|
| 1 | Supplying and fixing MCB SS enclosure with IP-20/30 protection, powder coated provision for two/four pole MCB, concealed in wall after cutting the wall & mending good the damages to original finish incl. painting, connection & provision for earthing attachment |
| 2 | 2 Way |
| 3 | Supplying and fixing 240/415 V DP MCB of Breaking capacity 10kA & C characteristics on din rail ofexisting DBs and necessary connection |
| 4 | 6-32 A |
| 5 | Supplying and fixing PVC Rigid Conduit 'FR' [Precision Make] on wall, ceiling with saddles and other accessories as required and mending good damages to building works |
| 6 | 20mm size. |
| 7 | Sub Head 1 :- Supply & Laying of Cables |
| 8 | Supplying and Delivery of following sizes Al. armoured PVC/XLPE cable (Havells/polycab/KEI) as mentioned below : |
| 9 | 2 core 10 sqmm |
| 10 | 4 core 10 sqmm |
| 11 | Laying of one No. cable upto 35 sqmm in underground trench 460 mm wide x 760 mm average depth, with brick protection on the top of the cable with 8 (eight) Nos. bricks per metre, including filling the space between the brick & cable and also the trench with shifted soil, leveling up and restoring surface duly rammed |
| 12 | 2/4 core 10 sqmm |
| 13 | Supplying and fixing compression type gland complete with brass gland, brass ring & rubber ring for dust & moisture-proof entry of XLPE/PVC armoured cables as below : |
| 14 | 2 core 10 sqmm |
| 15 | 4 core 10 sqmm |
| 16 | Finishing the end of following XLPE/PVC armoured cables by crimping method incl. supplying and fixing solderless socket (Dowels make), tapes, anticorrosive paste & jointing materials : |
| 17 | 2 core 10 sqmm |
| 18 | 4 core 10 sqmm |
| 19 | Sub Head 2 :- Shifting Door & Window at LT Panel Room Door |
| 20 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. above 150 mm. thick |
| 21 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] |
| 22 | 1:2 cement mortar (to be used in floors and for special works) |
| 23 | (a) 15 mm. thick plaster. |
| 24 | Labour for taking out door and window frame including shutter for repair or replacement of different parts of the frame & refixing the same including mending good all damaes complete. (Concrete and brick work for mending damage will be paid separately) |
| 25 | Upto area 2.5 Sq.m. Wooden Window frame in old sub-stn LT Panel Room. [1.25x1.4]M= 1.75 Sq.M ** The window frame Is taken out only but not refixed. Thus rate is considered @50% of Schedule rate i.e. Rs.119/-Sq.M/2= 59.5/Sq.M |
| 26 | Above area 2.5 Sq.m. Wooden Door Frame in sub-stn LT Panel Room[2.14x1.22]M= 2.611 |
| 27 | Taking out door and window shutters and rehanging the same with old fittings. |
| 28 | With new iron screws. Wooden Door shutters in sub-stn LT Panel Room[2.04x1.02]M= 2.081 |
| 29 | White washing including cleaning and smoothening surface thoroughly |
| 30 | All floors : |
| 31 | Two coats (to be done on specific instruction). |
| 32 | Renewing M.S. clamps for door and window frame made of flat bent bar, end bifurcated with necessary screws etc. In cement concrete(1:2:4) including cutting of brick work/concrete work as per direction. (Cost of concrete will be paid separately ) |
| 33 | 40mm X 6mm, 200mm Length. |
| 34 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. |
| 35 | River bazree. |
| 36 | (a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in groundfloor. |
| 37 | Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr. HT & LT Cable Trench Hole Opening Cover at New Sub-Stn Bldg |
| 38 | Sub Head:- Trench work for Panel Installation at Covid Building |
| 39 | Brick work with 1st class bricks in cement mortar (1:4) |
| 40 | In superstructure, ground floor. |
| 41 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortarincluding rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] |
| 42 | 20 mm thick plaster. |
| 43 | Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. |
| 44 | Sub Head:- Under Pass Pipe Laying for cable passing |
| 45 | Supplying, laying, fiting, fixing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of 1.10 Mtr |
| 46 | (A) Pressure Rating : Class - III (6 Kg/cm2)Laying of pipe line including cost of pipe only including cost of specials/ fittings & valves. [Make- Supreme] |
| 47 | Laying only Cable above 50 sqmm but not exceeding 400sqmm through existing RCC/ Hume/GI Pipe/open masonary trench for single, 2, 3, 3½ and 4 core (2X240 Sq.mm. Cable in front of Covid Bldg.) [2X39.5]=79Mtr. Cable relaying in front of Covid Bldg. |
| 48 | Sub Head :- Repairing of Damged Street Light Pole |
| 49 | Supply of XLPE Insulated & unarmoured stranded Copper Conductor control cables having following numbers of core for Working Voltage up to 1100 Volts of following sizes [Make Polycab / RR /KEI/Havells/ Gloster as approved by E.I.C] |
| 50 | 3 Core 1.5 Sqmm. |
| 51 | Supplying & Fixing GI waterproof type looping cable box size 200x150x100 mm deep having 4 mm thick comprising of one 250 V 15 A kit-kat fuse unit, one NL on porcelain insulator, one compression type brass cable gland for upto 2- core 16 sqmm PVC/A cable and having lined with rubber gasketted GI top cover with brass machine screws etc., earthing terminal with lug, onsteel tubular pole near base, including S&F 40x6 mm thick, MS clamps with bolts, nuts etc. including painting with anticorrosive paint |
| 52 | Finishing of the PVC insulated wire ends by socketting with pin/ ring type copper sockets and insulated tapes etc., including supplying sockets, tapes. |
| 53 | 16 sqmm |
| 54 | Finishing of the PVC insulated wire ends by socketting with pin/ ring type copper sockets and insulated tapes etc., including supplying sockets, tapes. |
| 55 | 2.5sqmm . |
| 56 | Supply and Fixing of single arm bracket of minimum dia 40mm dia. With holder and nut bolt cap. |
| 57 | Straigh through Jointing of cable of different size by compound jointing kit including S&F ferrul, tapes and jointing materials (Brand approved by EIC) |
| 58 | 2 core 10 sqmm cable |
| 59 | Finishing the end of following XLPE/PVC armoured cables by crimping method incl. supplying and fixing solderless socket (Dowels make), tapes, anticorrosive paste & jointing materials : |
| 60 | 2 core 10 sqmm cable |
| 61 | Supply and Installation of 84 AH , 12V Sealed Maintenance free,VRLA Batteies For 250 KVA DG (Make-Cummins/ Exide Powersafe Plus series/ AMARON QUANTA Series ) For OPD. |
| 62 | Note: 1) All the above rates should be quoted inclusive of all taxes, duties and all ancilery charges with cost of maintenance, servicing, supply & replacement of spares for 1 (One) year from the date of commissioning. 2) Total is rounded off to the nearest rupees. Please Enable Macros to View BoQ information |