| 1 | Item Description/ Heading |
| 2 | A) FOR G.T Feeder 11 KV maintenance -Transportation of pole at site |
| 3 | Erection of metallic pole of 12 metre length (CPWD SOR' 2012, P-36, 11.3.4) |
| 4 | Fabrication and erection of bracket & clamps |
| 5 | Supply & erection of M.S Nut, Bolts & washers (Present market Rate) |
| 6 | Supply & erection of 11 KV Disc insulator (CPWD SOR' 2012, P-42, 13.11) |
| 7 | Supply & erection of 11 KV Pin insulator (CPWD SOR' 2012, P - 42, 13.10) |
| 8 | Dismantle of faulty cable jumper from O/H line |
| 9 | Taking down of two nos PVC insulated faulty power cable 185/240 sq mm of 11 KV grade (CPWD SOR' 2012, P-28, 8.3.2) 60+40 = 100 mtrs |
| 10 | Damage & weak jumper repairing with binding wire etc. |
| 11 | Dismantle of jumper for changing of faulty disc |
| 12 | Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (CPWD SOR' 2012, P-40, 12.40) |
| 13 | Erection of Conductor of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) |
| 14 | Taking down of one no. PVC insulated power cable of 11 KV grade of 185 sq mm for making cable joint (CPWD SOR' 2012, P-28, 8.3.2) |
| 15 | Supplying and making outdoor cable end termination with heat shrinkable jointing kit complete with all accessories including lugs suitable for 185/240 sq mm size of 3 core, XLPE aluminium conductor cable of 11 KV grade (CPWD SOR' 2012, P-35, 10.5.3) |
| 16 | Laying/Hanging of two nos PVC insulated power cable of 11 KV grade of 185 sq mm after making cable joint (CPWD SOR' 2012, P-28, 8.3.2) 10+40 = 50 mtrs |
| 17 | Electrical cable joint with switch by lugs & other jointing materials |
| 18 | Making new fresh jumper with O/H line |
| 19 | Supplying and erection of three piece nonlinear resistor type lightning arrestor suitable for 3 wire, 11 KV overhead lines with rated voltage 9 KV (rms) (CPWD SOR' 2012, P-42, 13.13) |
| 20 | Tree & branches cutting below O/H line (Semi Skilled) |
| 21 | A) FOR Khaira 2.2 KV, Khaira LT, Machli Patti, E.B Section 550V & LT O/H line maintenance -Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (CPWD SOR' 2012, P-40, 12.40) |
| 22 | Transportation of pole at site |
| 23 | Erection of metallic pole of 8 to 10 metre length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required (CPWD SOR' 2012, P-36, 11.3.3) |
| 24 | Fabrication & erection of bracket & clamps |
| 25 | Supply & erection of M.S Nut & Bolts |
| 26 | Supplying and erection of 100 mm X 110 mm shackle insulators with G.I bolts, nuts, and straps etc. as required (CPWD SOR' 2012, P-39, 12.17) |
| 27 | Erection of Conductor of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) |
| 28 | Erection of Conductor of 7/2.11 mm to 7/3.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.21) |
| 29 | Damage & weak jumper repairing with binding wire etc. |
| 30 | Opening of burnt cable jumper from O/H line |
| 31 | Taking down of one no. PVC insulated power cable of 11 KV grade of 240 sq mm for making fresh lead (CPWD SOR' 2012, P-28, 8.3.2) |
| 32 | Laying/Hanging of one no. PVC insulated power cable of 185 sq mm after making fresh lead (CPWD SOR' 2012, P-28, 8.3.2) |
| 33 | Jumpering above cable with O/H line |
| 34 | Dismantle of pole/street light standard/strut embedded in cement concrete foundation etc. as required (CPWD SOR' 2012, P-40, 12.42) |
| 35 | Transportation of dismantled pole from site to store |
| 36 | Tree & branches cutting below O/H line (Semi Skilled) |
| 37 | C) FOR Store & main Sub Station maintenance - Transportation of pole at site |
| 38 | Erection of metallic pole of 8 to 10 metre length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required (CPWD SOR' 2012, P-36, 11.3.3) |
| 39 | Man power for CT & other missc work |
| 40 | Transportation of 4 Drum oil from Regional Store to Colliery store |
| 41 | Transportation of 500 mtrs Rabbit & 500 mtrs Dog conductor from Regional store |
| 42 | Damp switch cleaned with CRC, thiner etc |
| 43 | Crane for transporting of 12 mtr pole from Regional Store to colliery store |
| 44 | D) FOR Ganshadih Feeder 11 KV maintenance - Damage & weak jumper repairing with binding wire etc. |
| 45 | Opening jumper for changing of faulty Disc insulator |
| 46 | Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (CPWD SOR' 2012, P-40, 12.40) |
| 47 | Supply & erection of 11 KV Disc insulator for O/H line with galvanised insulator fittings, bolts, nuts, washers etc. as required (CPWD SOR' 2012, P-42, 13.11) |
| 48 | Erection of Wolf Conductor meters of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) |
| 49 | Making new jumper with O/H line after changing of faulty Disc |
| 50 | E) FOR E.B Section Sub Station & 11 KV maintenance - Damage & weak jumper repairing with binding wire etc. |
| 51 | Damp two switches cleaned with CRC, thiner etc |
| 52 | Dismantle of jumper for changing of faulty disc |
| 53 | Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (CPWD SOR' 2012, P-40, 12.40) |
| 54 | Supply & erection of 11 KV Disc insulator for O/H line with galvanised insulator fittings, bolts, nuts, washers etc. as required (CPWD SOR' 2012, P-42, 13.11) |
| 55 | Erection of Conductor of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) |
| 56 | Making new jumper with O/H line after changing of faulty Disc |
| 57 | Opening of burnt cable jumper from O/H line |
| 58 | Taking down of one no. PVC insulated power cable of 11 KV grade of 240 sq mm for making fresh lead (CPWD SOR' 2012, P-28, 8.3.2) |
| 59 | Laying/Hanging of one no. PVC insulated power cable of 185 sq mm after making fresh lead (CPWD SOR' 2012, P-28, 8.3.2) |
| 60 | Jumpering above cable with O/H line |
| 61 | Tree & branches cutting below O/H line (Semi Skilled) |
| 62 | F) FOR Provision of new LT line at Khaira - Fabrication of pole by welding |
| 63 | Transportation of pole at site |
| 64 | Erection of metallic pole of 8 to 10 metre length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required (CPWD SOR' 2012, P-36, 11.3.3) |
| 65 | Fabrication and erection of bracket & clamps |
| 66 | Supply & erection of M.S Nut & Bolts |
| 67 | Supplying and erection of Stay set complete (galvanised) with 19/20 mm dia X 1.8 metres long stay rod (CPWD SOR' 2012, P-41, 13.1) |
| 68 | Supplying and erection of 100 mm X 110 mm shackle insulators with G.I bolts, nuts, and straps etc. as required (CPWD SOR' 2012, P-39, 12.17) |
| 69 | Erection of Conductor of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) |
| 70 | Making new jumper with O/H line |
| 71 | Laying/Hanging of one no. PVC insulated power cable of 185 sq mm after making fresh lead (CPWD SOR' 2012, P-28, 8.3.2) |
| 72 | Supplying and making indoor cable end jointing with cast resin compound including lugs and other jointing materials for 240 sq mm 3 core XLPE aluminium conductor cable of 11 KV grade (CPWD SOR' 2012, P-34, 10.1.3) |
| 73 | Electrical connection both incomer & outgoing side of switch, outgoing side of Transformer at Sub-Station & both incomer & outgoing side of switch, incomer of motor at de-watering pumping side with HT tape and other jointing materials (Present Market Rate) |
| 74 | Erection of cradle guard with G.I 8 no. |
| 75 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |