|
| 1 | S&F in replacement of power command Controller for automatic shifting supply for capacity of 40 to 125 KVA as per existing DG set fixed at site complete all as specified and directed by Engineer-in-Charge. |
| 2 | S&F in replacement of power command controller for automatic shifting supply for capacity of 160 to 250 KVA complete all as specified and directed by Engineer-in-Charge. |
| 3 | Dismantling /opening of upper portion of diesel engine 30 KVA to 75 KVA (Make:greaves/ Kirloskar,/Cumiuns/ water cooled ,turbo charged 1500 RPM ,vertical type for Top over hauling ,repair/servicing of engine including taking out rediator /fuel pump,water pump ,turbo charger etc.for the following repairs/overhauling :- (a) Dismantlling/opening of complete cylinder head assembly rocker arms assembly piston head assembly sleeves by by removing nuts & bolts for repairs complete. Note 2:- Repair and Transportation charge for carrying out pair and after repair carrying back to Power House shall be deemed to be included in this rates. (b) Servicing & Washing of complete engine parts with Kerosene oil. (c) Re-assembling of engine after replacement of UNSV/defective parts with new parts as listed in given below and testing of engine as per company recommendation after reassembling all parts as direted to the satifaction of the Engr-in-Charge. |
| 4 | Piston Assembly With Pistan ring Set |
| 5 | Cylinder Liner |
| 6 | Liner O Ring |
| 7 | Ring Set |
| 8 | Joint Kit |
| 9 | Head Gasket |
| 10 | Hose Pipe |
| 11 | Valve Inset Seat |
| 12 | Valve Guide |
| 13 | Valve Seal |
| 14 | Connecting Rod With Bearing |
| 15 | FIP Element Complete |
| 16 | Lub Oil Pump Assembly |
| 17 | Conrod with small end bush and locating pin |
| 18 | Dismantling /opening of upper portion of diesel engine 100 KVA to 160 KVA (Make:greaves/ Kirloskar,/Cumiuns/ water cooled ,turbo charged 1500 RPM ,vertical type for Top over hauling ,repair/servicing of engine including taking out rediator /fuel pump,water pump ,turbo charger etc.for the following repairs/overhauling :- (a) Dismantlling/opening of complete cylinder head assembly rocker arms assembly piston head assembly sleeves by by removing nuts & bolts for repairs complete. Note 2:- Repair and Transportation charge for carrying out pair and after repair carrying back to Power House shall be deemed to be included in this rates. (b) Servicing & Washing of complete engine parts with Kerosene oil. (c) Re-assembling of engine after replacement of UNSV/defective parts with new parts as listed in given below and testing of engine as per company recommendation after reassembling all parts as direted to the satifaction of the Engr-in-Charge. |
| 19 | Piston Assembly With Pistan ring Set |
| 20 | Cylinder Liner |
| 21 | Liner O Ring |
| 22 | Ring Set |
| 23 | Joint Kit |
| 24 | Head Gasket |
| 25 | Hose Pipe |
| 26 | Valve Inset Seat |
| 27 | Valve Guide |
| 28 | Valve Seal |
| 29 | Connecting Rod With Bearing |
| 30 | FIP Element Complete |
| 31 | Lub Oil Pump Assembly |
| 32 | Conrod with small end bush and locating pin |
| 33 | Dismantling /opening of upper portion of diesel engine 200 KVA to 320 KVA (Make:greaves/ Kirloskar,/Cumiuns/ water cooled ,turbo charged 1500 RPM ,vertical type for Top over hauling ,repair/servicing of engine including taking out rediator /fuel pump,water pump ,turbo charger etc.for the following repairs/overhauling :- (a) Dismantlling/opening of complete cylinder head assembly rocker arms assembly piston head assembly sleeves by by removing nuts & bolts for repairs complete. Note 2:- Repair and Transportation charge for carrying out pair and after repair carrying back to Power House shall be deemed to be included in this rates. (b) Servicing & Washing of complete engine parts with Kerosene oil. (c) Re-assembling of engine after replacement of UNSV/defective parts with new parts as listed in given below and testing of engine as per company recommendation after reassembling all parts as direted to the satifaction of the Engr-in-Charge. |
| 34 | Piston Assembly With Pistan ring Set |
| 35 | Cylinder Liner |
| 36 | Liner O Ring |
| 37 | Ring Set |
| 38 | Joint Kit |
| 39 | Head Gasket |
| 40 | Hose Pipe |
| 41 | Valve Inset Seat |
| 42 | Valve Guide |
| 43 | Valve Seal |
| 44 | Connecting Rod With Bearing |
| 45 | FIP Element Complete |
| 46 | Lub Oil Pump Assembly |
| 47 | Conrod with small end bush and locating pin |
| 48 | M&L in replacement of fuel pump complete with all accessories of 30 KVA to 160 KVA DG Set ,complete all as specified and directed by Engr-in-charge. |
| 49 | M&L in replacement of fuel pump complete with all accessories of 200 KVA to 320 KVA DG Set ,complete all as specified and directed by Engr-in-charge. |
| 50 | M&L for repair /overhauling and calibration of injectors assembly complete by replacing of burn out part suitable for 30 to 160 KVA DG SET ,complete all as specified and directed by Engr-in-charge. |
| 51 | M&L for repair /overhauling and calibration of injectors assembly complete by replacing of burn out part suitable for 200 to 320 KVA DG SET ,complete all as specified and directed by Engr-in-charge. |
| 52 | S&F in replacement Self Starter new one 24 V/12V DC Suitable for 31.5 to 160 KVA DG Set as per existing model and type Complete all as specified and directed. . |
| 53 | S&F in replacement Self Starter new one 24 V DC Suitable for 200 KVA/250KVA DG Set as per existing model and type Complete all as specified and directed. |
| 54 | S&F in replacement, calibration and testing of turbo charger including replacement of turbo charger kit splite seal ,cup screw ring retainer and burn out nuts bollt etc for 30 KVA to 160 KVA DG set incl connecting pipe and accessories as per existing model and type Complete all as specified and directed. |
| 55 | S&F in replacement, calibration and testing of turbo charger including replacement of turbo charger kit splite seal ,cup screw ring retainer and burn out nuts bollt etc for 200 KVA to 320 KVA DG set incl connecting pipe and accessories as per existing model and type Complete all as specified and directed.. |
| 56 | S&F in replacement, AVR suitable for 30 to 160 KVA as per existing model and type Complete all as specified and directed. |
| 57 | S&F in replacement, AVR suitable for 200 to 320 KVAas per existing model and type Complete all as specified and directed. |
| 58 | Taking out UNSV and Supply and replacement of battery charger of 0-24 volts DC for charging of lead acid battery of 2-12 V of any amp rating battary including taking down complete as per exsting make and type all as specifeid and directed by engr-in-charge. |
| 59 | Taking out UNSV and Supply and replacement of battery charger of 0-12 volts DC for charging of lead acid battery of 2-12 V of any amp rating battary including taking down complete as per exsting make and type all as specifeid and directed by engr-in-charge. |
| 60 | Supply and installing as in replacement of 12 volt 80 AH lead acid wet maintenance free battery including initial charging with necessary material connecting with battery lead of DG Set at site and setting aside unserviceable material for reuse or carry store complete including taking down. |
| 61 | Taking out UNSV and M&L for asbestos rope of suitable size and superier quality for heat insulation including rapping arround the exhaust pipe and winding with wire mess and plastering with plaster of peris /white cement for smooth finishing all as specified and directed by engr-in-charge. |
| 62 | Supply only 15W-40 Engine oil Make- HP/Servo/MAK |
| 63 | S&F replacement heavy duty battery lead for 180 AH , 12 V battery copper conductor PVC insulated multistranded 1.25 mtr long (Two Nos) duly fixed and lugs complete all as directed |
| 64 | S&F in replacement heavy duty battery terminals brass forged with nuts and bolts complete all as directed |
| 65 | Servicing of self starter from DG sets of 62.5KVA to 320 KVA and replacement of the U/S items and reassembling & refixing to exsting DG sets including necessary servicing made 100 % servicibility and testing complete all as directed.Note :-Spare shall be measure and paid sapartely.on relevent items only |
| 66 | Taking out UNSV and Supply & Fixing Solenoid Switch 01 No. |
| 67 | Taking out UNSV and Supply & Fixing Armature 01 No. |
| 68 | Taking out UNSV and Supply& Fixing Field coil copper 01 Set. |
| 69 | Taking out UNSV and Supply & Fixing Carbon Brush 01 Set. |
| 70 | Taking out UNSV and Supply & Fixing Bearing |
| 71 | Taking out UNSV and Supply & Fixing Pinion 01 Nos |
| 72 | S&F in replacement radiator made up of copper inside tank and fins as per fanufacture's design of Kirloskar/Greaves suitable for 30 to 160 KVA DG Set including taking out old and unserviceable radiator for demolition or credit complete all as directed by Engineer -in-charge |
| 73 | S&F in replacement of radiator made up of copper inside tank and fins as per fanufacture's design of Kirloskar/Greaves suitable for 200 KVA to 320 KVA DG Set including taking out old and unserviceable radiator for demolition or credit complete all as directed by Engineer -in-charge |
| 74 | Dismantling, opening and cleaning of complete radiator assembly of DG Set 30 KVA to 100 KVA, Make : Kirloskar/Cummins/ Crompton Greaves and checking of water leakage, including upper and bottom tank cleaning of slots including welding/brazing where required and making 100 % leak proof and washing with chemically anti corrosion /water sooution by using jet pumping set and well as cleaning manually by using steel wire brushes and removing all rust silt /corrosive material and making good smooth functioning and replacement of radiator hose pipe set,and upper &bottom tank gasket set,all rusted nut ,bolt ,washer ,radiator caps etc complete all as specified and directed by Engineer-in-Charge. |
| 75 | Dismantling, opening and cleaning of complete radiator assembly of DG Set 125-320 KVA, Make : Kirloskar/Cummins/ Crompton Greaves and checking of water leakage, including upper and bottom tank cleaning of slots including welding/brazing where required and making 100 % leak proof and washing with chemically anti corrosion /water sooution by using jet pumping set and well as cleaning manually by using steel wire brushes and removing all rust silt /corrosive material and making good smooth functioning and replacement of radiator hose pipe set,and upper &bottom tank gasket set,all rusted nut ,bolt ,washer ,radiator caps etc complete all as specified and directed by Engineer-in-Charge. |
| 76 | Servicing of DG set capacity 160 to 320 KVA installed at 23 Wing AF including carrying out maintenance and check alongwith following repairs (a)Drain out the lubricating oil from sump and refilling after proper cleaning (b)Replace Engine Oil filter cartridge .(c)Renew fuel filter cartridge (d)Check tightness of all nuts and bolts (e)Check adjustment of V belt for driving engine water pump and alternator.(g)Assembling complete old serviceable parts and replacement of old unserviceable parts by new one as per direction of Engr-in-Charge.(h)Testing of DG set after servicing as per Engr –in Charge.(j)Cleaning of air cleaner filter after period of hrs run as specified by manufactures in manual Note:- (i) Any minor parts such as screws, washers , split pin , circlip etc shall be supplied by the firm, rate for the same shall be deemed to be included in the unit rate quoted.(ii) The Job shall be carried out after two hundred hrs run /as when required directed by engr-in-charge of DG Set and shall be measured and paid separatly,no of times carried out during entire period of contract (iii) Drain out the fuel from fuel tank and refilling after proper cleaning with the help of high pressure pump complete all as specified. |
| 77 | S&F in replacement oil pipe of DG Set 160-320 KVA, complete all as specified and directed by Engineer-in-Charge. Make: Kirloskar/Cummins/Crompton Greaves. |
| 78 | S&F in replacement lub oil filter of DG Set 160-320 KVA, complete all as specified and directed by Engineer-in-Charge. Make: Kirloskar/Cummins/Crompton Greaves. |
| 79 | S&F in replacement Air filter of DG Set 160-320 KVA, complete all as specified and directed by Engineer-in-Charge. Make: Kirloskar/Cummins/Crompton Greaves. |
| 80 | S&F in replacement fuel diesel filter of DG Set 160-320 KVA, complete all as specified and directed by Engineer-in-Charge. Make: Kirloskar/Cummins/Crompton Greaves. |
| 81 | Servicing of DG set capacity 10 to 125 KVA installed at 23 Wing AF including carrying out maintenance and check alongwith following repairs (a)Drain out the lubricating oil from sump and refilling after proper cleaning (b)Replace Engine Oil filter cartridge .(c)Renew fuel filter cartridge (d)Check tightness of all nuts and bolts (e)Check adjustment of V belt for driving engine water pump and alternator.(g)Assembling complete old serviceable parts and replacement of old unserviceable parts by new one as per direction of Engr-in-Charge.(h)Testing of DG set after servicing as per Engr –in Charge.(j)Cleaning of air cleaner filter after period of hrs run as specified by manufactures in manual Note:- (i) Any minor parts such as screws, washers , split pin , circlip etc shall be supplied by the firm, rate for the same shall be deemed to be included in the unit rate quoted.(ii) The Job shall be carried out after two hundred hrs run /as when required directed by engr-in-charge of DG Set and shall be measured and paid separatly,no of times carried out during entire period of contract (iii) Drain out the fuel from fuel tank and refilling after proper cleaning with the help of high pressure pump complete all as specified. |
| 82 | S&F in replacement oil pipe of DG Set 30 to 125 KVA, complete all as specified and directed by Engineer-in-Charge. Make: Kirloskar/Cummins/Crompton Greaves. |
| 83 | S&F in replacement lub oil filter of DG Set 30 to 125 KVA, complete all as specified and directed by Engineer-in-Charge. Make: Kirloskar/Cummins/Crompton Greaves. |
| 84 | Supply & Fixing in replacement Air filter of DG Set 30 to 125KVA, complete all as specified and directed by Engineer-in-Charge. Make: Kirloskar/Cummins/Crompton Greaves. |
| 85 | S&F in replacement fuel diesel filter of DG Set 30 to 125 KVA, complete all as specified and directed by Engineer-in-Charge. Make: Kirloskar/Cummins/Crompton Greaves. |
| 86 | M&L in replacement alternator from DG sets of 30 KVA to 320 KVA DG Set cap after disconnection of cable /earth lead and decompute from engine ,transportation to the civil workshop After Repair Alternater refixing the existing DG set connecting with engine ,connecting with cable earth lead and complete testing on load all as specified and directed by engr-in-charge. |
| 87 | Rewinding of Alternator Complete Including and supply and replacement of copper Wire including suitable winding material rewinding the stator winding with existing size,guage &weight of super enamelled copper wire of approved make including replacement of all insulating material varneshing with approved grade and quality of insulating varnish during up,and heating the stator winding in the heat chamber ,insulating , assembling the alternator Complete.all as specified and directed by engr-in-charge. |
| 88 | Supply only distilled water for lead acid battery all as directed . |
| 89 | Supply only dioute Sulphuric acid for lead Acid Battery. |
| 90 | Supply only coolent for DG sets.as per approved quality and directed by Engr-in -Charge. |
| 91 | Supply Hand Rotary Barrel Pump to power house for filling of fuel complete with 2mtr 25mm flexible PVC Pipe all as specified. |
| 92 | M& L for repair /re-winding of old excitation coil complete with necessary connection after repairing including opening ,disconnecting of electrical connection ,opening canopy as per requirment .complete all as specified and as directed. |
| 93 | Supply and replacement of speedo meter /Hr meter alongwith connecting cord as per exsting make incl all Connected acessories complete all as specified and directed . |
| 94 | Taking out carban brush holder of following DG set ,supply and fix new carban brush holder as per existing size and make in item |
| 95 | 160 to 320 KVA DG set |
| 96 | 75 to125 KVA DG set |
| 97 | 30 to 70 KVA DG set |
| 98 | Taking out UNSV and S&F MS Pipe of Size 80 mm Dia for DG Set Silencer Including Welding And Painting complete all as specified |
| 99 | Taking out UNSV and S&F MS Pipe of Size 100 mm Dia for DG Set Silencer Including Welding And Painting complete all as specified |
| 100 | Taking out UNSV and S&F fan belt for 30 to 320 KVA of DG set as per existing type/Model complete all as specified and directed. |
| 101 | Taking out UNSV and S&F fan belt for alternator of DG Set of any capacity and make as per existing type/Model complete all as specified and directed.. |
| 102 | S&F fly wheel gear ring for 75 KVA to 320 KVA DG Set of Make: Greeves/Kirloskar including taking out the old Unserviceable as per existing type/Model complete all as specified and directed.. |
| 103 | Supply and installing as in replacement of 12 volt 150 AH lead acid wet maintenance free battery including initial charging with necessary material connecting with battery lead of DG Set at site and setting aside unserviceable material for reuse or carry store complete including taking down. |
| 104 | S&F water pump assy suitable for 30 KVA to 125 KVA DG Set of Make: Greeves/Kirloskar including taking out the old Unserviceable as per existing type/Model complete all as specified and directed.. |
| 105 | S&F water pump assy suitable for 160 KVA to 320 KVA DG Set of Make: Greeves/Kirloskar including taking out the old Unserviceable as per existing type/Model complete all as specified and directed.. |
| 106 | S&F Fan drive assy suitable for 30 to 125 KVA DG Set of Make: Greeves/Kirloskar including taking out the old Unserviceable as per existing type/Model complete all as specified and directed. . |
| 107 | S&F Fan drive assy suitable for 160 to 320KVA DG Set of Make: Greeves/Kirloskar including taking out the old Unserviceable as per existing type/Model complete all as specified and directed.. |
| 108 | S&F thermostat for 30 to 125 KVA DG Set of Make: Greeves/Kirloskar including taking out the old Unserviceable as per existing type/Model complete all as specified and directed.. |
| 109 | S&F thermostat for 160 to 320 KVA DG Set of Make: Greeves/Kirloskar including taking out the old Unserviceable as per existing type/Model complete all as specified and directed.. |
| 110 | S&F residential silencer suitable for 30 to 125 KVA DG Set of Make: Greeves/Kirloskar including taking out the old Unserviceable as per existing type/Model complete all as specified and directed.. |
| 111 | S&F residential silencer suitable for 160 to 320 KVA DG Set of Make: Greeves/Kirloskar including taking out the old Unserviceable as per existing type/Model complete all as specified and directed.. |
| 112 | Taking out UNSV and Supply & Fixing Rediator hose Pipe ( for water pipe ) for DG Set of Capacity 31.5 KVA to 160 KVA complete all as specifed . |
| 113 | Taking out UNSV and Supply & Fixing Rediator hose Pipe ( for water pipe ) for DG Set of Capacity 200 KVA to 320 KVA complete all as specifed. |
| 114 | Supply only 15W-40 Engine oil Make- HP/Servo/MAK |
| 115 | Taking out UNSV and Supply & Fixing Rubber Spider Coupling suitable for 30 to 125 KVA DG Set as per existing type/Model complete all as specified and directed. |
| 116 | Taking out UNSV and Supply & Fixing Rubber Spider Coupling suitable for 160 to 320 KVA DG Set as per existing type/Model complete all as specified and directed. |
| 117 | Supply and filling Diesel Exhaust Fluid complete all as specified and directed. |
| 118 | Supply and installing as in replacement of 12 volt 180 AH lead acid wet maintenance free battery including initial charging with necessary material connecting with battery lead of DG Set at site and setting aside unserviceable material for reuse or carry store complete including taking down. |
| 119 | Suppy and fixing in repair solenoid switch 12 Volt make Greaves suitale for DG Set upto 125 KVA of any make complete all as specified and directed by the Engineer-in-Charge |
| 120 | Suppy and fixing in repair solenoid switch 24 Volt make Greaves suitale for DG Set upto 320 KVA of any make complete all as specified and directed by the Engineer-in-Charge Please Enable Macros to View BoQ information |
| 121 | Suppy and fixing in repair solenoid switch 24 Volt make Greaves suitale for DG Set upto 320 KVA of any make complete all as specified and directed by the Engineer-in-Charge Please Enable Macros to View BoQ information |