| 1 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.(a) Depth up to 150 mm. |
| 2 | Granular Sub-base with Graded Material(Table:- 400-1) B. By Mix in Place Method :Construction of granular sub-base by providing graded material, mixing by mix in placemethod with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).A. For Grading -i |
| 3 | Excavation for Structures Earth work in excavation of foundation of structuresnas per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge .In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means.a) upto 3 m depth(i) With pumping out water including shoringas required. |
| 4 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. |
| 5 | Ordinary Cement concrete (mix 1:2:4) with graded stonechips (20 mm nominal size) excluding shuttering andreinforcement if any, in ground floor as per relevant IS codes (i) Pakur Variety |
| 6 | First class Brick work in cement sand mortar in steining of well, pier, abutment, wing wall, parapets cross drain. H.P. culverts, guard wall etc. including curing, scaffolding, raking out joints etc. complete including cost and carriage of all materials.(a) In 1:4 proportion. |
| 7 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface].(ii) With 1:4 cement mortar(a) 20 mm thick plaster |
| 8 | Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m |
| 9 | Ordinary Cement concrete (mix 1:1.5:3) with graded stonechips (20 mm nominal size) excluding shuttering andreinforcement if any, in ground floor as per relevant IS codes (i) Pakur Variety |
| 10 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. |
| 11 | Supplying, fitting and placing HYSD bar reinforcement in Sub-structure including initialstraightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size andconforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and directionof Engineer-in-charge. Tor steel road / HYSD bars/ TMT bars ( JSW/JSPL / SHYAM/SRMB/SSL/BMASL/ELECTRO STEEL)( Fe415/Fe500/Fe500D) conforms to IS -1786) |
| 12 | Wet Mix Macadam Base Course: Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and lubricants, including incidental costs for lighting, guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). |
| 13 | Supplying and Laying in the specified pattern of Interlocking Concrete Block Pavements (ICBP) with concrete blocks (with graded as specified as per Table 1 of IS 15658:2006) manufactured in steel mould clamped to a vibrating table by hydraulic pressure (as per cl. 6.30 of IRC:SP:63 (2018),from BIS licensee manufacturer,with spacer nib (Small protruding profiles on the vertical face of a paver block used as device for keeping minimum joint gap in between the paving blocks,as per CL. No.3.26 of IS:15658) and of specified size and shape with aspect ratio (The ratio of length to the thickness of a paver block,as per Cl.No.3.3 of IS: 15658) as per Table 2 of IS : 15658 with flectural strength/breaking load as per Annexure G of IS:15658, on the prescribed base course of specified CBR as per Table 1 of IRC SP 63 (2018) or else as mentioned in design and drawing with cushion of compacted bedding sand of 25-35 mm thick (grading the bedding sand as per clause 6.5.1 of IRC SP-63) and filling up the gaps in between paver blocks with joint filling sand (the grading of the joint filling sand will be as per clause 6.5.2 of IRC SP-63) and completing the edge with cut blocks as per Cl. No.8.7 of IRC SP-63 (2018) with proper confinement of bedding and joint filling sand, compaction,levelling and filling up of the edge gaps. 80 mm thick. Grey. |
| 14 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge. |
| 15 | Road Marking with Hot Applied Thermoplasticb Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes complete as per Clause 803 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). |
| 16 | Add Labour welfare cess @ 1% on Rs. 5519837.69 i.e. Total amount over Item No. 01 to 15 |
| 17 | Add GST @ 18% on Rs. 5575036.07 i.e. Total amount over Item No. 01 to 16 Please Enable Macros to View BoQ information |