, Apollo, JSW, SAIL |
| 9 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded |
| 10 | Carriage of Cement by MT from Ganderbal to Dumail |
| 11 | Carriage of cement and other material by head load from dumping site at HolyCave store/ to Site of execution at HolyCave including loading of cement at Baltal store and unloading of the same at HolyCave |
| 12 | Carriage of sand and bajri by head load for an avg lead of 6 km. Please Enable Macros to View BoQ information |