| 1 | Providing and laying Gypsum panel partitions 100 mm thick with water proof Gypsum panels of size 666x500x100 mm, made of calcite phosphor Gypsum fixed with tongue and groove edges and jointed with bonding plaster as per manufacturer’s specifications in superstructure above plinth level up to floor V level. Gypsum blocks will have a minimum compressive strength of 9.3 kg/cm |
| 2 | Providing and fixing frame work for partitions/ wall lining etc. made of 50x50x1.6 mm hollow MS tube, placed along the walls, ceiling and floor in a grid pattern with spacing @ 60 cm centre to centre both ways horizontally) or at required spacing near opening, with necessary welding at junctions and fixing the frame to wall/ ceiling/ floors with steel dash fasteners of 8 mm dia, 75 mm long bolt, including making provision for opening for doors, windows, electrical conduits, switch boards etc., including providing with two coats of approved steel primer etc. complete, all as per direction of Engineer-in-charge. |
| 3 | Providing and fixing precoated galvanised iron profile sheets (size, shape and corrugation as approved by Engineer-in-Charge) of total coated thickness 0.50 mm (base metal of minimum 0.45 mm thickness with total coating thickness of 0.05mm) with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, of total complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. |
| 4 | Gutter (600 mm over all girth) Providing and fixing precoated galvanised steel sheet roofing accessories coated thickness 0.50 mm (base metal of minimum 0.45 mm thickness with total coating thickness of 0.05 mm) with Zinc coating 120 gram per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete : |
| 5 | structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 6 | 1:1.5:3 (1 Cement: 1.5 coarse sand (zone-lll) including manufactured sand derived Concrete Aggregate (RCA) upto 25% : 3 graded stone aggregate 20 mm nominal size including Recycled Concrete Aggregate (RCA) upto 25%). |
| 7 | Providing and fixing Aluminium Composite Panel (ACP) curtain wall system of 4mm thick matching existing ACP Panel or approved colour and make fixing over aluminium frame of 50mm x 25mm thick in grid form including cutting bending, ACP to required size and shape, fixing on Aluminium frame with weather Silicon sealant and finishing the groove with black colour sealant as per manufacturer’s specification complete all inclusive of wastage, labour, shifting, transportation etc. as directed and instructed by Engineer incharge |
| 8 | The work involves the thorough cleaning of existing polycarbonate sheets, followed by the systematic sealing of all longitudinal and transverse joints, as well as bolt fixings, using high-grade waterproofing materials to ensure a 100% watertight installation. The participating agency must visit the site to assess the current level of degradation, accumulation of debris, and the condition of the existing support structure.All silt, moss, bird droppings, and old, peeling sealants must be removed. Harsh chemical cleaners, abrasives, or high-pressure washers (above 1,500 PSI) are strictly prohibited as they can damage the UV-protective layer of the polycarbonate.Cold-applied, high-tack bituminous tape with a weather-resistant aluminum or UV-stabilized film backing.Apply the membrane over the joints with a minimum overlap of 50mm on either side of the seam. All materials used must be chemically compatible with polycarbonate to prevent \\"crazing\\" and sealing all joints using a suitable waterproofing compound or self-adhesive bituminous polymer membrane, as required, complete in all respects and as directed by the Engineer-in-Charge Please Enable Macros to View BoQ information |