| 1 | SH:Formation Cutting |
| 2 | Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) |
| 3 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavationin hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres ) |
| 4 | Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of of lines,grades and cross sections. |
| 5 | (SH:Slab Culvert-1.5 mtr span) |
| 6 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) |
| 7 | I.Ordinary soil Manual Means |
| 8 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) |
| 9 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications (Coursed rubble masonry (first sort ) |
| 10 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications |
| 11 | PCC Grade M-20 Height upto 5m |
| 12 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material |
| 13 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications |
| 14 | Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 |
| 15 | Using Concrete Mixer For solid slab super-structure, 20-30% of (a+b+c) |
| 16 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications |
| 17 | (SH:Slab Culvert-2 mtr span) |
| 18 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material |
| 19 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 20 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.PCC Grade M15 |
| 21 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.PCC Grade M20 |
| 22 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications.Coursed Rubble Masonry(first sort) |
| 23 | Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 |
| 24 | a) Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications |
| 25 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications |
| 26 | (SH:PCC Drain) |
| 27 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out,construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling withapproved material.)Ordinary soil |
| 28 | (A)Manual Means(i)upto 3 m depth |
| 29 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) |
| 30 | Pastering with cement motor 1:6 (1: cement : 6fine sand) |
| 31 | (SH:Retaining Wall) |
| 32 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out,construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling withapproved material.)Ordinary soil |
| 33 | (A)Manual Means(i)upto 3 m depth |
| 34 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) |
| 35 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications.Coursed Rubble Masonry(first sort) |
| 36 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material |
| 37 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications |
| 38 | (SH:Breast Wall) |
| 39 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out,construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling withapproved material.)Ordinary soil |
| 40 | (A)Manual Means(i)upto 3 m depth |
| 41 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) |
| 42 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications.Coursed Rubble Masonry(first sort) |
| 43 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material |
| 44 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications Please Enable Macros to View BoQ information |