| 1 | Part 1: Providing Pipeline with FHTC in East street at Pottampatty H/O Kanakkanpatty (50 FHTC)Estimate Amount: Rs.4.50 Lakhs |
| 2 | Dismantling and removing the damage P.C.C concrete portion including all labour charges and all other incidental charges etc., complete. |
| 3 | 63mm PVC Pipe |
| 4 | 63mm PVC Bend |
| 5 | 63mm PVC Elbow |
| 6 | 63mm PVC Gate valave |
| 7 | Solvent cement |
| 8 | Earthwork excavation in hard stiff clay and hard rock earth and pipe laying, jointing and refilling the trench with excavation soils etc.., complete For Water line |
| 9 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. |
| 10 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. |
| 11 | Supply of 63mm x 20mm dia PVC Saddle piece |
| 12 | Supply of 20mm GI B Class Pipe |
| 13 | Supply of 20mm GI Coupling |
| 14 | Supply of 20mm Brass tap |
| 15 | Supply of 20mm GI Elbow |
| 16 | Labour Chargers for 20mm dia GI pipe Cutting |
| 17 | Labour Chargers for 20mm dia GI pipe threading |
| 18 | Supply of 20mm dia GM Flow control valve |
| 19 | Supply of 20mm dia Brass ferrule |
| 20 | Supply of 20mm dia PVC pipe 10kg/sq.cm |
| 21 | Supply of 20mm dia PVC MTA/FTA |
| 22 | Supply of 20mm dia PVC Bend |
| 23 | Earthwork excavation in hard stiff clay and hard rock earth and pipe laying, jointing and refilling the trench with excavation soils etc.., complete For FHTC |
| 24 | Laying of G.I. Pipes and specials to proper line and level including jointing but excluding cost of pipes and jointing materials for plumbing works for providing water supply and sanitary works in the premises of the street as per standared specifications etc., (6 mm to 32 mm dia) |
| 25 | Provision for Name board charges |
| 26 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} |
| 27 | Part 2: Providing Pipeline with FHTC in North street at Pottampatty H/O Kanakkanpatty (50 FHTC)Estimate Amount: Rs.4.40 Lakhs |
| 28 | Dismantling and removing the damage P.C.C concrete portion including all labour charges and all other incidental charges etc., complete. |
| 29 | 63mm PVC Pipe |
| 30 | 63mm PVC Bend |
| 31 | 63mm PVC Elbow |
| 32 | 63mm PVC Gate valave |
| 33 | Solvent cement |
| 34 | Earthwork excavation in hard stiff clay and hard rock earth and pipe laying, jointing and refilling the trench with excavation soils etc.., complete For Water line |
| 35 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. |
| 36 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. |
| 37 | Supply of 63mm x 20mm dia PVC Saddle piece |
| 38 | Supply of 20mm GI B Class Pipe |
| 39 | Supply of 20mm GI Coupling |
| 40 | Supply of 20mm Brass tap |
| 41 | Supply of 20mm GI Elbow |
| 42 | Labour Chargers for 20mm dia GI pipe Cutting |
| 43 | Labour Chargers for 20mm dia GI pipe threading |
| 44 | Supply of 20mm dia GM Flow control valve |
| 45 | Supply of 20mm dia Brass ferrule |
| 46 | Supply of 20mm dia PVC pipe 10kg/sq.cm |
| 47 | Supply of 20mm dia PVC MTA/FTA |
| 48 | Supply of 20mm dia PVC Bend |
| 49 | Earthwork excavation in hard stiff clay and hard rock earth and pipe laying, jointing and refilling the trench with excavation soils etc.., complete For FHTC |
| 50 | Laying of G.I. Pipes and specials to proper line and level including jointing but excluding cost of pipes and jointing materials for plumbing works for providing water supply and sanitary works in the premises of the street as per standared specifications etc., (6 mm to 32 mm dia) |
| 51 | Provision for Name board charges |
| 52 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |