| 1 | Part A :350M Head Pump Motor Set Installation at 0D/8L for dewatering of RVI seam of MIC, JPC |
| 2 | Transportation of baseframe from surface to 0D/8L by MUV and manually and place it. |
| 3 | Fabrication of a platform (4mtr X 2mtr X 1ft) after brick, cement, sand transportation from surface. |
| 4 | Transporting of One 1000GPM, 350M head pump to 0D/8L from surface and installation of it. |
| 5 | Transporting of One 250kW / 6.6kV motor to 0D/9L from surface and installation of it. |
| 6 | Transportation of 250kW / 6.6kV Prabhu make starter from surface to 0D/9L by MUV and placing manually. |
| 7 | Transportation of 100 mtr 35 sqmm armoured cable from surface to 1D/9L by MUV and then laying it from 1D/9L to 0D/9L and hanging it. |
| 8 | Making of 10 no 6\\" dia MS pipe, 6\\" dia MS pipe T bend, 10 nos of 6\\" dia MS pipe bend, 4 nos of 6\\" shortpiece and welding of flanges at surface. (surface rate considered). |
| 9 | Loading of 10 nos bend of the pump of 6\\" dia MS pipe, 6\\" dia MS pipe T bend, 4 nos of 6\\" shortpiece in MUV at surface and transporting it at site and laying it. |
| 10 | Loading of 10 nos of 6\\" dia MS pipe in MUV at surface and transporting it at site and laying it. |
| 11 | Belt joint cutting for 6\\" dia pipe at surface. (surface rate considered). |
| 12 | Fitting of 6\\" dia MS pipe (both side flange fitted) at site with floor cutting at gallery buttom corner for spacious movement of MUV from 0D/9L to 0D/4L about 210 metre (After manually disconnecting and transporting pipe from various places along 2D, 1D). |
| 13 | Fitting of Goal Post and matching with delivery line by gas cutting and making free flange at both side one no at 0D/+6L. |
| 14 | Alignment of pump motor after placing pump and motor on baseframe and delivery (8\\" pump body side 6' Dia MS pipe) matching with fitting of valves in delivery and give support under the suction pipes with damaged drum or wooden slippers. And required fabrication job by gascutting and welding. |
| 15 | Checking of pipes and leakage rectification at delivery pipe line after running of pump. |
| 16 | Supply of Oxygen Cylinder(9 nos) |
| 17 | Supply of DA Cylinder(3 nos) |
| 18 | Supply of 6\\" dia MS flange with 10 mm (51 nos) |
| 19 | Supply of 5/8X 2\\" MS nut bolt(34.6 kg) |
| 20 | Part B : 350M Head Pump Motor Set Installation at 28L/34D for dewatering of RVI seam of MIC, JPC |
| 21 | Transportation of baseframe from surface to 28L/34D by MUV and manually and place it. |
| 22 | Fabrication of a platform(4mtrX2mtrX1ft) after brick, cement, sand transportation from surface. |
| 23 | Transporting of One 1000GPM, 350M head pump to 28L/34D from surface and installation of it. |
| 24 | Transporting of One 250kW/6.6kV motor to 28L/34D from surface and installation of it. |
| 25 | Transportation of 250kW/6.6kV Prabhu make starter from surface to 0D/9L by MUV and placing manually. |
| 26 | Transportation of 200 mtr 35 sqmm armoured cable from surface to 1D/9L by MUV and then laying it from 28L/31D to 28L/34D and hanging it. |
| 27 | Making of 10 no 6\\" dia MS pipe, 6\\" dia MS pipe T bend, 10 nos of 6\\" dia MS pipe bend, 4 nos of 6\\" shortpiece and welding of flanges at surface. (surface rate considered). |
| 28 | Loading of 10 nos bend of the pump of 6\\" dia MS pipe, 6\\" dia MS pipe T bend, 4 nos of 6\\" shortpiece in MUV at surface and transporting it at site and laying it. |
| 29 | Loading of 10 nos of 6\\" dia MS pipe in MUV at surface and transporting it at site and laying it. |
| 30 | Belt joint cutting for 6\\" dia pipe at surface. (surface rate considered). |
| 31 | Fitting of 6\\" dia MS pipe(both side flange fitted) at site with floor cutting at gallery buttom corner for spacious movement of MUV from 28L/31D to 28L/34D about 175 metre (After manually disconnecting and transporting pipe from various places along 2D, 1D. |
| 32 | Fitting of Goal Post and matching with delivery line by gas cutting and making free flange at both side one no at 28L/28D. |
| 33 | Alignment of pump motor after placing pump and motor on baseframe and delivery(8\\" pump body side 6' Dia MS pipe) matching with fitting of valves in delivery and give support under the suction pipes with damaged drum or wooden slippers. And required fabrication job by gascutting and welding. |
| 34 | Checking of pipes and leakage rectification at delivery pipe line after running of pump. |
| 35 | Supply of Oxygen Cylinder(9 nos) |
| 36 | Supply of DA Cylinder(3 nos) |
| 37 | Supply of 6\\" dia MS flange with 10 mm (51 nos) |
| 38 | Supply of 5/8X 2\\" MS nut bolt(34.6 kg) |
| 39 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |