| 1 | Tower superstructures |
| 2 | Fabrication and supply of Galvanized Lattice steel tower super structure, ( including hangers, gussets, strain plate(Approximate HT steel =70%, MS=30%) |
| 3 | Galvanized nuts and bolts above |
| 4 | Stub Sets |
| 5 | Partially galvanized stub angle with cleat (HT steel=88%) |
| 6 | Galvanized nuts and bolts for above |
| 7 | Stub setting template |
| 8 | Stub setting template |
| 9 | Galvanized nuts and bolts for above |
| 10 | Power Conductor |
| 11 | ACSR Zebra Conductor |
| 12 | Disc Insulator Strings complete with all hardware fittings and associated clamps |
| 13 | 120KN, Single tension disc insulator string complete with hardware fittings including tension clamp for Zebra Conductor comprising of 15 disc insulators per string |
| 14 | 90 KN, Single Suspension disc insulator string complete with hardware fittings including suspension clamp for Zebra Conductor comprising of 14 disc insulators per string |
| 15 | 240 KN, Double Tension disc insulator string comprising 2 string of 120 KN disc insulator complete comprising of 15 disc insulators per string (B&S type) with hardware fittings including tension clamp for Zebra Conductor. |
| 16 | 180KN, Single Suspension disc insulator string comprising 2 string of 90 KN disc insulator complete comprising of 14 disc insulators per string (B&S type)with hardware fittings including suspension clamp for Zebra Conductor. |
| 17 | Stock Bridge type Vibration Damper for zebra conductor |
| 18 | Performed Armoured Rod |
| 19 | Mid span compression joint |
| 20 | PLCC Equipments |
| 21 | 245kV 1-phase Capacitive Voltage transformer with all fittings and accssories including terminal connectors |
| 22 | Supply of new lattice galvanized steel structure for mounting of CVT |
| 23 | 12C x 1.5 sq.mm Control cable |
| 24 | 4C x 2.5 sq.mm Control cable |
| 25 | Cable glands, lugs & straight through joints for Control cables for the 220kV line Bay |
| 26 | Supply of 220kV, 0.5 mH, 1250 A line trap with all fittings and accessories as per specification. |
| 27 | Supply of HF Co-axial Cable (impedance 75 ohms) |
| 28 | Supply of GI angles for replacement of damaged/missing tower members |
| 29 | Tower and transmission line accessories |
| 30 | Supply of Danger plate |
| 31 | Supply of phase plate |
| 32 | Supply of Number plate |
| 33 | Supply of Anti Climbing Device |
| 34 | Tower superstructures |
| 35 | Fabrication and supply of Galvanized Lattice steel tower super structure, ( including hangers, gussets, strain plate(Approximate HT steel =70%, MS=30%) |
| 36 | Galvanized nuts and bolts above |
| 37 | Stub Sets |
| 38 | Partially galvanized stub angle with cleat (HT steel=88%) |
| 39 | Galvanized nuts and bolts for above |
| 40 | Stub setting template |
| 41 | Stub setting template |
| 42 | Galvanized nuts and bolts for above |
| 43 | Power Conductor |
| 44 | ACSR Zebra Conductor |
| 45 | Disc Insulator Strings complete with all hardware fittings and associated clamps |
| 46 | 120KN, Single tension disc insulator string complete with hardware fittings including tension clamp for Zebra Conductor comprising of 15 disc insulators per string |
| 47 | 90 KN, Single Suspension disc insulator string complete with hardware fittings including suspension clamp for Zebra Conductor comprising of 14 disc insulators per string |
| 48 | 240 KN, Double Tension disc insulator string comprising 2 string of 120 KN disc insulator complete comprising of 15 disc insulators per string (B&S type) with hardware fittings including tension clamp for Zebra Conductor. |
| 49 | 180KN, Single Suspension disc insulator string comprising 2 string of 90 KN disc insulator complete comprising of 14 disc insulators per string (B&S type)with hardware fittings including suspension clamp for Zebra Conductor. |
| 50 | Stock Bridge type Vibration Damper for zebra conductor |
| 51 | Performed Armoured Rod |
| 52 | Mid span compression joint |
| 53 | PLCC Equipments |
| 54 | 245kV 1-phase Capacitive Voltage transformer with all fittings and accssories including terminal connectors |
| 55 | Supply of new lattice galvanized steel structure for mounting of CVT |
| 56 | 12C x 1.5 sq.mm Control cable |
| 57 | 4C x 2.5 sq.mm Control cable |
| 58 | Cable glands, lugs & straight through joints for Control cables for the 220kV line Bay |
| 59 | Supply of 220kV, 0.5 mH, 1250 A line trap with all fittings and accessories as per specification. |
| 60 | Supply of HF Co-axial Cable (impedance 75 ohms) |
| 61 | Supply of GI angles for replacement of damaged/missing tower members |
| 62 | Tower and transmission line accessories |
| 63 | Supply of Danger plate |
| 64 | Supply of phase plate |
| 65 | Supply of Number plate |
| 66 | Supply of Anti Climbing Device |
| 67 | Survey |
| 68 | Detail & Check survey as per specification |
| 69 | Construction of RCC foundation including all Labour, material equipment, excavation shuttering, head loading, back filling etc. Complete for handling, placing, leveling, curing etc. Complete inclusive of cost of transportation batching, mixing cement and reinforcement steel |
| 70 | Concreting |
| 71 | Reinforcement |
| 72 | Brick Soiling works |
| 73 | Providing brick soling in foundation and under floor with stone/best quality picked jhama brick, sand packed and laid to level and in panrl after preparing the subgrade as directed including all labour and materials (a) Brick on flat soling (Area considred as per approved diagram) |
| 74 | Repairing of Tower Stubs damaged by corrosion and raising of coping of tower legs to prevent from further corrosion |
| 75 | Repairing of damaged stubs including fabrication of stubs, cleats, excavation, breaking of beam RCC portion, Pillar portion upto 0.5 m, recasting and coping of tower. Total stubs to be repaired = 226nos. |
| 76 | RCC work (mufflering) for raising of chimney height to above the beam level to prevent further corrosion of stubs and legs in the propotion 1:2:4 with maximum size of aggregate 12 to 38 mm stone chips providing from work including supply of labour, sand, stone, chips, cement, rods complete as directed. |
| 77 | Stub setting |
| 78 | Setting of stubs (sets of four) including transportation & distribution of stub and accessories from store to site excluding cost of excavation, concreting & back filling |
| 79 | Erection of superstructure |
| 80 | Superstructure erection including transportation of structures by any means and distribution of structure and accessories from store to site |
| 81 | Weilding of all nuts & bolts upto the bottom cross arm level including all charges of transportation, materials etc |
| 82 | Stringing |
| 83 | Stringing of power conductors including transportation from stores and distribution of conductors and accessories to sites and laying, stringing, tensioning , clamping, jointing, jumpering and hoisting of insulators complete including cost of all fittings and accessories not specifically mentioned elsewhere per route Km of line ( 3 conductors of line) |
| 84 | Erection, testing and commissioning of PLCC equipment and related services |
| 85 | Erection, testing and commissioning of CVT including laying of control cables as required |
| 86 | Erection of mounting structures as required for CVT including construction of foundations and supply of all foundation materials |
| 87 | Erection, Testing and Commissioning of 220kV, 05mH, 1250 A line trap with all fittings and accessories as per specification inclusive of all costs of retro-fitting if any and including supply of any materials to complete to job. |
| 88 | Grounding and other works |
| 89 | Grounding of towers with 3 metre long 25mm dia GI pipe including cost of all materials, such as GI pipes, GI bolts & nuts and washers, salt, cock etc as per specification |
| 90 | Painting of tower legs with Anti-rust chemical (Rustolene Spray/Equivalent) with Corrosive paint(2 coats) of approved quality upto 3 meters from the ground level including cost of paints. |
| 91 | Painting of tower legs with bituminous paints of approved quality upto 3 meters from the ground level including cost of paints. |
| 92 | Erection of Danger plates |
| 93 | Erection of Phase plates |
| 94 | Erection of Number plates |
| 95 | Erection of bird guard |
| 96 | Erection of Anti Climbing Device |
| 97 | Corridor clearance work |
| 98 | Repairing/Replacement of missing tower members including fabrication, cutting, making holes and fitting in tower Loc |
| 99 | Carrying of tower members and materials by means of transport from store to site (LS ) |
| 100 | Loading of tower member and materials at store and un-loading near working site |
| 101 | Head loading of tower member/materials from roadside to working site |
| 102 | Dismantling of existing tower and line accessories |
| 103 | Opening and lowering of conductors from the portion of the line to be dismantled and transportation to the store. |
| 104 | Opening and lowering of OPGW wire from the portion of the line to be dismantled and transportation to the store. |
| 105 | Back pulling of OPGW & restringing of 24 fiber OPGW (inclusive of dismantling of tension assembly & suspension assembly) between location no. 530 to 532 & 522-524 |
| 106 | Dismantling of towers without damaging the tower members, transportation to store and proper stacking as per tower Please Enable Macros to View BoQ information |