| 1 | Taking out existing kerbs stones of all types from footpath/ central verge, including removal of mortar etc. disposal of unserviceable material to the dumping ground for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer in Charge. (N.S.) |
| 2 | Taking out existing channels stones of all types from footpath/ central verge, including removal of mortar etc. disposal of unserviceable material to the dumping ground for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer in Charge. (N.S.) |
| 3 | Taking out existing CC interlocking paver blocks from footpath/central verge, including removal of rubbish etc. disposal of unserviceable material to the dumping ground for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer in Charge. (N.S.) |
| 4 | Disposal moorum/building rubbish/malba/similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer -in- charge. |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be leveled and neatly dressed. |
| 6 | Carriage of earth by mechanical transport including loading, unloading up to 5 km.(Upto Dumping Ground) Complete in all respect and to the entire satisfaction of Engineer-in-charge (DSR 1.1.2) |
| 7 | Laying at or near ground level factory made old kerb stone made of plain cement concrete 1:2:4, in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured to calculate volume for payment). |
| 8 | Laying at or near ground level factory made old channel made of plain cement concrete 1:2:4, in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished channel edging shall be measured to calculate volume for payment). |
| 9 | Providing and laying at or near ground level factory made kerb stone of size 2'x9'x4\\"made of plain cement concrete 1:2:4, in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured to calculate volume for payment). |
| 10 | Providing and laying at or near ground level factory made channel of size 2'x1'x3\\" or 1'x1'x3\\" made of plain cement concrete 1:2:4, in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished channel edging shall be measured to calculate volume for payment) (N.S.) |
| 11 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 10 graded stone aggregate 40 mm nominal size Recycled Aggregate (RA) (DSR 4.1.10 A) |
| 12 | Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 20mm thick compacted bed of cement sand mortar 1:4 including grouting the joints with cement mortar etc. all complete as per the direction of Engineer-in-charge. |
| 13 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over 20mm thick compacted bed of cement sand mortar 1:4 including grouting the joints with cement mortar etc. all complete as per the direction of Engineer-in-charge.Without color pigment. |
| 14 | With color pigment. Please Enable Macros to View BoQ information |