| 1 | Cutting trees beyond 30cm but upto and incl. 60cm girth, cutting branches, removing root completely and stacking (where space for falling trees is not enough). |
| 2 | Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon |
| 3 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 4 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
| 5 | Providing Stay for LT poles incl. digging & back filling pit. |
| 6 | Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. |
| 7 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc. |
| 8 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |
| 9 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 10 | Additional rate for providing one disc set on any type of HT pole for making cut point. |
| 11 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. |
| 12 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. |
| 13 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 14 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 15 | Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 16 | Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 17 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 18 | Fitting and erecting one HT PSC DP, fitting all accessories (2 stays, 8 cross arms, AB, DO, LA etc.), mounting of 100kVA Transformer, fixing DB, DTR box and giving all HT & LT connections. |
| 19 | Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line. |
| 20 | Fitting one additional HT pin with insulator |
| 21 | Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole. |
| 22 | Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 23 | Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls. |
| 24 | Dismantling one damaged 11kV A type pole after disconnecting stays, strut etc. and stacking the same. |
| 25 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 26 | Cutting trees beyond 30cm but upto and incl. 60cm girth, cutting of trunks/branches, removing the root completely and stacking. |
| 27 | Cutting trees beyond 120cm but upto and incl. 180cm girth, cutting of trunks/branches, removing the root completely and stacking. |
| 28 | Cutting trees beyond 60cm but upto and incl. 120cm girth, cutting of trunks/branches, removing the root completely and stacking. |
| 29 | Cutting trees beyond 60cm but upto and incl. 120cm girth, cutting branches, removing root completely and stacking (where space for falling trees is not enough). |
| 30 | Cutting trees beyond 120cm but upto and incl. 180cm girth, cutting branches, removing root completely and stacking (where space for falling trees is not enough). |
| 31 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). |
| 32 | Providing Transformer fencing , using 50x50x6mm Angle iron, 40 x 6 mm MS flat and 8 mm MS rod as specified, incl cost of transportation & foundation |
| 33 | Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling |
| 34 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 35 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 36 | Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking. |
| 37 | Providing Strut using LT PSC pole incl. digging & back filling pit. |
| 38 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 39 | Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 40 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. |
| 41 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 42 | Providing one Driven Earth using GI earth pipe at standard distance away from the pole/structure in loose soil. |
| 43 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 44 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 45 | Erection of suspension clamp for LT ABC of any size |
| 46 | Dismantling one section fuse |
| 47 | Providing Cable Tie |
| 48 | Providing End Caps |
| 49 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 50 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm |
| 51 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 52 | Loading LT PSC pole to Hand cart from the stacking place and unloading the same at work site. |
| 53 | Transporting one LT PSC pole by Hand cart - limited to 4km (excluding loading and unloading). |
| 54 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 55 | Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 56 | Erecting one LT PSC Pole in position incl. digging & back filling pit. |
| 57 | Straightening one Slanted LT pole after unbinding the line and rebinding the line after work. |
| 58 | Renewal of existing damaged/broken old LT stay with existing stay rod. |
| 59 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. Please Enable Macros to View BoQ information |