| 1 | Excavation of foundation in hard soil within 50 m initial lead and 1.5 m initial lift including rough dressing and levelling as per the direction of engineer in charge |
| 2 | Filling foundation and plinth with sand well watered and rammed including cost and conveyance of materials. |
| 3 | C.C.(1:4:8) with 4 c.m. size h.g. metal in F&P. |
| 4 | Cement Concrete(1:2:4)with 12 mm size Hard Granite Chips |
| 5 | 15 cm deep brick coping 23cm to 25cm thick walls including plastering (1:4) complete. |
| 6 | R. R. H.G. stone masonry in C.M. (1: 6) in foundation and plinth works |
| 7 | Filling in foundation and plinth with excavated materials including watering and ramming |
| 8 | Brick work with FLY ASH bricks inC.M(1:6) in Super structure in Ground Floor |
| 9 | RCC Work M-20 grade with 20 mm and down grade HG chips (CB) including hoisting,lowering & laying concrete and compacting by using vibrator ramming for ground floor |
| 10 | (a) Column base, frustum, plinth band |
| 11 | (c) Column and beam |
| 12 | Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification in ground floor |
| 13 | 6mm thick cement plaster in C.M(1:4)R CC surfaces for ground floor |
| 14 | 20mm thick cement plaster in C.M(1:6) over stone work |
| 15 | 16 mm thick cement plaster in c.m(1:6) over brick masonry, inside walls in ground floor |
| 16 | 12 mm thick cement plaster in c.m(1:6) over brick masonry, out side walls ground floor |
| 17 | Cement washing two coats |
| 18 | Finishing walls withweather coat paint of approved shade two coat to give an even shade including cost of paint in ground floor |
| 19 | Supply, fitting and fixing of MS grill and ventilators including painting two coats over a coat of primer including cost of transportation. |
| 20 | Priming one coat with any approved red oxide over steel work |
| 21 | Painting 2coats with any approved iron paint on new iron work. |
| 22 | Excavation,loading,unloading and carriage by mechanical means of all kinds of soil,including stoney earth,gravels and moorum etc interspread with boulders up to .5cum size with all lifts and delifts including trimming of the slopes and bed to design section and depositing the excavated materials away from the work site as per specification and as directed by the E-I-C within an initial lead of 1 km from the place of excavation complete |
| 23 | Transportation of earth from 5.0Km lead including Royalty of Earth |
| 24 | Ramming or rolling eath work with light H.R.R. in embankment in layers not exceeding 0.3m |
| 25 | Filling bitumen and cement and jute fibre in expansion joints inclusive of cost of materials, bitumen and cement proportion (3:1) including cleaning before pouring 12mm to 25mm and 15cm depth Please Enable Macros to View BoQ information |