| 1 | Earth work in excavation in foundation trenchees in ordinary soil and disposal of excavated earth ……………...-do-……. all complete as per approved design and building specification & direction of E/I. |
| 2 | Clearing Grass and Removal of Rubish Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area |
| 3 | Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 4 | Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. |
| 5 | Tack Coat on Bituminous surfaces Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 6 | Dense graded Bituminous Macadam Grading-II with VG-30 Grade Packed Bitumen Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @4.5 percent by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 505 complete in all respects. |
| 7 | Bituminous concrete Grading- II with VG-30 Grade Packed Bitumen Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment , rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 507 complete in all respects. |
| 8 | Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. |
| 9 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.) |
| 10 | Kilometre Stone (Reinforced cement concreteM15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) .ordinary kilometer stone (precast) |
| 11 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per Clause 401With Grading-III Material |
| 12 | Providing P.C.C. M-150 in nominal mix of (1:2:4) in road embankment with Stone Chips …….-do- …... all complete as per approved design and building specification & direction of E/I. |
| 13 | Providing and laying factory made chamfered edge Cement Concrete paver blocks In foot path, park & lawns driveway or light & traffic parking etc. of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of dust, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand, all complete as per manufacturer's specifications & direction of Engineerin-Charge.80 mm thick Cement concrete paver block of M-30 grade with approved colour, design & pattern. |
| 14 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). |
| 15 | 16.47 Painting runway/taxi track/apron marking with adequate nos of coats to give uniform finish with road marking paint of superior make as approved by the Engineer-in-charge, i/c cleaning the surface of ail dirt, scales, oil, grease and other foreign material etc. and lining out complete.New work (Two or more coats) |
| 16 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method withfront end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per Clause 401With Grading-V Material |
| 17 | Providing centering and shuttering incliding struting,proping etc. and removal of form for foundation…….do…….. |
| 18 | providing random rubble stone masonry in C.M.(1:4) in foundation and plinth with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M. 2 to 2.5 including cost of screening ,rakingout joints to 20mm depth ,curing,taxes and royality all complete as per building specification and direction of E/I |
| 19 | Carriage of materials (i) boulder |
| 20 | (ii)metal |
| 21 | (iii) Sand |
| 22 | (iv) Stone Chips |
| 23 | (v) Disposal of cutted earth lead |
| 24 | (vi) Dust |
| 25 | Add for GST 18% |
| 26 | Add for Labour Cess 1% Please Enable Macros to View BoQ information |