| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil. RCD 12.01 I B (i) |
| 2 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Rock RCD 12.01 II A (i) |
| 3 | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. RCD 16.01 |
| 4 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. RCD 12.04 |
| 5 | Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specification . PCC Grade M15 RCD 12.08 A Case II |
| 6 | Stone masonary work in cement mortar 1:3 in foundation complete as per drawing and technical specifications…................................. Random Rubble masonary (coursed/uncoursed) RCD 12.07 (B) |
| 7 | Stone masonary work in cement mortar 1:3 for substructure complete as per drawing and technical specifications…................................. Random Rubble masonary (coursed/uncoursed) RCD 13.04 (A) |
| 8 | Providing weep holes in brick masonary Plain/Reinforced cement concrete abutment, wing wall return wall with 100mm dia AC pipe, extending through the full width of the structure with slopes of 1V:20H towards drawing face. Complete as per drawing and technical specifications. RCD 13.08 |
| 9 | Hire charge of diesel operated pump (5 HP Pump) for bailing out water from foundation trenches where necessary including cost of fuel pay of operated with depreciation of major repair including profit (pump supplied by agency). PM-29 WRD Pg-83+ 10% CP |
| 10 | Plain/Reinforced cement concrete in sub- structure complete as per drawing and Technical Specification . RCC Grade M25 RCD 13.05 F (P) I |
| 11 | Furnishing and placing Reinforced / Prestressed cement concrete in Super-structure as per drawing and technical specification….......... RCC Grade M20 RCD Case 14.1 A (P) |
| 12 | Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. RCD14.07 |
| 13 | Providing 25 mm thick cement plaster (1:4) with approved quality of sand of requisite F.M. (2.5 to 3) washed and screened and its removal, royalty and taxes etc. complete job as per specification and direcition of E/l. 5.5.5 WRD |
| 14 | Providing two coats of plastic emulsion paint of approved shade and make over a coat of cement primer over new surface including preparing plastered surface by rubbing smooth with pumice stone or fine sand paper, applying putty wherever required, scaffolding washing of floor and taxes all complete as per building specification and direction of E/I. BCD 5.8.21 |
| 15 | Supplying , fitting and placing HYSD bar Reinforcement in super structure complete as per drawing and technical specification RCD 14.02 |
| 16 | Earth work in filling foundation trenches or back filling of structures in layer not exceeding 150mm thick well watered, rammed and fully compacted and finally dressed with suitable earth obtained from excavation of foundation trenches and placed in suitable profile with a lead of 30m and lift of 1.5m all complete as per specification and direction of E/l. WRD 6.1.16 |
| 17 | Construction of Embankment with approved material obtained from Borrowpits construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement . RCD 3.16 |
| 18 | Construction of granular sub- base by providing close graded material mixing in a mechanical mix plant at OMC carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density complete as per clause 401. RCD 4.01 (A) |
| 19 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/vibratory roller in stages to proper grade and camber applying and brooming requists type of screening binding materials to fill up the interstices of coarse aggregate watering and compacting to the required density. RCD 4.11 (A)(i) |
| 20 | Carriage of materials |
| 21 | (i) Cement – Lead 20 KM(S) + 1 KM(k) |
| 22 | (ii) Sand – Lead 15 KM(S) + 1 KM(k) |
| 23 | (iii) Stone Chips – Lead 25 KM(S) + 1 KM(k) |
| 24 | (iv) Boulder – Lead 25 KM(S) + 1 KM(k) |
| 25 | After adding GST @18% on total estimated value the total estimated amount is |
| 26 | Labour Cess @1% on above total estimated amount Please Enable Macros to View BoQ information |