| 1 | Main engine no.2 and 4 require to be top overhauling(labour charge only) |
| 2 | Machine shop job of Engine no.2 and Engine No.4 |
| 3 | Block boring to be done. |
| 4 | Cylinder Re-sleeving to be done. |
| 5 | Crank shaft grinding to be done. |
| 6 | Bearing setting to be done. |
| 7 | Cam bush boring and setting to be done. |
| 8 | C.R. Bush boring to be done. |
| 9 | Standard pin and bush setting to be done. |
| 10 | Connecting rod tasting to be done. |
| 11 | Cleaning to be done of cylinder head and block. |
| 12 | Heat testing to be done. |
| 13 | Re-seating of valve seat |
| 14 | Dup seat(original) |
| 15 | Face polishing to be done of cylinder head |
| 16 | Valve guide machining |
| 17 | Block testing to be done. |
| 18 | Water jacket fitting to be done. |
| 19 | Block oil jacket to be done. |
| 20 | Collar bearing setting to be done. |
| 21 | Cam jacket fitting to be done. |
| 22 | Pipe modification to be done. |
| 23 | Elbow supply to be done. |
| 24 | Crank shaft testing to be done. |
| 25 | Cam shaft testing to be done. |
| 26 | Crank shaft O ring to be fitted. |
| 27 | Stud fitting, oil seal setting |
| 28 | Repair of FIP and Injector of Engine no.2 and Engine No.4 |
| 29 | Renewal of injector element |
| 30 | Renewal of Delivery valve |
| 31 | Renewal of service kit |
| 32 | Renewal of governor kit |
| 33 | Renewal of bearing |
| 34 | Renewal of Nozzle |
| 35 | renewal of flyweight |
| 36 | Nozzle washer |
| 37 | Bilge pump to be overhauled |
| 38 | Main engine sea water cooling pump required to be overhauling |
| 39 | DG sea water pump to be overhauled |
| 40 | Anchor winch to be made operational |
| 41 | Ramp winch to be check and service |
| 42 | both DG to be service(labour only) |
| 43 | Vessel entire electrical arrangement including navigational system to check and repair as required. |
| 44 | Safety system of all engines to be checked and shown to surveyor |
| 45 | Zinc anode to be fitted |
| 46 | inside panelling of crews cabin to be repaired/ renewal |
| 47 | self-starter to be repaired |
| 48 | 01nos stern tube and 2 nos. rudder bush renewed |
| 49 | HSD Tank to be cleaned |
| 50 | F.W. tank to be cleaned and cementing |
| 51 | Damaged guard railing to be renewed |
| 52 | all motors to be megger tested |
| 53 | self-starter armeture to be renewed |
| 54 | Turbo charger to be repaired |
| 55 | Heat exchanger to be serviced |
| 56 | After cooler to be service |
| 57 | Gear box to be service |
| 58 | Fire hydrant to be repaired |
| 59 | Domestic sea water and fresh water pipe line to be renewed Please Enable Macros to View BoQ information |