| 1 | RENOVATION POND |
| 2 | 2.31 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees andsaplings of girth up to 30 cm measured at a height of 1 m above ground level andremoval of rubbish up to a distance of 50 m outside the periphery of the area cleared |
| 3 | 60.2.4 BAILING OUT WATER USING PUMP ABOVE 10HP AND UP TO 20HP -Bailing out water with engine and pump set above 10HP and up to 20HP, includingconveyance to site and erection,cost of fuel, lubrication oil and other stores, pay ofstaff etc complete |
| 4 | 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual meansover areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.All kinds of soil |
| 5 | 2.26.1 Extra for every additional lift 1.5 m or part there of in excavation / banking excavatedor stacked materials.All kinds of soil |
| 6 | 2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual meansin foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift up to 1.5 m, includinggetting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m.All kinds of soil |
| 7 | 4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mmnominal size derived from natural sources) |
| 8 | 60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonrywith good quality blasted rubble including packing to compactness to lines and levelscost and conveyance of all materials labour charges etc. complete as per direction ofDepartmental officers at site |
| 9 | 5.1.3 Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mmnominal size derived from natural sources) |
| 10 | 7.1.1 Random rubble masonry with hard stone in foundation and plinth including levellingup with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarsesand) |
| 11 | 4.3.2 Centering and shuttering including strutting, propping etc. and removal of form workfor:Retaining walls, return walls, (any thickness) including attached pilasters,buttresses, plinth and string courses fillets, kerbs and steps etc. |
| 12 | 5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placingin position and binding all complete upto plinth levelThermo - Mechanically Treatedbars of grade Fe-500D or more |
| 13 | 10.25.2 Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer usingstructural steel etc. as required.In gratings, frames, guard bar, ladder, railings,brackets, gates and similar works |
| 14 | 19.6.10 Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement : 2 finesand) including testing of joints etc. complete:900 mm dia R.C.C. pipe |
| 15 | 13.48.1 Finishing with Deluxe Multi surface paint system for interiors and exteriors usingprimer as per manufacturers specifications:Two or more coats applied on walls @1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10sqm |
| 16 | 13.61.1 Painting with synthetic enamel paint of approved brand and manufacture to give aneven shade:Two or more coats on new work |
| 17 | 51.2.3 Filling with Quarry Muck <br> Filling up low lying and water logged areaswith local material/ quarry muck, spreading in layers, leveling the top at site andconsolidation by ramming, etc complete for improving the CBR value of subgrade |
| 18 | 16.68 Providing and laying 60 mm thick factory made cement concrete interlocking paverblock of M - 30 grade made by block making machine with strong vibratorycompaction, of approved size, design & shape, laid in required colour andpattern over and including 50 mm thick compacted bed of coarse sand, filling thejoints with fine sand etc. all complete as per the direction of Engineer-in-charge. |
| 19 | OD364049/2025-2026 Supplying and fixing granite board 0.60m x0.45m with cc 1:2:4 1.00m x 1.00m |
| 20 | DRAIN |
| 21 | 3.5.2 Excavation in Soil with Dozer with lead upto 100 m <br> Excavation forroadway in soil by mechanical means including cutting and pushing the earth to siteof embankment upto a distance of 100 m, including trimming bottom and side slopesin accordance with requirements of lines, grades and cross-sections |
| 22 | 11.4.1.1 Providing concrete for plain/reinforced concrete in open foundations complete as perdrawings and technical specifications Clause 802, 803, 1202 & 1203 <br>I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6 |
| 23 | 12.5.2.1 Plain/reinforced cement concrete in substructure complete as per drawings andtechnical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 <br>For height upto 5 m <br> II. P.C.C. grade M 20 <br>(i) Nominal mix(1:2:4) |
| 24 | 13.1.1.1 Providing and laying reinforced cement concrete in superstructure as per drawing andtechnical specifications Clauses 800, 1205.4 and 1205.5 <br> I. R.C.C grade M20 <br> (i) For nominal mix 1:2:4 |
| 25 | 12.6 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructruecomplete as per drawings and technical specification Clauses 1002, 1005, 1010& 1202 |
| 26 | EXCLUSIVE OF GST |
| 27 | Note :1 All materials, Items, Equipment shall be best branded items with IS and approved by client/KEL |
| 28 | 2:Rate should be inclusive of Insurance,Transportation, delivery and installation cost for all items |
| 29 | 3.Rate should be Exclusive of GST. |
| 30 | 4.Work should be executed as per DSR/PWD specification and direction of Engineer at site. |
| 31 | 5.CEMENT: Make use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference. |
| 32 | 6.RCC: (Assessment of strength of concrete by Cube testing at Approved Govt labs as per IS) Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference. |
| 33 | 7.STEEL REINFORCEMENT: Make: Tata,Vaishak, SAIL, JSW or eq primary make in the order of preference |
| 34 | 8.CENTERING & SHUTTERING: (Centering and shuttering for different category of work may be considered separately.) |
| 35 | 9. ACRYLIC SMOOTH EXTERIOR PAINT/ SYNTHETIC ENAMEL PAINT/WHITE CEMENT BASED PUTTY/ CEMENT PRIMER: Make: Asian, Berger, Nerolas or eq. in the order of pref. Please Enable Macros to View BoQ information |