|
| 1 | Item Description/ Heading |
| 2 | A) FOR Main 15 no. G.T Feeder 11 KV maintenance -Opening jumper for searching faults & after megguring re-jumpering |
| 3 | Dismantle of jumper for changing of faulty disc |
| 4 | Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (CPWD SOR' 2012, P-40, 12.40) |
| 5 | Supply & erection of 11 KV Disc insulator (CPWD SOR' 2012, P-42, 13.11) |
| 6 | Supply & erection of 11 KV Pin insulator (CPWD SOR' 2012, P - 42, 13.10) |
| 7 | Erection of Conductor of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) |
| 8 | Making new jumper with O/H line |
| 9 | Damage & weak jumper repairing with binding wire etc. |
| 10 | Erection of cradle guard with G.I wire |
| 11 | Tree branches and bush cutting/trimming |
| 12 | B) for Store work - Transportation of Dog conductor 1500 mtrs from Regional Store |
| 13 | Transportation of Rabbit conductor (500 + 1000 mtrs in 2 days) from Regional Store (5 Heads + 6 Heads = 11 Heads) |
| 14 | Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (ACSR Wolf Conductor 3200 Meters) (CPWD SOR' 2012, P-40, 12.40) |
| 15 | Transportation of above conductor (2 heads*6 days) |
| 16 | Transportation of wolf conductor from HMP Colliery |
| 17 | Transportation of 185 sq mm cable 60 mtrs from other colliery |
| 18 | Collecting angle from ekra workshop for fabricate bracket and clamps |
| 19 | Dismantle of bracket and clamps from idle pole (CPWD SOR' 2012, P-40, 12.40) |
| 20 | C) FOR 550V O/H line maintenance - Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (CPWD SOR' 2012, P-40, 12.40) |
| 21 | Erection of Conductor of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) |
| 22 | D) FOR Coal depot, CISF check post etc (Patch-B) - Fixing and fitting with connection 400 watt flood light on O/H pole |
| 23 | Dismantle of pole (CPWD SOR' 2012, P-40, 12.42) |
| 24 | Transportation of dismantled pole |
| 25 | Fixing and fitting with connection 70/60/50 watt flood light on O/H pole |
| 26 | Laying/Hanging of two nos PVC insulated power cable of 1.1 KV grade of 35 sq mm (CPWD SOR' 2012, P-26, 7.5.1) 30 + 20 = 50 mtrs |
| 27 | Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (CPWD SOR' 2012, P-40, 12.40) |
| 28 | Transportation of pole at site for erection |
| 29 | Erection of metallic pole of 8 to 10 metre length (CPWD SOR' 2012, P-36, 11.3.3) |
| 30 | Fabrication & erection of bracket & clamps |
| 31 | Supply & erection of MS Nut & Bolts |
| 32 | Supplying and erection of Stay set complete (CPWD SOR' 2012, P-41, 13.1) |
| 33 | Supplying and erection of 100 mm X 110 mm shackle insulators (CPWD SOR' 2012, P-39, 12.17) |
| 34 | Erection/Sagging of Conductor 7/2.11 mm to 7/3.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.21) |
| 35 | Making new jumper |
| 36 | Electrical/Mechanical cable joint with switch |
| 37 | Dismantling & taking down faulty 70 watt flood light |
| 38 | E) FOR Coal depot, CISF check post etc (Patch-A) - Laying/Hanging of one no. PVC insulated power cable of 1.1 KV grade of 35 sq mm (CPWD SOR' 2012, P-26, 7.5.1) |
| 39 | Transportation of pole at site for erection |
| 40 | Erection of metallic pole of 8 to 10 metre length (CPWD SOR' 2012, P-36, 11.3.3) |
| 41 | Fixing and fitting of 70/50 watt Flood light on O/H Pole with clamping & connection |
| 42 | F) FOR Different LT O/H line maintenance - (i) Sudamdih Colony LT O/H line - Erection of Conductor of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) |
| 43 | Erection/Sagging of Conductor of 7/2.11 mm to 7/3.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.21) |
| 44 | Damage & weak jumper repairing with binding wire etc. |
| 45 | Tree and branches cutting below O/H line |
| 46 | (ii) near main Sub-Station LT O/H line - Transportation of pole at site for erection |
| 47 | Erection of metallic pole of 8 to 10 metre length (CPWD SOR' 2012, P-36, 11.3.3) |
| 48 | (iii) I.N Chandro LT O/H line - Erection/Sagging of Conductor of 7/2.11 mm to 7/3.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.21) |
| 49 | (iv) Rawani Basti LT O/H line - Erection/Sagging of Conductor of 7/2.11 mm to 7/3.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.21) |
| 50 | (v) Durga Mandir LT O/H line - Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (CPWD SOR' 2012, P-40, 12.40) |
| 51 | Erection of Conductor of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) |
| 52 | (vi) 2 no. CISF Camp LT line & Sub-Station - Damp switch cleaned with CRC, thiner etc |
| 53 | Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (CPWD SOR' 2012, P-40, 12.40) |
| 54 | Erection/Sagging of Conductor 7/2.11 mm to 7/3.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.21) |
| 55 | Misc work at Sub-Station |
| 56 | Damage & weak jumper repairing with binding wire etc. |
| 57 | (vii) Pasi Dhowrah LT line - Erection/Sagging of Conductor 7/2.11 mm to 7/3.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.21) |
| 58 | (viii) Chanak LT O/H line - Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (CPWD SOR' 2012, P-40, 12.40) |
| 59 | Dismantle of pole (CPWD SOR' 2012, P-40, 12.42) |
| 60 | Transportation of dismantled pole |
| 61 | Transportation of pole at site for erection |
| 62 | Erection of metallic pole of 8 to 10 metre length (CPWD SOR' 2012, P-36, 11.3.3) |
| 63 | Fabrication & erection of bracket & clamps |
| 64 | Supply & erection of MS Nut & Bolts |
| 65 | Supplying and erection of 100 mm X 110 mm shackle insulators (CPWD SOR' 2012, P-39, 12.17) |
| 66 | Erection/Sagging of Conductor of 7/2.11 mm to 7/3.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.21) |
| 67 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |