| 1 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. |
| 3 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. |
| 5 | Providing and applying primer coat with bitumen emulsion (SS-1) grade on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. |
| 6 | Providing and applying tack coat with bitumen (VG-10) using bitumen distributor at the rate of 0.25 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. |
| 7 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness by manual means composed of 13.2 mm to 5.6 mm aggregates using VG-10 Grade Bitumen bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat as per Technical Specification Clause 508.. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. |
| 8 | Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. |
| 9 | S.O.B. brick on edge pavement on patries with bricks laid by dry joints filled with local sand including preparation of base to required slope and its ramming, spreading in layers of 3/8\\" depth of local sand over the subgrade and including the supply of all materials, labour and T&P etc. required for proper completion of work. (Ch. no. 20, S.no. 763). Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. |
| 10 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 ), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. |
| 11 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. |
| 12 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I.P.C.C grade M 10 (i)Nominal mix 1:3:6. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. |
| 13 | RCC Grade M25 in FoundationProviding concrete for reinforced concrete in open foundations complete of grade M25 as per drawings and technical specifications Clause 800, & 1200. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. |
| 14 | HYSD in FoundationSupplying, fitting and placing HYSD bar reinforcement (Fe 415) in foundation complete as per drawings and technical specifications Clauses 1000 and 1200. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. |
| 15 | M-150 class brick work in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. (Chap. 6, S.No. 307). Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. |
| 16 | 12 mm thick plaster with 1 part of cement and 3 part ofcoarse sand over brick work including supply of all materials, labour and T&P etc. required for proper completion of work. (Chap. 13, S.No. 583). Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. |
| 17 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 III.P.C.C. grade M 20 (i)Nominal mix (1:2:4). Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. |
| 18 | Providing and Laying Reinforced cement concrete pipe NP3 (1000 mm dia) for culverts on First Class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry work in head walls and parapets. Clause 1106.. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. |
| 19 | Routine Maintenance of road after completion work (A) Carriageway/Pavement: (a) Potholes,cracks,other surface defects (SWMM & BC), (b) Repair of Edges, Rutting (BC). (B) Road, Embankment, Cuttings, Shoulders, Trees & Plantation: (a) Roads Maintained free of edge drop, inadequate cross fall, undulations, settlement, Ponding (E/W), (b) Deficient slopes, rain cuts in embankments (E/W), (c) Vegetation growth, Loping of tree branches. (C) Bridges and Culverts: (a) De-silting, (b) Clearing vegetation growth (Jungle Clearance), (c) Damaged/disturbed boulder pitching, breast /toe wall retaining wall, apron flooring , guide bunds (Boulder Apron), (d) Parapet, any damage to foundations, (e) Any defects in sub-structures, (f) Any defects in superstructures, raillings, parapets., (g) wearing coat, (h) Approach slab, (i) Painting & lettering of No. plates, repairs. (D) Repair of Roadside Drains: (a) Brick Work in 1:4, (b) Plaster, (c) CC-1:2:4. (E) Road Furniture: (a) Cleaning, Painting & lettering of stones & sign boards, Replacement of damaged/ missing stones & sign boards., (b) 200 m stones, (c) Km stones, (d) 5th km stones,. Maintenance requirement as per above and Mentioned in Special Conditions of Contract for Maintenance.Payment of Maintenance work as Percentage of final Civil Construction Cost. |
| 20 | For Ist Year @ 0.00 % for Bituminous (PC) road |
| 21 | For IInd Year @ 1.50 % for Bituminous (PC) road |
| 22 | For IIIrd Year @ 3.00 % for Bituminous (PC) road |
| 23 | For IVth Year @ 4.50 % for Bituminous (PC) road |
| 24 | For Vth Year @ 6.00 % for Bituminous (PC) road |
| 25 | For Ist Year @ 0.00 % for Cement Concrete road |
| 26 | For IInd Year @ 0.25 % for Cement Concrete road |
| 27 | For IIIrd Year @ 0.50 % for Cement Concrete road |
| 28 | For IVth Year @ 0.75 % for Cement Concrete road |
| 29 | For Vth Year @ 1.00 % for Cement Concrete road Please Enable Macros to View BoQ information |