| 1 | Part A: Construction of CC Drain |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil |
| 3 | P/L Stone Soling of Specified size duely hand packed Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured). |
| 4 | CEMENT CONCRETE (CAST-IN-SITU)Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including cost and carriage of all materials from approved source to site of work withe all leads lifts, loading, unloading and Octori (finished work to be measured) complete job |
| 5 | CEMENT CONCRETE (CAST-IN-SITU)Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including cost and carriage of all materials from approved source to site of work withe all leads lifts, loading, unloading and Octori (finished work to be measured) complete job |
| 6 | Centring and shuttering including strutting, propping etc and removal of formwork for Foundations, footings, bases of columns etc for mass concrete |
| 7 | Part B: Construction of RRM B/Wall |
| 8 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil |
| 9 | CEMENT CONCRETE (CAST-IN-SITU)Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including cost and carriage of all materials from approved source to site of work withe all leads lifts, loading, unloading and Octori (finished work to be measured) complete job |
| 10 | Polygonal/Random rubble Stone masonry work in cement mortar 1:4 with quarry stones in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)Including cost and carriage of all materials from approved source to site with all leads and lifts,shuttering and octori etc complete job (Finished work to be measured). . |
| 11 | Polygonal/Random rubble Stone masonry work dry with quarry stones in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .Including cost and carriage of all materials from approved source to site with all leads and lifts,shuttering and octori etc complete job (Finished work to be measured). |
| 12 | CEMENT CONCRETE (CAST-IN-SITU)Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including cost and carriage of all materials from approved source to site of work withe all leads lifts, loading, unloading and Octori (finished work to be measured) complete job |
| 13 | Part C: Construction of Crate Wall |
| 14 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil |
| 15 | CEMENT CONCRETE (CAST-IN-SITU)Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including cost and carriage of all materials from approved source to site of work withe all leads lifts, loading, unloading and Octroi (finished work to be measured) complete job |
| 16 | Providing and laying of boulder apron laid in wire crates with 4 mm dia Black Anealed wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25Kg each as per technical specifications clause 1301 including cost and carriage of all materials from source to site of work (Finished work to be measured) |
| 17 | CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including cost and carriage of all materials from approved source to site of work withe all leads lifts, loading, unloading and Octroi (finished work to be measured) complete job |
| 18 | Backfilling behind abutment, wing wall and return wall, with selected granular material including cost and carriage of all materials from approved source to site of work with all leads lifts, loading, unloading and Octroi (finished work to be measured) complete job Please Enable Macros to View BoQ information |