| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres in All kinds of soil |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All kinds of soil : |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) |
| 5 | Providing and laying in position specified grade of reinforced cement concrete inclu. curing but excluding the cost of centering, shuttering, finishing & reinforcement. All works upto plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone agg. 20 mm nominal size) |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 7 | Centring and shuttering including strutting propping etc and removal of form work |
| 8 | Foundations, footings, bases of columns etc. for mass concrete |
| 9 | Suspended floors, roofs, landing, balconies and access platforms. |
| 10 | Edge of slabs and break in floors and walls Under 20 cms wide. |
| 11 | Providing and laying 75mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge |
| 12 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 13 | Providing and laying dry stone agg. Using 40mm nominal size incl. spreading,levelling sand grouting, watering, ramming, etc all complete |
| 14 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in theproportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete 600 mm dia. R.C.C. pipe |
| 15 | Supplying and laying including digging, carrying by lorry, filling River Bed Material including watering & consolidation in layers to specified lines, camber, grades and cross sections. Finished work. |
| 16 | Hand packing stones in wire crates including the cost of stones and cost of crates. |
| 17 | carriages of materials by mechinical trancsport incl. loading, unloading and stacking complete |
| 18 | Sand for a lead of 4 kms. |
| 19 | stone agg below 40mm 4 kms. |
| 20 | stone/Boulders for an lead of 4 kms. Please Enable Macros to View BoQ information |