| 1 | Bridge ProperEarth work in excavation in Soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and techinical specification including setting out dressing of section to correct line level grade & camber and loading into tippers transporting to embankment site within all lifts and lead upto 1000 mtr and utilising the surplus earth locally for road work whenevre required, backfilling the excavation earth to the extent required complete Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per section 300 & all relevant sections/ clauses of Specification for road & bridge work of MoRT &H (5th Revision) & direction of Engineer in charge. |
| 2 | P.C.C. M-15 Grade in foundation bed with formwork using 40mm to 10mm size crushed stone aggregates mixed by concrete mixer, laying in layers and compacting by vibrator & all leads and lifts as per approved Drawing & Technical Specifications and as per Section - 1700 & 2100 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete. |
| 3 | Reinforced cement concrete M-30 grade in different items of Bridge with framework using 20to 10mm size crushed stone aggregates mixed by Batching Plant, laying in layers and compacted by vibration including curing for 14 days as per Section 900, 1500,1700,2100 & all relevant sections/ clauses of MORT&H specifcation and cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect but excluding the cost and conveyance of M.S Rod or TOR steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending ,bindind and tying the grills and placing in proper position and as per specification and direction of the Engineer- in- charge. |
| 4 | Foundation (Abutment & Pier Shaft) |
| 5 | Sub Structure (Abutment & Pier Shaft) |
| 6 | Sub Structure (Wing wall & return Wall) |
| 7 | Sub Structure (Abutment & Pier Cap) |
| 8 | Sub Structure (Dirt wall) |
| 9 | Superstructure (RCC Girder) |
| 10 | Super Structure( Approach slab) |
| 11 | RCC M-40 grade in Pedestal of Bridge with formwork using 20 to 10mm size crushed stone aggregates mixed by Batching Plant, laying in layers and compacting including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Section 1200, 1500 & 1700 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 12 | Supplying, Fitting, Fixing and Placing in position of Elastomeric bearing including cost, conveyance of bearing & labour for fitting fixing etc complete as per approved Drawing & Technical Specifications and Section - 2000 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 13 | Supplying, fitting and placing uncoated HYSD bar reinforcement of primary steel producers such as SAIL/TATA/RINL/JINDAL STEEL/ SHYAM STEELetc. including cutting, bending and binding as per drawing and technical specification as per section 1600, section 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P etc complete in all respect and as per direction of the Engineer- in- charge.. |
| 14 | Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine-grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces not less than 100 C, protruding 1 mm to 4 mm over mastic surface,)Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per section 515 & all relevant sections/ clauses of Specification for road & bridge work of MoRT &H (5th Revision) & direction of Engineer in charge. |
| 15 | Providing & applying tack coat with rapid setting (RS-1) Bitumen Emulsion on prepared surface including cleaning of road surface and spraying tack coat @ 0.20 K.g / Sqm using mechanical means as per Cluse No. 501, 503 and Section 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 16 | Providing and laying Bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per section 508,509 & all relevant sections/ clauses of Specification for road & bridge work of MoRT &H (5th Revision) & direction of Engineer in charge. |
| 17 | Providing. fitting and fixing Strip Seal Expansion joint as per approved drawing and technical specification as per section 2600 of MOSRT&H, Specification for Road and Bridge works (latest revision) Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 18 | Providing Reinforced cement concrete crash barrier of M40 Grade Concrete at the edges of road, approaches to bridge structures and median with HYSD reinforcement conforming to IRC :21 and dowel bars 25mm dia , 450 mm long at expansion joints filled with pre-moulded asphalt filler board keyed to the structure and installed as per design given in the MOST Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per approved drawing and technical specification as per section 900,1500,170, 2300, 2700 & all relevant sections/ clauses of MORT&H Specification for road & bridge works (5th or latest Revision) & as per direction of Engineer in charge. |
| 19 | Supplying & fixing Stainless Steel pipe & supporting plate over crash barrier using 50mm NB MS medium pipe with 8mm thick MS plate vertical and 122mm thick base plate @ 1500mm c/c in position as per approved drawing and technical specifications Clause 808 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 20 | Providing and fixing drainage spouts in deck slab with 1000 mm diameter G.I pipe completed for finished item of work as per approved drawing and techinical specifiations as per section 2700 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & including all cost i.e cost of all materials, all labour, all T&P, etc complete in all respect and as per direction of the Engineer- in- charge. |
| 21 | Plain cement concrete M-20 in CD work of Bridge Proper with crushed stone aggregates 20mm size and mixed , placed in foundation and compacted as per section 900, 1500, 1700, 2100, 2900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th or latest Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 22 | Painting two coats with enamel paint of approved shade including all cost, conveyance of all materials, with all labour, all T&P required for the work etc complete in all respect and as per direction of Engineer - in- charge. |
| 23 | Gravel backing to approns & revetments and providing fliter material using gravel underneath pitching in slope as per approved drawings and techinical specification as per section 2500, 900 of Spectification for Road & Bridge works (5th Revision) and including all cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect and as per direction of Engineer - in- charge. |
| 24 | Rough stone dry packing in aprons revetments stone pitching in slopes and stone packing in boulder apron etc with hard granite stone of size 30 cm and above as per approved drawing and Section 2500, 900 of specifications for road and bridge works of Minister of Road Transfort & Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 25 | Grounting approns and revetments 23cm deep with cement concrete (1:4:8) as per approved drawing and specifications for finished item of work complete in all respect as per direction by the Engineer-in-Charge. |
| 26 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 as per approved Drawing & Technical Specifications and as per Clause -305 of MoRT&H Specifications for Road & Bridge works (5th Revision). including all cost i.e cost of all materials, all labour, all T&P, etc complete in all respect and as per direction of the Engineer- in- charge. |
| 27 | Providing laying of filter media with granular materials/ stone crushed aggregates of 45mm size or as satisfying the requirements laid down in section 900 and 2500 of MoRT&H specification to a thickness not less than 600mm with small size towards the soil and bigger towards the wall and provided over the entire surface behind abutment wing walls return walls to the full height compacted to a firm condition complete as per drawing and technical specification & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 28 | Providing weep holes in brick masonry / plain or RCC /abutment / wing wall , retaining wall/ toe wall with 100mm dia AC pipe extending through the full width of structure with slope of 1V : 20H towards draining face complete as per drawing and technical specification as per Clause - 2706 of MoRT&H Specition for Road & Bridge works (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 29 | Back filling behind abutment wing walls & return wall using sand including cost, conveyance, royality of all materials & cost of all labour etc complete as per approved Drawing & Technical Specifications and Clause -710.1.4 of IRC 78 & Section 2200 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 30 | Road ProperClearing and grubbing road land including uprooting vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per section 200, clause 201 of the MoRT&H Specifications for Road & Bridge works (5th Revision) including all cost i.e cost of all materials, all labour, all T&P etc complete and as per direction of the Engineer- in- charge. |
| 31 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density for embankment construction & Clause 305, section-900 of MoRT&H Specifications for Road & Bridge works (5th Revision) |
| 32 | Earth work in excavation in Soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and techinical specification including setting out dressing of section to correct line level grade & camber and loading into tippers transporting to embankment site within all lifts and lead upto 1000 mtr and utilising the surplus earth locally for road work whenevre required, backfilling the excavation earth to the extent required complete Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per section 300 & all relevant sections/ clauses of Specification for road & bridge work of MoRT &H (5th Revision) & direction of Engineer in charge. |
| 33 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2 and as per clause -305 of MoRT&H Specification for Road & Bridge works (5th Revision) including all cost i.e cost of all materials, all labour, all T&P etc complete and as per direction of the Engineer - in - Charge.. |
| 34 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 as per approved Drawing & Technical Specifications and as per Clause -305 of MoRT&H Specifications for Road & Bridge works (5th Revision). including all cost i.e cost of all materials, all labour, all T&P, etc complete in all respect and as per direction of the Engineer- in- charge. |
| 35 | Providing compacted granular materials in shoulder by using moorum having required P.I. value with sand admixture if required, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density, as per approved Drawing & Technical Specifications and as per Clause - 407 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete. |
| 36 | Construction of Granular sub-base by providing Grading-VI material as per table 400-2, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per Clause 401 of MoRT&H Specifications for Road & Bridge works (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 37 | Providing, laying, spreading & compacting graded stone aggregate to wet mix macadam specification including premixing the material at OMC in mechanical mix plant, carriage of mixed material to site, laying in uniform layers on well prepared surface & compacting to achieve the desired density including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Clause -406 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete.. |
| 38 | Providing & applying primer coat with slow setting (SS-1) Bitumenn Emulsion on prepared surface of granular base includingclearing road surface and spraying primer @ 0.60 Kg / Sqm using mechinical means as per clause 501, 502 and section 900 and all relevant sections/ clauses of the specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 39 | Providing & applying tack coat with rapid setting (RS-1) Bitumen Emulsion on prepared surface including cleaning of road surface and spraying tack coat @ 0.20 K.g / Sqm using mechanical means as per Cluse No. 501, 503 and Section 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 40 | Providing and laying compacted 50 mm thick Bituminous Macadam using VG-30 grade Bitumen and crusher broken hard granite aggregates of specified grading premixed with bitumenous binder @ 3.3 percent of mix and filler transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade and level and alignment rolling with smooth wheeld vibratory and tandom rollers to achieve the desired compaction as per section 500, 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 41 | Providing and laying compacted 25 mm thick Semi Dense Bitminous Concrete using VG-30 grade Bitumen and crusher broken hard granite aggregates of specified grading premixed with bitumenous binder @ 5 percent of mix and filler transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade and level and alignment rolling with smooth wheeld vibratory and tandom rollers to achieve the desired compaction as per section 500, 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 42 | ROAD SAFETY MEASURESProviding retro-reflectorised cautionary, Mandatory and Informatory sign boards as per IRC. 67 made of high intensity grade sheeting vide clause no. 801.3 fixed over aluminium sheeting 1.5mm thick supported on a mild steel angle iron post 75 x 75mm x 6mm size as per approved drawing as per clause no.801.08 of MoRT&H specification and Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 43 | (i)90cm size Equilateral Triangle |
| 44 | (ii) 60cm Circular |
| 45 | (iii) 80cm x 60cm rectangular |
| 46 | (iv) 90cm octagaon |
| 47 | Road marking with Hot applied thermoplastic compound with Reflectorising Glass beads on bituminous surface by providing and laying of hot applied thermoplastic compound 2.5mm thick including Reflectorising glass beads @ 250gms per sqm area thickness of 2.5mm.is exclusive of surface applied glass beads The finished surface to be level uniform and free from streaks and holes as per IRC: 35 and Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 48 | Providing and erecting a \\"W\\" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 |
| 49 | Supplying and fixing 15cm dia and 1.00 M. long guard posts of cement concrete (1:2.4) with hard granite chips including Labour for fixing 15 cm dia and 1 m long R.C.C. guard posts in position 45cm below ground level and including cost of all reinforcement cost of all materials, labour, transportation, taxes, duties, sundries, T&P etc. complete and as per direction of the Engineer- in- charge. |
| 50 | Box CulvertEarth work in excavation in Soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and techinical specification including setting out dressing of section to correct line level grade & camber and loading into tippers transporting to embankment site within all lifts and lead upto 1000 mtr and utilising the surplus earth locally for road work whenevre required, backfilling the excavation earth to the extent required complete Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per section 300 & all relevant sections/ clauses of Specification for road & bridge work of MoRT &H (5th Revision) & direction of Engineer in charge. |
| 51 | Filling foundation and pilnth with sand of approved quality ramming etc complete as per approved drawing and techinical specification as per section 2100 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 52 | P.C.C. M-15 Grade in Levelling course with formwork using 40mm to 10mm size crushed stone aggregates mixed by concrete mixer, laying in layers and compacting by vibrator & all leads and lifts as per approved Drawing & Technical Specifications and as per Section - 1700 & 2100 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete. |
| 53 | P.C.C. M-15 Grade in open foundation, wall with formwork using 40mm to 10mm size crushed stone aggregates mixed by concrete mixer, laying in layers and compacting by vibrator & all leads and lifts as per approved Drawing & Technical Specifications and as per Section - 1700 & 2100 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete. |
| 54 | Reinforced cement concrete M-25 grade compacted by vibration including curing for 14 days as per Section 900, 1500,1700,2100 & all relevant sections/ clauses of MORT&H specifcation and cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect but excluding the cost and conveyance of M.S Rod or TOR steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending ,bindind and tying the grills and placing in proper position and as per specification and direction of the Engineer- in- charge. |
| 55 | Foundation |
| 56 | Sub Structure |
| 57 | Super structure |
| 58 | Supplying, fitting and placing uncoated HYSD bar reinforcement of primary steel producers such as SAIL/TATA/RINL/JINDAL STEEL/ SHYAM STEELetc. including cutting, bending and binding as per drawing and technical specification as per section 1600, section 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P etc complete in all respect and as per direction of the Engineer- in- charge.. |
| 59 | Providing laying of filter media with granular materials/ stone crushed aggregates of 45mm size or as satisfying the requirements laid down in section 900 and 2500 of MoRT&H specification to a thickness not less than 600mm with small size towards the soil and bigger towards the wall and provided over the entire surface behind abutment wing walls return walls to the full height compacted to a firm condition complete as per drawing and technical specification & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 60 | Providing Reinforced cement concrete crash barrier of M40 Grade Concrete at the edges of road, approaches to bridge structures and median with HYSD reinforcement conforming to IRC :21 and dowel bars 25mm dia , 450 mm long at expansion joints filled with pre-moulded asphalt filler board keyed to the structure and installed as per design given in the MOST Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per approved drawing and technical specification as per section 900,1500,170, 2300, 2700 & all relevant sections/ clauses of MORT&H Specification for road & bridge works (5th or latest Revision) & as per direction of Engineer in charge. |
| 61 | Gravel backing to approns & revetments and providing fliter material using gravel underneath pitching in slope as per approved drawings and techinical specification as per section 2500, 900 of Spectification for Road & Bridge works (5th Revision) and including all cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect and as per direction of Engineer - in- charge. |
| 62 | Rough stone dry packing in aprons revetments stone pitching in slopes and stone packing in boulder apron etc with hard granite stone of size 30 cm and above as per approved drawing and Section 2500, 900 of specifications for road and bridge works of Minister of Road Transfort & Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 63 | Providing weep holes in brick masonry / plain or RCC /abutment / wing wall , retaining wall/ toe wall with 100mm dia AC pipe extending through the full width of structure with slope of 1V : 20H towards draining face complete as per drawing and technical specification as per Clause - 2706 of MoRT&H Specition for Road & Bridge works (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 64 | Reinforced cement concrete M-30 (Wearing coat) compacted by vibration including curing for 14 days as per Section No.900,1500,1600,1700, 2300, 2700 & all relevant sections/ clauses of MORT&H specifcation and cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect including the cost and conveyance of M.S Rod or TOR steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending ,bindind and tying the grills and placing in proper position and as per specification and direction of the Engineer- in- charge. Box Culvert |
| 65 | Providing and fixing drainage spouts in deck slab with 1000 mm diameter G.I pipe completed for finished item of work as per approved drawing and techinical specifiations as per section 2700 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & including all cost i.e cost of all materials, all labour, all T&P, etc complete in all respect and as per direction of the Engineer- in- charge. |
| 66 | Painting two coats with enamel paint of approved shade including all cost, conveyance of all materials, with all labour, all T&P required for the work etc complete in all respect and as per direction of Engineer - in- charge. |
| 67 | Protection WorkEarth work in excavation in Soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and techinical specification including setting out dressing of section to correct line level grade & camber and loading into tippers transporting to embankment site within all lifts and lead upto 1000 mtr and utilising the surplus earth locally for road work whenevre required, backfilling the excavation earth to the extent required complete Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per section 300 & all relevant sections/ clauses of Specification for road & bridge work of MoRT &H (5th Revision) & direction of Engineer in charge. |
| 68 | Toe Wall 1.5 m Height above G.L |
| 69 | Retaining wall 3.5m Height above G.L |
| 70 | Filling foundation and pilnth with sand of approved quality ramming etc complete as per approved drawing and techinical specification as per section 2100 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 71 | Toe Wall 1.5 m Height above G.L |
| 72 | Retaining wall 3.5m Height above G.L |
| 73 | P.C.C. M-15 Grade in Levelling course with formwork using 40mm to 10mm size crushed stone aggregates mixed by concrete mixer, laying in layers and compacting by vibrator & all leads and lifts as per approved Drawing & Technical Specifications and as per Section - 1700 & 2100 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete. |
| 74 | Toe Wall 1.5 m Height above G.L(Foundation) |
| 75 | Toe Wall 1.5 m Height above G.L (in substructure) |
| 76 | Retaining wall 3.5m Height above G.L |
| 77 | RCC M-30 grade in different items of Bridge with formwork using 20 to 10mm size crushed stone aggregates mixed by Batching Plant, laying in layers and compacting including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Section 1500, 1700 & 2100 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 78 | RCC Retaining Wall 3.5 m Height above G.L (Foundation) |
| 79 | RCC Retaining Wall 3.5 m Height above G.L (substructure) |
| 80 | Providing laying of filter media with granular materials/ stone crushed aggregates of 45mm size or as satisfying the requirements laid down in section 900 and 2500 of MoRT&H specification to a thickness not less than 600mm with small size towards the soil and bigger towards the wall and provided over the entire surface behind abutment wing walls return walls to the full height compacted to a firm condition complete as per drawing and technical specification & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 81 | Supplying, fitting and placing uncoated HYSD bar reinforcement of primary steel producers such as SAIL/TATA/RINL/JINDAL STEEL/ SHYAM STEELetc. including cutting, bending and binding as per drawing and technical specification as per section 1600, section 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P etc complete in all respect and as per direction of the Engineer- in- charge..Retaining wall 3.5m Height above G.L |
| 82 | Providing weep holes in brick masonry / plain or RCC /abutment / wing wall , retaining wall/ toe wall with 100mm dia AC pipe extending through the full width of structure with slope of 1V : 20H towards draining face complete as per drawing and technical specification as per Clause - 2706 of MoRT&H Specition for Road & Bridge works (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. |
| 83 | Toe Wall 1.5 m Height above G.L |
| 84 | Retaining wall 3.5m Height above G.L Please Enable Macros to View BoQ information |