|
| 1 | Code No.2.28.1 Surface dressing of the ground including removing vegetation and in - equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50m and lift upto 1.5m - all kinds of soil |
| 2 | NSR 60 Providing and laying of unscreened gravel boulders including conveyance of unscreened gravel boulders to work site from approved quarry and stacking to the departmental gauge for pre measurement, spreading, hand packing, to the required camber and gradient, watering and consolidation by power roller rolling all as directed by the Engineer-in-Charge. The rate shall include cost of Unscreened Gravel boulders and water, labour charges for stacking, spreading, hand packing and watering, hire and fuel charges for power roller and all other tools and plants employed etc., complete. The volume of stacks calculated as per actual measurement shall be reduced by 15% for looseness in stacking to arrive at the net quantity |
| 3 | Code No.4.91.1B Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth three wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite Crushable type such as moorum/gravel for screening and gravel for binding to fill up the interstices of coarse aggregate, watering and compacting to the required density - by mechanical means - Water bound macadam Gr-I with Gravel screening. (As per MoRTH specification, 4th Revision) |
| 4 | Code No. 4.92.1C Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite Crushable type such as moorum or gravel for screening and gravel for binding to fill up the interstices of coarse aggregate, watering and compacting to the required density - by mechanicall means - Water bound macadam Gr-II with moorum or gravel screening. (As per MoRTH specification, 4th Revision) |
| 5 | Code No. 4.12A Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density - Using vibratory roller. (As per MoRTH specification, 4th Revision) |
| 6 | Code No.5.1 Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. (As per MoRTH specification, 4th Revision) |
| 7 | Code No.5.2 Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg. per sqm. on the prepared bituminous / granular surface cleaned with mechanical broom. (As per MoRTH specification, 4th Revision) |
| 8 | Code No.5.3A Providing and laying bituminous macadam with hot mix plant of capacity not less than 40 to 60 TPH using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 507.7 of MoRTH specification, 4th Revision, to achieve the desired compaction.- Using grade I metal and bitumen - VG30 |
| 9 | Code No.5.7A Providing and laying semi-dense bituminous concrete with HMP of capacity not less than 40 - 60 TPH using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 508 of MoRTH specification, 4th Revision, complete in all respects - Using grade-I material and bitumen- VG30 Please Enable Macros to View BoQ information |