| 1 | ( Aug. 63 kVA to 400 kVA S/Stn.) |
| 2 | 11/0.4 KV 400 KVA Distribution Transformer |
| 3 | G.O.Switch AB Switch unit (11 kV, 400 A, 25 kA) Double Pole O/D type |
| 4 | D.O.Fuse unit |
| 5 | Surge Arrestors 9 kV, 10 kA Station Class (Porcelain type) |
| 6 | LT Distribution Panel Box with ACB (630A, 50 kA, 3P, 1No. And MCCB (250A, 36 kA 3P, 3 Nos.) |
| 7 | Prov. 3 Phase 4 Wire CT Operated Static Trivector HT meter (CT-400/5 A) |
| 8 | Pipe Earthing Set |
| 9 | 6 SWG G.I wire for earthing |
| 10 | AAAC 7/3.15 mm 55 mm2 for jumpers and connections |
| 11 | M.S. Nuts and Bolts (Off Sizes) |
| 12 | A. Thimble 300 sq mm Provided by HPSEBL |
| 13 | Copper Thimble 95 sq. mm Provided by HPSEBL |
| 14 | Danger Plate Provided by HPSEBL |
| 15 | Barbed Wire |
| 16 | LT Cable (3.5 Core) 400mm2 for incomer (Havells MR with 30% Discount) |
| 17 | LT Cable (3.5 Core)185 mm2 for outgoing and control room connections (Havells MR with 30% Discount ) |
| 18 | CT/PT Unit PT(1 Unit,11KV/110V) CT (3 No,100/5A) |
| 19 | Control Cable for HT metering 2.5mm2 PVC(1.1 kV, 10C, HR FRLS, Cu, Screen) |
| 20 | CT/PT Unit Belting & Knee Bracing |
| 21 | Channel Iron (75x40x6mm) Length 2800mm for CT/PT Unit |
| 22 | MS Angle Iron (50x50x6 mm) length 2800mm x4 |
| 23 | MS Angle Iron (35x35x6 mm) length 450mm x2 |
| 24 | Civil work i.e Transformer plinth/Bed and at line poles |
| 25 | Civil work i.e Chain Link Fencing, Angle iron, Gate etc. for transformer fencing a/w protection work |
| 26 | Add Transporation Charges |
| 27 | Add Erection Charges i.e. Erection of Transformer, LT Panel, Energy Meter, Erection of LT Cable & Dismantling of old Transformer and carriage to the Divisional Store Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. Please Enable Macros to View BoQ information |