| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Earthwork in excavation in foundation soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M. including all lifts, leveling.. ramming the foundation trenches. removing roots of trees, shrubs all complete as per approved design. building specification and direction of E/I. |
| 3 | Extra for earthwork in hard soil as per specification and direction of E/I(vide classification of soil item-B) |
| 4 | Earth filling in foundation trenches and plinth in layers not exceeding 150m thick well watered, rammed, fully compacted and fine dressed with earth obtained from 'excavation foundation trenches within a lead of 50m and lift of 1.5m all complete as per building specification and direction of E/I (Mode of measurement complacted volume) |
| 5 | Providing coarse clean sand in foundation trenches or in plinth including ramming and wateringin layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour. royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement complacted volume). |
| 6 | Providing designation 75 B One brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work upto plinth level 1:4:8 (one cement: 4 coarse sand: 8 graded stone aggregate) |
| 8 | Providing and laying in position specified of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement. All work upto plinth level 1:1.5:3 (1 cement: 1.5 coarse sand (zone-111):3 graded stone aggregate 20mm nominal size. |
| 9 | Reinforced cement concrete work in walls (any thickness) including attached pilasters,buttresses,plinth ,and string courses,fillets,columns,pillars,abutments, posts and struts etc above plinth level excluding the cost of shuttering finishing and reinforcement 1:1.5:3(1cement: 1.5clean course sand:3graded stone aggregates 20mm nominal size. |
| 10 | Providing and laying in position specified of reinforced cement concrete excluding the cost of centering shuttering, finishing and reinforcement. All work up to plinth level 1:1.5:3 (1 cement: 1.5 coarse sand (zone-111):3 graded stone aggregate 20mm nominal size. |
| 11 | Providing designation 75 B brick work in C.M (1:6) in superstructure with approved Quality of clean course sand of F M.2 to 2.5 including providing 10 mm thick mortar joints .cost of screening materials racking out joints to 15mm depth curing taxes and royalty all complete as per building specification and direction of E/I |
| 12 | Providing 12mm cement plaster (1:6)with clean course sand of FM. 1.5 including screening, curing with all leads cost of water including taxes royalty all complete as per building specification and direction of E/I |
| 13 | Laying and Jointing PVC Pipe. Heading |
| 14 | 8mm dia rods |
| 15 | 10mm dia rods |
| 16 | 12mm dia rods |
| 17 | Providing and applying acrylic moditied resin based texture of Dholpur/Red sand stone pattern with anti algae and UV resistance properties to be applied as intermediate finish in Desired pattern at 43.04 kg/10sqm to form a film of 1 to 1.5mm thickness after scrapping And proper cleaning the surface To remove loose particles from the plaster surface followed by Top coating with premium acrylic smooth exterior paint of Required shade all complete as per direction of E/I. |
| 18 | Centering and shuttering including strutting. propping etc. and removal of form for foundations, footings, bases of columns. ete, for mass concrete. |
| 19 | Centering and shuttering including strutting, propping etc, and removal of form for Lintels, beams, plinth beams. girders, bressumers and cantilevers. |
| 20 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars. Piers. Abutments, Posts, and Struts. |
| 21 | Carriage of materials. |
| 22 | sand. (10KM) |
| 23 | Stone chips lead. (22KM) |
| 24 | Brick. (7+1) KM |
| 25 | Providing and fixing stainless steel(grade 304)gate made of hollow tubes channels, plates ete including welding, grinding bufling, polishing and making curvature(wherever required) and litting the same with necessary stainless steel nuts and bolts complete l/c fixing the gate with necessary accessories & stainless steel dash fasteners, stainless steel bolts ete..of required size, on the top of the floor with suitable arrangement as per approval of Engineer- in charge . |
| 26 | 18% GST |
| 27 | 1% Labour Cess Please Enable Macros to View BoQ information |