| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) includinggetting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, asdirected by Engineer-in-charge. All kinds of soil |
| 2 | Dry stone pitching (any thickness) excluding cost of stones. On Horizontal |
| 3 | Providing and laying cement concrete in retaining walls, return walls, walls (anythickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-III) including manufactured sand derived from Recycled Concrete Aggregate (RCA) upto 25% : 4 graded stone aggregate 20 mm nominal size including Recycled Concrete Aggregate (RCA) upto 25%)). |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 manufactured sand derived from Recycled ConcreteAggregate (RCA) : 6 graded stone aggregate 40 mm nominal size RecycledAggregate (RA)) |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 cement : 4 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 8 graded stone aggregate 40 mm nominal size Recycled Aggregate (RA) |
| 6 | Centering and shuttering including strutting, propping etc. and removal of formwork for :Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. |
| 7 | Carriage of material by MT from source to site of work, incl. loading, unloading complete a)Solling Stone an avg lead 15 km |
| 8 | b)Cement an avg lead 80 km |
| 9 | c)Sand an avg lead 20 km |
| 10 | d)Stone Agg an avg lead 20 km |
| 11 | Carriage of material by Head load from source to site of work, incl. loading, unloading complete a)Stone an avg lead 200 mtrs |
| 12 | b)Cement an avg lead 200 mtrs |
| 13 | c)Sand an avg lead 200 mtrs |
| 14 | d)Stone agg an avg lead 200 mtrs Please Enable Macros to View BoQ information |