| 1 | All in all comprehensive maintenance including servicing , replacement of fuel - filter, coolant , lubricating oil etc of Diesel Generating set including auto mains failure (AMF) panel , change over switch , earthing etc as per OEM guidelines and maintenance manual complete in all respet. (Excluding replacement of batteries as and when required.)(250kvax12 Month=3000) |
| 2 | Above 62.5 KVA |
| 3 | All in all comprehensive maintenance of Automatic power factor correction panel including repair / replacement of defective componenets to maintain the power factor as per Discom's permissible limit and without any penalty or surcharge.(200 KVAR x12 month=2400) |
| 4 | Above 125 kvar APFC Panels |
| 5 | All in all comprehensive maintenance of 11/0.415 KV or 33/0.415 KV Distribution sub station including 11 KV circuit Breaker , Transformer and its complete accessories , Auto transfer switch ,repairing of LT/HT cables with terminations, LT panel with complete accessories , Sub station Earthings etc with maintaining of Log Books complete in all respect but excluding of transformer oil as and when required.(500KVA x12=6000) |
| 6 | Substation Up to 500 KVA rating Transformer |
| 7 | Replacement of existing transformer oil confirming to IS: 335 after removing of old oil and remove from site (old oil shall be retained by the contractor) |
| 8 | Charges for Testing of transformer oil for its viscosity and dielectric strength including collection of sample from top and bottom of the existing transformer tank and submission of test report complete with all T & P , labour etc as required . |
| 9 | Charges for Collection , Filtration and dehydration of existing transformer oil with the help of high vaccum filtration machine and cleaning of core-coil assembly by hot oil for removal of sludge / dust particles etc. as required. |
| 10 | Supply and filling of fresh transformer oil as per IS: 335 in existing transformer along with submission of oil test report for its physical and chemical properties.The oil shall be clear and free from any suspended matter or sediments complete as required complete in all respect. . |
| 11 | Repairing of LT/HT bushings of Distribution Transformers including replacement of brass studs , porcelain insulators , nut bolts , oil seals , gaskets etc. complete as required complete in all respect. . |
| 12 | LT Bushing Set |
| 13 | 500 KVA |
| 14 | Replacement of Silica gel Breather of Distribution Transformers of following capacities complete in all respect. . |
| 15 | 500 KVA |
| 16 | Replacement of gasket of Distribution Transformers of following capacities complete in all respect. . |
| 17 | 63 KVA to 500 KVA |
| 18 | Providing Manpower through Contracting agency for Supervision / Execution / Operation of various Electromechanical Installations. (one shift of 8 working Hrs per day for 26 Working Days in a month) on basis of minimum wages + VDA order Dt. 28.03.2025 Ministry of Labour and Employement Govt. of India |
| 19 | Pump Operator, AC Plant Operator, ELV System Operator, Lift Operator, DG set Operator or any other services operator with experience of 3 years in relevant field ) Please Enable Macros to View BoQ information |