| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing andramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing andramming the bottom, bailing out water as required complete (c)Depth of excavation for additional depthbeyond 3000 mm. upto 4000mm. excluding cost of shoring as necessary. |
| 4 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete asper direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(a) Depth upto 1.5 m. |
| 5 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete asper direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(b) Depth upto 1.5 m. upto 3.0 m |
| 6 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete asper direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge)(c) For additional depth beyond 3.00 m. |
| 7 | Hire and labour charges for 100 mm dia bamboo railing on 150 mm dia Jhau/Eucalyptus or other approved timber posts each 2.0 m in length, tied 2 number post strongly with coir ropes in the fashion of a scissor with a spacing of 1.8 m over pacca road without damaging the surface and tying strongly 3 (three) rows of bamboo railing on each leg and 1 (one) railing connecting all the pivot junctions including cost of loading unloading, stacking & carriage of all materials and labour complete, and maintaining barricading for a period beyond 5 (five) days after the reported & recorded time of completion of the entire work to the satisfaction of Engineer-in- Charge. (Note: This work should not be executed without specific permission of Superintending Engineer). (100 mm. dia bamboo railing & 150mm. dia Jhau/Eucalyptus/other approved timber posts @ 1.80m apart). (ii) Railing 3 row on each leg and 1 at pivot point. |
| 8 | MS PLATE AS PER IS: 2062-2011/ LATEST REVISION, MAKE SAIL/TATA/JINDALB) ABOVE 2 MM UPTO 10 MM THICKNESS |
| 9 | Fabricating M.S. Specials of different diameter in shop out of 8 mm to 12 mm thick M.S plates supplied depart-mentally, cutting the plates to exact size & shape by gas cutting device and/or by adopting any other approved type of mechanical means, bending the same in true curvature by template and rolling machine of approved design including proper marking, levelling joints followed by electric arc welding - longitudinal and circumferential, as necessary, using standard electrodes as per I.S.specification including edge preparation, electricity charges and hydraulic testing of the fabricatedpiece all complete as per specification and direction of the Engineer-in-Charge.[ The Engineer-in-Charge shall approve the electrodes for are welding before use. Fabrication of M.S. flange to form M.S Flanged Tail Piece shall not be considered as M.S. special ]c) 750 mm diameter i) 10mm thick |
| 10 | Hiring charge of 1 no. 125KVA 3 Phase silent DG set including supply & fixing of 400 Amp 4 pole changeover switch and laying of required capacity and lenght of cable with connection as reqd. (on temporary basis) and engaged one generator operator round the clock to run the generator as and when required(Including Fuel). |
| 11 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. |
| 12 | Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage andmaking wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shallbe executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied inabsolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor] |
| 13 | Hiring& labour charges for diesel generating set for lighting including fuel, 300 M wire, 11 points with 200 Watt bulb with post for handling & maintaining the same for day & night for the period. |
| 14 | Removal of silt, slush, musks or any other foul materials from open drains or nikashis of any size and depth, manholes, gully pits, catch pits etc. by any other method approved of impure / inflammable / asphyxiating gases from the drains etc. with staging if necessary, stacking of the materials properly away from traffic lane as far as practicable lead upto 75 mtr. with all labour and materials and hire charges of tools and plants as per direction of Engineerin- Charge. For Open Nikashi or Drain. Transportation of silt, slush or other foul materials from the working site and disposal of the same beyond the area of Municipal Corporation / Municipality / Notified Area Authority / Industrial ownship Authority including the cost of loading, unloading, transportation and making arrangement of necessary land for disposal, spreading and leveling as ecessary etc. complete (Land for disposal to be arranged by the contractor). (Payment to be made on the basis of stack measurement after deducting sinkage/shrinkage at the rate of 1/9th of volume) For Day : |
| 15 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (a) In ground floor including roof. |
| 16 | Brick work with 1st class bricks in cement mortar (1:4) (a)In foundation and plinth |
| 17 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge |
| 18 | MAZDOOR (MALE) |
| 19 | Sub Total |
| 20 | GST 9% |
| 21 | GST 9% |
| 22 | CESS 1% Please Enable Macros to View BoQ information |