| 1 | SUPPLY, FABRICATION, PAINTING and ERECTION of MS SHUTTER and HOISTING BRIDGE and MECHANISM |
| 2 | OD31319/2025-2026:CUTTING, REMOVING, LIFTING, LEADING and STACKING drifted wooden logs from the check dam to a convenient location. |
| 3 | OD30113/2025-2026:Dismantling of the Canal Shutter ( up to 2 Tonne weight ) /Hoisting unit / Embedded parts etc. of the same and stacking of a distance of 100 meter including hire of machinery, labour etc complete as directed by the deptl. officer at the site (Weight of the unserviceable shutters and embedded parts may be calculated as 60% and unserviceable hoisting units as 80%)-(CANAL GATE 4-16) |
| 4 | OD30117/2025-2026:Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges(#) |
| 5 | OD30116/2025-2026:Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges.(#) |
| 6 | OD30115/2025-2026:Supply of MS round bar including cost of conveyance charges. (#) |
| 7 | OD30114/2025-2026:Supply of bolt and nut up to 300 mm length including cost of conveyance.(#) |
| 8 | OD31363/2025-2026:FABRICATION and ERECTION of EMBEDDED PARTS of CANAL SHUTTERS ( upto 2 tonne weight) and accessories as per approved specifications, drawings and directions of deptl. officer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied-(CANAL GATE 1-16) |
| 9 | OD30335/2025-2026:Fabrication and supply of Structural steel canal shutters ( Up to 2 tonne weight ) /Hoisting Bridge /Platform and accessories etc. for the same as per approved specifications, drawings and directions of deptl fficer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied |
| 10 | 85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site |
| 11 | 85.115:Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site |
| 12 | OD30338/2025-2026:Providing EN-8 (Dia 63 mm) screw rod 7.50 tonne capacity 4.00 m lift screw hoist having one number of EN-8 screw shaft having a lifting speed of around 5.00 cm/min for 24 rpm of hand operation including cost of all materials, labour, hire charges and conveyance (CANAL GATE 14-16) |
| 13 | OD30337/2025-2026:SUPPLYING and APPLYING GREASE on NEW SCREW ROD for CANAL GATE.(#) |
| 14 | OD54679/2025-2026:Providing of WORM & PINION having a lifting speed of around 5.00 cm/min for hand operation. having gearbox wall thickness of 12mm for side, 16mm for top and 24mm base. Top plate fixed with minimum 8 nos of M12 bolt , including cost of Mechanical stoper, Locking arrangement, Operating handle and all other materials, labour, hire charges and conveyance. |
| 15 | OD30371/2025-2026:THREAD LESS portion of the screw rod Dia 67mm (per metre rate).(#) |
| 16 | OD30336/2025-2026:ERECTION of the CANAL SHUTTER ( up to 2 tonne weight) /hoisting bridge / platform including handrails , ladder etc. for the same including alignment correcting and setting complete including cost of all labour, machinery, incidental and conveyance , lead and lift charges etc complete but excluding cost of materials already supplied-(CANAL GATE 3-16) |
| 17 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. |
| 18 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts |
| 19 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 20 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 21 | OD31375/2025-2026:Drilling hole on dam structure dia 24 mm, 150mm depth without damage existing dam structure and cleaning the hole for preparation of Chemical Anchor. Including cost of all materials, labour charges, energy charges, hire charges etc.complete. As per the instructions from the deptl officals.(#) |
| 22 | OD31377/2025-2026:Anchoring the MS/SS rebars into the drilled hole using CHEMICAL ADHESIVES, including cost of hire charge of machine, cost of chemical adhesive and labour.(#) Please Enable Macros to View BoQ information |