| 1 | E/W in excavation for structures as per drawing and technical specifications Clause 305.1 including dressing of sides and bottom and back filling in trenches with excavated suitable material |
| 2 | Providing and laying concrete for plain/reinforced concrete M10 (1:3:6) open foundations complete as per drawings and technical specifications clause 802,803,1202&1203 |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. (Under Floor) as per |
| 4 | Brick masonry work in 1:4 cement and course sand mortar in foundation complete excluding pinting & plastering as per drawing and tchnicla specifications clause 600,1202 1203 |
| 5 | Construction of gramular sub base by providing well graded Material Sprddeing in Uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 6 | Providing, laying, spreading and compacting stone aggregates of 53mm to 22.4mm sizes (Crusher broken) to water bound macadam (WBM III) specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.(WBM III) |
| 7 | Provoiding and laying of Rubber moulded Zig Zag interlocking concrete block pavements Grade M-30 having thickness 80mm including leveling and dressing of surface3 to required level and slope, spreading and moisting 30mm thick local sand on bed, filling joints with local sand eyc as per technical specification clause 1504 |
| 8 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802,803,1202 & 1203 |
| 9 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802,803,1202 & 1203 |
| 10 | Plastering with cement mortar (1:4 ) 15mm thick on brick work in substructure as per technical specification Clause 613.4 & 1204 |
| 11 | Providing and laying 350 mm dia NP3 RCC hume pipe on first class bedding of granular material in single row i/c fixing collar with cement mortar 1:2 in all complete MORD 1100 |
| 12 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawing and technical specifications Clause 1000 and 1202 |
| 13 | Supply of informatory MS Sign Board i/c all supply all labour material and painting & writing T&P etc all complete work |
| 14 | As per order of Joint Secretary G.O No G. 1877Dated 21-02-2025 and Director cum chiefEngineer U.P. RED Lucknow Letter no 801 dated 03-03-2025 Deduction 5% for Competitive Price Efficiency. Please Enable Macros to View BoQ information |