| 1 | Carrying CI/DI pipes with specials and valves and lowering placing in position and laying carefully inside the trenches in proper alignment and gradient etc. including earth work in excavation of adequate width as per specification having min. clean cover from top of pipes is 1.10 mtr. below existing grond level in any kind of soil including mixed with boulder, road sub-grade and its flank, but excluding moorum and laterite and stone etc.without damaging the existing telephone/electric cable etc.(in case of damaged if any type of cable line during execution, necessary damaged charges as applicable by the respective authority will be borne by the agency in his own cost) preparing the bottom surface for continious bedding of pipe line and laying pipes, fittings, fixing specials and valves from local deptt. stone within 8 KM and back filling the trenches with excavated earth in layers to original condition as per specification and direction of EIC. The surplus materials after execution of work are to be return to the deptt. store. .........N.B: i) Any deviation from required clear cover of 1.10 mtrt., due to site adverse condition, prior permission is to be obtained from the EIC in exceptional situation and payment will be made on prorate basis over the rate of entire item ...ii) No payment will be made without hydraulic test of the pipe line either part or full. i) 100 mm dia 1 X 1000 |
| 2 | ii) 150 mm dia 1 x 1000 |
| 3 | ADDENDUNM NO.-05/2022 DATED-21.06.2022. Supply and delivery (at site) of DI pipes conforming to IS: 8329:2000.i) 100 mm dia 1 X 1500 |
| 4 | ii) 150 mm dia 1 x 1500 |
| 5 | P-L-15, Item No.-5 of PHED SOR, 2019 ….Making rubber gasket joint to CI/DI pipes maintaining proper alignment level etc, by mechanical arrangement with or without using mobile cranes where necessary and with help of all other equipments tools and tackles etc. as required providing lubricants of approved quality and direction of EIC.(Rubber gasket will be supplied deptt. free of cost) i) 100 mm dia |
| 6 | ii) 150 mm dia |
| 7 | Making flange joint to DI/CI pipes, specials and valves where necessary with supply of required rubber insertion and nut bolts, washers etc of approved quality and type all complete as per specification and direction of EIC ( Nut and bolts shall be of TATA/GKW RATE) i) 100 mm dia pipe |
| 8 | ii) 150 mm dia pipe |
| 9 | P-L.- 17 It no.- 7 of PHED SOR, 2019 .. Cutting DI pipe ( all class & type) to required length with cutting device etc. and grinding the cutting portion with file as per direction and satisfaction of EIC.a) 80 mm dia to 125 mm dia pipe |
| 10 | b) 150 mm dia to 200 mm dia pipe |
| 11 | P-L-17 It no.-8 of PHED SOR, 2019 Chamfering the spigot end of all type/class of DI Pipe for proper using of push joint by means of grinder set for proper joint etc. all complete as per direction of EIC.i) 100 mm dia |
| 12 | ii) 150 mm dia |
| 13 | P.L-18 It no.-9 of PHED SOR, 2019 Filling the pipe line with water, testng hydraulically as per I.S 3114- 1965 ( Article-6) in section of a length not exceeding 500 mtr. For head of pressure as per specification including supplying installing and fixing all equipments such as diesel pump set, blank flange, pressure gauge, valve, pressure pump and all other tools and tackles including drilling topping and plugging of necessary holes to pipes, blocking ends providing temporary thust block and subsequent blocking of holes and other jointing materials and dismantling and removal of the same including disposal of water etc. all complete as per specification and direction of EIC. The rate is inclusive of cost of requisite of cost of requisite water to be arranged by the contractor (Recovery rate of water @ Rs, 10.00/m3, if contractor used water from deptt, source).A) For CI/DI pipei) 100 mm dia 1 X 1500 |
| 14 | ii) 150 mm dia 1 X 1500 |
| 15 | P-L-19 It no.- 10 of PHED SOR, 2019 Cleaning thoroughly the inner surface of pipe line including specials and valve by flushing with water and subsequently disinfested of the same pipe line by flushing again with water containing bleaching powder resulting in residual chlorine not less than 15mg/ltrs. after 24 hrs. of such filling including laboratory testing of water samples obtain from the disinfested pipe line and daisposal of water from the pipe line after completion of the work. The rates including of cost of requisite water to be arranged by the contractor. ( The rate of water @ Rs,10.00/m3 may be recovered if the contractor used water from deptt. soaurce)A) For CI/DI pipei) 100 mm dia. 1 X 1200 |
| 16 | ii) 150 mm dia. 1 X 1200 |
| 17 | P-L-21 It no.-11 of PHED SOR, 2019 Submission of complete detailed drawing of distribution system, rising main etc. after execution of work showing position of different types of valves,fittings/specials sluice valve chamber with location, node to node wise in the sanctioned drawing as completion drawing of the water supply scheme as per direction andsatisfaction of EIC. The list of dia wise fitting/specials, different pipes of valve used in the rising main should be shown in the completion drawing (not seperate) with verified by SAE & AE in charge of the scheme. The above drawing will be submitted in 5 copies. |
| 18 | P-L-21 It no.-12 of PHED SOR, Bituminous pucca road (approx. 450 mm depth) cutting by using gaiti, chisel, hammer etc. and picking up the withdrawing excavation materials and remove the same within distance of 30 mtr. at least all complete for fixing/crossing all dia of pipe line as per direction of EIC |
| 19 | Ref. Item 2 (a), page-10, PWD SOR Vol-I Dismantling all type of plain cement concrete works, stacking serviceable materials of site and removing rubbish as directed within alead of 75 mtr. for laying all dia pipe line in ground floor, upto 150 mm thick. |
| 20 | P-OH-15 It no.-59 of PHED SOR. 2019 Supply and delvery of CIDF sluice valve (Special type) PW-1.00 of different dia make with CI double flanged non rusting spindle sluice valves conforming to IS14846 - 2000 with latest emended having body dome/bonnet and cover of C.I. Gr-F.G 210 mtr. spindle of IS: 318 LTB-2 flange and drilled to IS: 1538 Part IV & VI valves are suitable for max. working pressure of 10 kg/cm2. N.B: The above item should be procured from the reputed manufactures as per deptt. approved vendor lista) 100 mm dia. PN 1.0 |
| 21 | b) 150 mm dia. PN 1.0 |
| 22 | P-L-21 It no.-14 of PHED SOR, 2019 Construction of different dia Sluice valve/Air valve/Washout chamber in different sizes for village road where light run and for main road where heavy traffic run as deptt. approved drawing with 25 cm thick brick work (1:6) over cement concrete (4:2:1) over a single B/F soling over 150 mm thick slab on top of chamber with RCC (1:1.5:3) cover slab with necessary opening for operation of valve all complete including cost of labour & materials as per Deptt. Dwg. [Reinforcement type:- Other manufacturers not specified] i) 80 mm to 150 mm dia. Pipe |
| 23 | P-L-22 It no.-16 of PHED SOR, Making holes in two sides of wall of culvert/drain or any other structures in any places for layin any dia pipe line within structures in any places for laying any dia pipe line within structures intwo sides of wall of culvert /drain/any structureat any places and mending good damages all complete as per direction of EIC. |
| 24 | P-L-22 It no.-16 of PHED SOR, Making lighting arrangement for continuation work during night including all charges (Applicable exclusively for emergency situation and as per direction of EIC. |
| 25 | P-L-22 It no.-17 of PHED SOR, 2019 a) Construction of RCC Street stand post (700 mm height) of RCC (1:1.5:3) footing over 75 mm thick 4:2:1 P.C.C over a single B/F saoling with 1% reinforcement, connected with saddle piece & 15 mm dia brass ferrule with supplying fitting, fixing 15 mm dia G.I. nipple, G.I.socket, G.I. 200 mm X 150 mm reducing elbow and 20 mm dia GI (m) TATA pipe of (avg.) 2.6 mtr. long and one 15 mm dia alloy Iron with brass spindle bib cock with socket and 20 mm G.I. elbow 2 nos. with 15 mm G.I.(m) TATA pipe of 0.225 mtr. for connection of stand post to distribution line as per deptt. design and drawing as per direction of EIC along with construction of platform o size CC platform (1:2:4) over a single B/F soling below G.L. over 150 mm thick sand filling, neat cement finish over platform band and outside upto G.L. as per deptt. drawing and as per direction of EIC |
| 26 | P-L-23 It no.-19 of PHED SOR, 2019 Making barrcading of excavation trenches of road width upto 15 mtr. To avoid any accident by providing 75 mm dia bamboo post placed vertically & horizontally with the help of 6'' size iron rail as per direction and satisfaction of EIC. (Applicable where critical situation arise and take up the work as per direction of EIC |
| 27 | Providing FHTC from the existing CI/DI/UPVC/HDPE/GI/AC distribution pipeline by installng 10 mm NB Gun-metal ferrule conforming to IS : 2692: 1989 with latest amendments on the said pipeline with suply , fitting & fixing of all other accessories like saddle piece of required size to fit the existing distribution pipeline, specials, nut & bolts, rubber sheet, washers etc and supply & laying of 15 mm NB PVC (schedule 80)/20 mm OD HDPE (PEIOO, PN 16) pipe (average 15 m length) with all necessary specials 1.0 meter below the grond connection the ferrule including cutting trenches in all sorts of soil anf filling up trenches as per direction of the Engineer-in-charge and upto a point just inside the premises of the household or as directed by the EIC. Supply and installation of a 15 mm dia. alloy iron Bib Cock of 15 mm dia. with brass spindle (tested to 21 kg/cm2) to be fitted in a position as directed by EIC. G.I. pipe of TATA make (medim duty) of 2 metre length with all necessary specials to continue from the end of the HDPE/PVC pipe and upto 1.0 m above grond within the premises of household. 1. PVC pipe shall of schedule 80 (medium duty) conforming to ASTMD- 1785 and threaded to match with G.I. pipe as per IS: 1239 (part-I). 2. Rate is exclusive of supply and delivery of 10 mm NB Gun metal Ferrule. 3. Payment of supply and laying of 15 mm dia. NB PVC (Schedule 80) or 20 mm OD HDPE (PE 100, PN 16) pipe with all necessary specials 1.0 m below the ground will be made on actual measurement basis. The rate of this item is Rs, 117/- per meter. |
| 28 | ADD 18 % GST |
| 29 | ADD 1% CESS Please Enable Macros to View BoQ information |