| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.All kinds of soil |
| 2 | Earth work in Mar, Ranker and Kanker mixed soil in digging or in embankment including lead up to 395m and lift upto 1.50 m with manual compaction and dressing. |
| 3 | Dismantling of old and damaged brick/stone masony and plain concrete with lime or cement motar |
| 4 | Laying & spreading of Brick rora (Excluding Brick rora) in foundation |
| 5 | Laying & spreading Local sand or moorum plaster in sub grade below C.C. lining for proper completion of work as per direction of Engineer-in-Charge. |
| 6 | Laying cement concrete mix with 1:3:6 in foundation with compaction and curing including all cost material labour and T&P etc. |
| 7 | Brick work (M-150) with 1:3 cement motar including all cost material labour and T&P etc. |
| 8 | Centering & shuttring for R.C.C. & C.C. work in bed block, slab & foundation C.C. including cost of all material and T&P etc. |
| 9 | Reinforcement for R.C.C. work i/c cutting , bending,& binding& placing in position including cost of material, labour, T& P etc. |
| 10 | R.C.C. 1: 1.5: 3 with stone grit (10-20mm) size i/c all cost of labour and T & P etc. |
| 11 | Struck pointing 1:2 cement mortat including all cost of material, labour and T&P etc. |
| 12 | Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 Itr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) |
| 13 | Supply , Laying , jointing ,testing and commisionning the HDPE pipe in standard length confirming to I.S. 4984 , I.S. 7634 etc . including cost of Transportation , fright charges , inspection charges ,loading unloading charges , conveyance to departmental store / site and stacking the same , sand cusion of 15 cm thick all around the pipe etc. Complete in all respect to the operational form as per direction of Engineer in charge. HDPE pipe 110 mm PE 100 pipe PN4, IS-4984 |
| 14 | Supply , Laying , jointing ,testing and commisionning the HDPE pipe in standard length confirming to I.S. 4984 , I.S. 7634 etc . including cost of Transportation , fright charges , inspection charges ,loading unloading charges , conveyance to departmental store / site and stacking the same , sand cusion of 15 cm thick all around the pipe etc. Complete in all respect to the operational form as per direction of Engineer in charge. HDPE pipe 160 mm PE 100 pipe PN6, IS-4984. |
| 15 | Providing and laying C.C. (1:2:4) in coping with coarse sand cement and 10mm to 20mm crushed stone grite including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer-in-charge. |
| 16 | Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the etc. proportion of 1:2 (1 cement : 2 fine sand) including testing of joints complete 900 mm dia RCC pipes. |
| 17 | Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the etc. proportion of 1:2 (1 cement : 2 fine sand) including testing of joints complete 600 mm dia RCC pipes. |
| 18 | Removal of slush (Excluding cost of dewatering) |
| 19 | Dewatering by pump. 10HP |
| 20 | Fabrication and fixing of canal gate shutter including all cost of material labour T&P etc for proper completion of work as directed by Engineer-in-charge. |
| 21 | Supply and fixing of canal gate threaded shoft including all cost of material labour T&P etc for proper completion of work as directed by Engineer-in-charge. |
| 22 | Painting on old rusted steel surface of gates and appurtenances after preparation of surface properly by sand blasting process and applying two coat of Zinc Rich primer and two coat of solvent less epoxy paint including cost of all material, labour T&P and scaffolding required for proper completion of work. Please Enable Macros to View BoQ information |