|
| 1 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : |
| 2 | P/L dry Stone Soling hand packed consalidation with hand rammers incl. all carriage complete job |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) crushed |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 5 | Coursed Rubble Masonry with hard stone in foundation and plinth and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse Sand) , second sort complete job |
| 6 | Extra for face chisel dressing of stones |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. |
| 8 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 9 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in- charge. Made of G.I. wire of dia 4 mm |
| 10 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete On steel work |
| 11 | Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand ) Flush/Ruled pointing |
| 12 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 13 | Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment) incl. supplying and spreading of sludge , dump manure or/ and good earth in required thickness as per dirrections of officer in charge I/c all carriage |
| 14 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking the clods and mixing with sludge or manure in the ration of 8:1 (8 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of sludge or manure after reduction by 8 %), flooding with water, filling with the earth if necessary, watering and finally fine dressing, leveling etc. including stacking & disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 mtr. and lift upto 1.5 mtr. complete (cost of sludge, manure or extra earth to be paid for separately) |
| 15 | Grassing with selection no. 1 grass including watering & maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds & fit for mowing including supplying of good earth if needed (the good earth shall be paid separately.)with grass turf |
| 16 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 part of stacked volume of earth after reduction by 20% :1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish & surplus earth, if any with all leads & lifts (cost of sludge, manure or extra good earth, if needed, to be paid for separately) Holes 45 cm dia & 45 cm deep |
| 17 | Supplying and planting of healthy, disease-free Coniferous Plants: Deodar Cedar (Cedrus deodara) Blue Pine (Pimus wallichiana)/Chir Pine (Pinas roxburghii)/Cypress (Cupressus torulosa)/Junipers (Juniperus spp.) etc of approved variety and size (2 to 3 ft height), including carriage to site, proper placement in already prepured pits, initial watering, and all labour, tools, and incidental charges necessary to complete the job as directed by the Engineer-in-Charge. The contractor shall maintain the plants for a period of one year, and if any plant fails or dries during this period, the contractor shall replace it at his own cost with a plant of the same species and size as originally specified |
| 18 | Carriage of different items by machanical transport , sand from for an average lead of 25 Kms |
| 19 | Carriage of different items by machanical transport , bajiri from for an average lead of 20 Kms |
| 20 | Carriage of different items by machanical transport , stones from for an average lead of 20 Kms |
| 21 | Carriage of different items from dumoing site to the site of work by head load for an average lead of 100 mtrs , Sand |
| 22 | Carriage of different items from dumoing site to the site of work by head load for an average lead of 100 mtrs , bajiri |
| 23 | Carriage of different items from dumoing site to the site of work by head load for an average lead of 100 mtrs , stones |
| 24 | Carriage of different items from dumoing site to the site of work by head load for an average lead of 100 mtrs , cement |
| 25 | Carriage of different items from dumoing site to the site of work by head load for an average lead of 100 mtrs , TOR/ST.STEEL Please Enable Macros to View BoQ information |